Powered By Kitlog Pro v2.0
RV-10 Project - N786PS
RV-10
All
155 Logs Found
Date
Hours
Work Log Summary
Details
11-21-2010
8.0
Mounting of the tires/tubes to the wheels
Details
10-19-2009
1.0
Attaching the HS to the Tailcone
Details
10-18-2009
6.0
Fitting the Elevators to the HS
Details
10-17-2009
2.0
Re-Installation of the F-1012A's (Priming Seat Rai
Details
10-16-2009
2.0
Trimming/Priming of F1012A and B
Details
10-15-2009
0.5
Removal of F-10102A and B (Continued)
Details
10-14-2009
2.0
Removal of F-10102A and B
Details
10-13-2009
0.0
No work - just reading
Details
10-12-2009
1.0
Repairing Longerons on QB Fuse
Details
10-11-2009
6.0
Replacement of AN Hardware
Details
10-10-2009
2.0
AN Hardware replacment
Details
10-08-2009
2.0
Replacement of AN HW - Continued
Details
10-08-2009
0.3
Installation of Control Columns
Details
10-07-2009
1.7
Changing out AN-3 HW - Left Main
Details
10-04-2009
6.0
Attened EAA SportAir Workshop - Electronics
Details
10-03-2009
8.0
Attended EAA Sport Air Workshop - Electronics
Details
10-02-2009
2.0
Trimming the Control Column Mount
Details
10-01-2009
1.0
Torquing the landing gear mounts
Details
09-30-2009
1.5
Torquing Right Gear
Details
09-28-2009
1.0
Continuing with QB inspection
Details
09-27-2009
1.0
Completion of QB inspection on 29-14
Details
09-26-2009
3.0
Continuing with QB inspection on Chapt 29.
Details
09-25-2009
3.0
Inspection of 29-1 thru 29-7
Details
09-24-2009
3.0
Completion of Chapt 28
Details
09-23-2009
1.5
Finishing Right Main & Removing Heater Boxes
Details
09-22-2009
1.5
Repairing Landing Gear Mount
Details
09-21-2009
1.0
Trying to fix the landing gear hole
Details
09-20-2009
2.0
Removal of Right Main Gear Mount
Details
09-20-2009
2.0
Continuing with the inspection on Chapt 28
Details
09-19-2009
6.0
What a terrible day.........
Details
09-18-2009
2.0
Inspection of QB Work
Details
09-17-2009
3.0
Inspection of QB work
Details
09-14-2009
0.0
Day Off
Details
09-12-2009
4.0
Double Checking work in Section 25
Details
09-11-2009
6.0
Completion of Inventory
Details
09-10-2009
4.0
Inventory of Fuselage Kit
Details
09-09-2009
1.0
Fuselage Delivery
Details
02-02-2009
3.0
Riveted the Aft Top Skin to the Tailcone
Details
01-12-2009
1.0
Riveting the tailcone
Details
01-11-2009
6.0
Priming, Dimpling, Clecoing - Tailcone
Details
01-10-2009
4.0
Riveting the tailcone components
Details
01-05-2009
3.0
Priming Misc Parts of the Tailcone
Details
01-04-2009
4.0
Priming - Tail cone parts
Details
01-03-2009
9.0
Priming the Tailcone
Details
09-09-2008
2.0
Bending the Trim Tab Skins
Details
09-08-2008
1.0
Left Elevator Trailing Edge & Rt Counterbalance
Details
09-07-2008
3.0
Uh Oh - Reworking the right elevator
Details
09-07-2008
1.0
Gluing the trailing edge of the left elevator
Details
09-06-2008
3.0
Building Jigs & Rolling leading edges
Details
08-31-2008
6.0
Closing up the Right Elevator
Details
08-30-2008
2.0
Riveting the Right Elevator
Details
08-27-2008
1.0
Dimpling Skins - Right Elevator
Details
08-25-2008
1.0
Dimpling
Details
08-24-2008
6.0
Deburring and Priming - Right Elevator
Details
05-25-2008
5.0
Priming Elevators
Details
04-25-2008
0.0
Phone call to Vans - Re Elevator Spar
Details
04-24-2008
0.5
Assembling the Elevator Skeleton
Details
04-23-2008
0.5
Elevator layup & hinge doublers
Details
04-22-2008
1.0
Elevator Skins
Details
04-22-2008
1.0
Elevator Shear Clips
Details
04-20-2008
2.0
Fluting Elevator Tip Ribs
Details
04-19-2008
3.0
Deburring Elevator Stiffners & Fluting
Details
04-18-2008
1.0
Deburring Elevator Stiffiners
Details
04-13-2008
5.0
Completion of the HS
Details
04-12-2008
4.0
Riveting HS - FWD Spar & Stringers
Details
04-09-2008
1.0
Riveted Front Spar - HS
Details
04-08-2008
1.0
Riveting the HS forward spar to the nose ribs
Details
04-08-2008
2.5
Riveted HS Nose Ribs
Details
04-08-2008
1.5
Dimpled the HS Skins
04-07-2008
4.0
HS Dimpling / Skeleton Riveting
Details
04-06-2008
4.0
Priming the HS Parts
Details
04-03-2008
2.0
Seperating the Elevator Stiffiners
Details
04-03-2008
2.0
Finished Countersinking HS Spars & Stringers
Details
04-01-2008
0.0
Phone call to Cogsdill
Details
04-01-2008
4.0
HS Polishing Touches and Countersinking of HS Spar
Details
03-31-2008
1.0
Debur HS Skins
Details
03-31-2008
2.5
Continuing to Debur HS
Details
03-31-2008
0.8
Completed HS Deburr
Details
03-30-2008
1.0
Finished Deburring HS Ribs
Details
03-29-2008
0.5
HS Inspar Ribs - Debur
Details
03-29-2008
3.0
HS Drill & Debur
Details
03-28-2008
1.5
Final Drilling HS
Details
03-08-2008
1.0
Building up the HS to the rear spar
Details
03-05-2008
3.0
Fitting the ribs to the spar's
Details
03-04-2008
1.5
Debur HS Skins
Details
02-10-2008
3.0
Riveting the FWD Spar components
Details
02-09-2008
2.0
Priming the FWD spar components
Details
02-08-2008
1.0
Deburring HS Fwd Spar Holes
Details
02-07-2008
2.0
Working on the FWD Spar
Details
02-04-2008
2.0
Riveting the HS Rear Spar
Details
02-02-2008
3.0
Cleaning and Priming HS rear spar
Details
12-12-2007
0.5
Forward Spar
Details
11-22-2007
5.0
Riveting the Rudder
Details
11-21-2007
0.0
Tech Counselor Visit
Details
11-18-2007
1.5
Riveting Rudder
Details
11-17-2007
4.0
Priming and Riveting Rudder
Details
11-16-2007
1.0
Rudder
Details
11-15-2007
3.0
Rudder Trim - Getting Closer
Details
11-14-2007
3.0
Rudder Trim - (still)
Details
11-13-2007
3.0
Rudder Trim
Details
11-10-2007
5.0
Rudder Trim
Details
11-07-2007
4.0
Rudder L-Brackets
Details
11-06-2007
1.5
Rudder Trim
Details
11-05-2007
1.0
Rudde Trim
Details
11-04-2007
3.0
Rudder Trim Tab
Details
11-03-2007
4.0
Conroe Visit - VS Touchup - Rudder Trim
Details
11-01-2007
3.0
Completion of the VS
Details
10-31-2007
3.0
Riveting the VS Skin
Details
10-30-2007
3.0
Riveting the VS Skeleton
Details
10-29-2007
2.0
Priming the VS
Details
10-28-2007
3.0
Alodine Testing
Details
10-24-2007
4.0
Match Drilling / Deburring / Dimpling Skin
Details
10-22-2007
4.0
Debur Skeleton and fit skin
Details
10-21-2007
2.0
Shaping VS Nose Ribs
Details
10-19-2007
4.0
VS Deburring and Drilling
Details
10-13-2007
6.0
Starting the VS (again)
Details
10-08-2007
2.0
Removing Rudder Skins and Deburring
Details
10-07-2007
3.0
Final Drilling Rudder
Details
10-06-2007
3.0
Clecoing the Rudder Skins to the Skeleton
Details
10-04-2007
2.0
Rudder Skeleton
Details
10-03-2007
3.0
Third Attempt at Rudder Control Horn
Details
09-29-2007
3.0
Second Attempt at Rudder Horn
Details
09-26-2007
4.0
Riveting the Verical Stab
Details
09-25-2007
1.0
Removing Skin
Details
09-24-2007
3.0
Prime Skin and start riveting
Details
09-23-2007
3.0
Re-Skin of the VS
Details
09-22-2007
4.0
Riveting the VS Skeleton
Details
09-21-2007
3.0
Clean / Alodine / Prime Replacement VS parts
Details
09-19-2007
3.0
Completion of VS Construction
Details
09-13-2007
4.0
VS Rear Spar Work
Details
09-12-2007
4.0
VS Rear Spar (Reworking)
Details
09-01-2007
8.0
Rudder Assembly and Horizontal Stabilizer Assembly
Details
08-31-2007
2.0
Shaping Rudder Ribs
Details
08-30-2007
2.0
Seperating Rudder Parts
Details
08-28-2007
0.1
Taking a step back
Details
08-26-2007
4.0
Getting started with rivets - Kinda
Details
08-25-2007
3.0
Prep and Prime
Details
08-25-2007
2.5
Finishing the paint booth
Details
08-24-2007
4.0
Building a Paint Booth
Details
08-23-2007
0.5
Starting page 6-4
Details
08-23-2007
1.0
Completion of 6-3
Details
08-22-2007
0.5
Completion of VS Skin Dimples
Details
08-21-2007
2.0
Debur Skeleton and Begin Dimpling Skins
Details
08-20-2007
2.5
Match Drilled VS Skin and Debur
Details
08-19-2007
3.0
Attaching the skin to the Vertical Stabilizer
Details
08-18-2007
4.3
6-3 Assembly of VS Skeleton
Details
08-18-2007
2.0
6-2 Completion
Details
08-17-2007
4.0
6-2 Drilling VS-1003 and VS-1014's
Details
08-16-2007
3.0
Inventory Completion
Details
08-16-2007
1.5
6-2 Shaping VS-1014
Details
08-15-2007
4.0
Empennage Delivery and Inventory
Details
08-05-2007
0.0
Visit Dave Syvertson
Details
08-01-2007
0.0
Empennage Kit - Ordered
Details
07-24-2007
1.0
Avery RV-10 Tool Kit - Inventory
Details
07-20-2007
0.0
Avery RV-10 Tool Kit - Ordered
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
All
Empennage
Fuselage
Landing Gear
None
PreBuild Preparation
Repairs
Tools
Training
Copyright © 2001-2013 Matronics. All Rights Reserved.