Powered By Kitlog Pro v2.0
RV-10 Project - N786PS
RV-10
All
8-30-2007
< Previous Log Entry
Next Log Entry >
Date:
8-30-2007
Number of Hours:
2.00
Manual Reference:
7-2 & 7-3
Brief Description:
Seperating Rudder Parts
While waiting for the replacement Vertical Stabilizer (Section 6) parts to arrive, I decided to start on the Rudder (Section 7).
The first two pages 7-2 and 7-3 involve seperating parts.
7-2 Step #1: Seperated the Top Rib into individual components. After seperated R-1003 turns into R-1003A and R-1003B.
7-2 Step #2: Seperated the Botton Rib into individual components. After seperated R-1004 turns into R-1004A and R-1004B.
7-2 Step #3: Seperated the Sheer Clips into individual components. After seperated R-1010 turns into R-1010A thru R1010G.
7-2 Complete
7-3 Step #1 Seperated the first three stiffeners into individual components. R-1015A,B, & C (Right and Left are completed).
Tomorrow, I will work on the final four and move on to 7-4.
Measuring the stiffeners for R1015
The first three stiffeners seperated into 6 pieces.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
155
402
Empennage
113
296
Fuselage
32
75
Landing Gear
1
8
None
3
2
PreBuild Preparation
1
4
Repairs
1
2
Tools
2
1
Training
2
14
Copyright © 2001-2024 Matronics. All Rights Reserved.