Powered By Kitlog Pro v2.0
Michaels Web Site
Sonex Standard Gear
Empennage
100 Logs Found
Date
Hours
Work Log Summary
Details
01-07-2012
4.3
Tail fairings complete
Details
01-02-2012
0.3
Tail fillets
Details
12-29-2011
2.0
Rudder hinge, stops & fillets
Details
12-29-2011
0.0
Misc shots of project to date
Details
12-28-2011
2.0
Secure vertical stab bolts
Details
12-27-2011
0.0
Vertical stabilizer tail post
Details
12-27-2011
3.5
Bolting down vertical tail
Details
12-26-2011
1.3
Vertical stabilizer attachment
Details
12-26-2011
1.8
Secure horizontal stab
Details
12-23-2011
1.8
Fit horizontal stabilizer
Details
12-21-2011
0.5
Deburring tail holes
Details
12-19-2011
2.3
Horizontal Tail Attach
Details
12-18-2011
0.0
Horizontal Tail Attach
Details
06-12-2011
2.5
RIGHT horiz tail tip installation
Details
06-11-2011
4.5
Horiz tail tip installation
Details
06-11-2011
0.0
Horiz tail tip installation
Details
06-09-2011
1.0
LEFT horiz tail tip installation
Details
06-08-2011
1.3
LEFT horiz tail tip installation
Details
06-07-2011
1.0
Horiz tail tips
Details
03-12-2011
1.5
Vertical tail tip
Details
03-09-2011
0.8
Vertical tail tip
Details
03-08-2011
1.5
Vertical tail tip
Details
03-08-2011
0.0
Vertical tail tip
Details
03-08-2011
0.0
Vertical tail tip
Details
03-07-2011
2.5
Vertical tail tip
Details
03-07-2011
0.0
Vertical tail tip
Details
03-06-2011
1.0
Tail tip ponderings
Details
01-11-2011
3.3
FINISHED THE RUDDER!
Details
01-10-2011
2.5
Rudder hing layout and drilling
Details
01-08-2011
2.5
Drilled rudder for all ribs
Details
01-07-2011
1.3
Holes in rudder skin for ribs
Details
01-05-2011
1.0
Cut outs in rudder
Details
01-04-2011
2.0
Bent rudder skin
Details
12-02-2010
0.5
T13 Rudder skin
Details
09-18-2010
0.5
Trim tab; Finished T02
Details
09-16-2010
0.0
FINISHED the elevators!
Details
09-16-2010
1.3
FINISHED the elevators!
Details
09-15-2010
3.0
Deburr & rivet elevator skins
Details
09-14-2010
1.5
Updrilling & deburring elevators
Details
09-13-2010
2.8
Elevator hinges & updrilling
Details
09-12-2010
1.8
Elevator hinges
Details
09-11-2010
1.5
Finished elevator horn
Details
09-11-2010
1.5
Attached elevator horn assembly
Details
09-10-2010
2.8
Elevators + Elevator Horn
Details
09-09-2010
2.5
Right, then back to left, elevator
Details
09-08-2010
2.3
Right elevator
Details
09-07-2010
2.0
Left elevator
Details
09-06-2010
2.0
Trim tab & elevator hinges
Details
09-06-2010
2.5
Elevators
Details
09-01-2010
1.5
Elevator skins & trim tab
Details
08-31-2010
0.8
Finished 1st elevator skin; started next
Details
08-30-2010
1.8
Bent then cut 2nd elevator skin
Details
08-29-2010
1.8
Bent the first elevator skin
Details
08-26-2010
1.8
Elevator skins
Details
04-06-2010
2.8
Horiz and vert stabs
Details
04-05-2010
4.0
Continued skinning horiz stab
Details
04-04-2010
1.5
Continued 2nd skin of horiz stab
Details
04-03-2010
2.0
Started on 2nd skin of horiz stab
Details
04-02-2010
1.0
Finished riveting 1st skin of horiz stab
Details
04-01-2010
3.0
Updrilled holes in 1st horiz stab skin
Details
03-31-2010
2.5
Started skinning the horizontal stabilizer
Details
03-29-2010
1.5
Rivets on 2nd side of vert stab
Details
03-28-2010
4.8
Started skinning the vert stab
Details
03-28-2010
0.0
Photos of vert tail skinning
Details
03-28-2010
0.0
Photos of vert tail skinning
Details
03-28-2010
0.0
Photos of vert tail skinning
Details
03-27-2010
3.0
Finished framing of horiz stab
Details
03-26-2010
3.5
Finished vert stab framing (mostly)
Details
03-24-2010
1.3
Started drilling vert stab
Details
03-23-2010
3.0
Layout of vert stab
Details
03-21-2010
1.3
T13-02 Rudder drive horn assembly
Details
03-21-2010
1.0
Finished T09-01 vert stab main spar
Details
03-20-2010
3.0
Continued main spar of vert stab
Details
03-20-2010
2.5
Continued main spar ass'y of the vertical stab
Details
03-19-2010
2.8
Forward spar of vert stab
Details
03-10-2010
1.5
Deburred & riveted Horiz Stab ribs
Details
03-09-2010
3.0
Continued with Horiz Stab
Details
03-08-2010
2.5
Horiz stab ribs
Details
03-07-2010
2.5
Finished main spar assembly of horiz stab
Details
03-06-2010
3.0
Horiz stab, front spar ass'y
Details
03-06-2010
2.5
Forward and Main Horiz Stab Assemblies
Details
03-05-2010
3.3
Started BUILDING horiz stabilizer
Details
03-02-2010
0.8
2 channels for tail
Details
03-01-2010
1.0
Bending tail channels
Details
02-28-2010
2.3
Bending channels for the tail
Details
02-01-2010
2.8
Channels for tail & fuselage + wing nose rib
Details
01-31-2010
2.0
Lay out channels for horiz stab
Details
01-23-2010
3.0
Tail and Fuselage Channels
Details
01-22-2010
0.0
#3 Final photos of channel bending process
01-22-2010
0.0
#2 More photos of channel bending process
01-22-2010
1.8
#1 Creating channels
Details
01-05-2010
1.5
Wing & Tail Parts
Details
01-04-2010
0.8
T05-01 L
Details
01-02-2010
4.0
Finished 2 empanage skins
Details
01-01-2010
4.8
Empenage skins
Details
12-29-2009
0.5
Prepped for empenage skins
Details
12-28-2009
0.5
Fluted tail ribs
Details
12-18-2009
3.0
Empenage Ribs
Details
12-11-2009
2.0
Bent tail ribs
Details
12-08-2009
0.5
Deburring .025 parts
Details
SITE NAVIGATION
Contact Builder
Sonex Standard Gear Home
All
Aluminum Materials
Angle Parts
Avionics
Bending Brake
Canopy
Controls
Cowl
Empennage
Engine
Finish-Polish
Fuel System
Fuselage
Hardware
Landing Gear
Learning Point
Miscellaneous
None
Prop
Smoke System
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.