KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  4-1-2010
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Updrilled holes in 1st horiz stab skin

Bent the skin onto side 2, aligned it with the guidelines on the framing members, then updrilled all the holes, except for the holes at the tips (to allow for future installation of the fiberglass tips) and the trailing edge on the top side, where the elevator hinge will go (I want to updrill those holes with the hinge in place so everything lines up).

After bending the skin, cleco'ing and updrilling, of course I had to take the whole thing apart to deburr all the framing members and the skin.

I then got the skin re-cleco'd ont the first side. I'll rivet tomorrow night after I get back from a presentation by my EAA Chapter 106, on beginning aerobatics.
' style=

1st skin fitted on the frame, with both sides cleco'd in place

1st skin fitted on the frame, with both sides cleco'd in place

' style=

All holes updrilled for rivets, except for trailing edge where hinge will go

All holes updrilled for rivets, except for trailing edge where hinge will go

' style=

Everything deburred and ready for rivets on the first face

Everything deburred and ready for rivets on the first face

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.