KitLog pro

Powered By Kitlog Pro v2.0

Michaels Web Site
' style=
Date:  3-21-2010
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Finished T09-01 vert stab main spar

Finished assembly T09-01, Main Spar of vert stab, by drilling the holes in the lower strap for the AN3 bolts. The final step of installing the bolts, I'll do when I get the hardware.
' style=

T09-01 complete, except for the bolts.

T09-01 complete, except for the bolts.

' style=

Close-up of the angle clips. T12-05 is on a temporary spacer that gets removed when the tail's mounted

Close-up of the angle clips. T12-05 is on a temporary spacer that gets removed when the tail's mounted

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.