Brief Description: Finished vert stab framing (mostly)
Finished putting together and riveting the vertical stabilizer. I am leaving the tip rib unriveted until I get the fiberglass tip and figure out how it's going to install. I still don't have the AN bolts to finish the lower main spar, so I have some temporary bolts in until they arrive.
Then I set up my plastic "spray booth" so I can polish the vert stab skin tomorrow.