Powered By Kitlog Pro v2.0
Michaels Web Site
Sonex Standard Gear
Empennage
6-12-2011
< Previous Log Entry
Next Log Entry >
Date:
6-12-2011
Number of Hours:
2.50
Manual Reference:
Brief Description:
RIGHT horiz tail tip installation
- Layed out and drilled the pilot holes in the RIGHT tail tip
- Duct taped the tip in place and pilot drilled into the ribs
- Updrilled, deburred and riveted the tip in place
The RIGHT tail tip finished
Truly finished horiz stab
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex Standard Gear Home
All
Aluminum Materials
Angle Parts
Avionics
Bending Brake
Canopy
Controls
Cowl
Empennage
Engine
Finish-Polish
Fuel System
Fuselage
Hardware
Landing Gear
Learning Point
Miscellaneous
None
Prop
Smoke System
Tools
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.