KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
Work Logs Found: 43
Category Work Time: 123 Hours
 Date
Hours
Work Log Summary

Details

 09-06-2014
1.00
Rubber gap seal installed left wing root
Details
     

 08-09-2013
0.25
changed pitot aluminum to plastic transition in wi
Details
       

 04-12-2012
0.75
Wing T405 bracket cuts
Details

 03-12-2012
1.50
Final nutplate instalation and nylon pitot line
Details
       

 03-07-2012
3.25
Rt wing inbd edge platenut install-2
Details
       

 03-04-2012
6.50
Finish plate nuts on left wing and start right win
Details
       

 03-03-2012
5.00
left wing inbd rib nutplate install-1
Details
       

 12-02-2011
6.00
Right wing bottom obd wing panel
Details
       

 11-27-2011
5.00
Final rivitting of the left bottom wing panel
Details
       

 11-26-2011
3.00
Left wing bottom obd skin rivitting-1
Details
       

 11-16-2011
4.00
NACA vent install and Tank attach bracket
Details
       

 11-04-2011
1.00
Aileron control stop modification
Details
       

 08-14-2011
0.50
L and R fuel tank leak test
Details
     

 08-13-2011
0.25
Fuel tank left side leak test try #2
Details
     

 08-08-2011
0.50
Fuel tank leak test-1 Left tank
Details
       

 07-23-2011
2.00
Fuel tanks closed up
Details
       

 07-17-2011
1.00
Wire run for wing lights and stall warning
Details
       

 07-09-2011
0.75
Retorque
Details

 07-02-2011
3.50
Stall warner final assembly/instal (minus power su
Details
       

 06-30-2011
6.00
Stall warner assembly
Details
       

 06-29-2011
3.50
Scarfing corners, access panel plate nuts, primer
Details
       

 06-29-2011
3.00
left side flap install
Details
       

 06-27-2011
0.75
bottom wing skin
Details

 06-26-2011
3.75
Left wing bottom obd skin
Details
       

 06-25-2011
4.00
Rt wing flap install
Details
       

 06-25-2011
3.00
Left wing bell crank and aileron assembly
Details
       

 06-20-2011
5.00
Aileron pushrods and aileron install rt wing
Details
       

 06-18-2011
1.50
Wing skin, ribs, bushings
Details
       

 06-15-2011
5.25
Pitot flaring, Bottom skin work
Details
       

 06-13-2011
1.00
bottom obd wing skin
Details
       

 06-12-2011
5.25
Floats, Pitot, Tie downs, spacers, head scratching
Details
       

 06-12-2011
0.00
6/12/11 part two pics only
Details
       

 06-11-2011
4.50
Finish fabricating the large aileron pushrods
Details
       

 06-11-2011
3.25
Aileron inbd and obd hinge install
Details
       

 06-06-2011
2.50
Fuel float bend and cut. Aileron control stop tabs
Details
       

 06-06-2011
3.50
Aileron push rods
Details
       

 06-05-2011
1.50
push rods
Details
       

 06-05-2011
4.00
Aileron gap fairing
Details
       

 05-30-2011
2.75
Flap braces
Details
       

 05-30-2011
3.25
5-30-11 part 2. Flap braces
Details
       

 05-29-2011
2.75
Attaching the aileron brackets to wing spars
Details
       

 05-29-2011
4.25
Aileron brackets
Details
       

 05-28-2011
3.00
Quickbuild wings plans
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.