KitLog pro

Powered By Kitlog Pro v2.0

Bill & Brendas RV-8 QB
Work Logs Found: 937
Category Work Time: 2064 Hours
 Date
Hours
Work Log Summary

Details

 04-25-2015
0.00
air dams and tailwheel adjust and repair
Details
       

 04-07-2015
0.00
test flight-4
Details
       

 04-04-2015
0.00
Slow flight test and Autopilot basic ops check
Details

 04-02-2015
0.00
down load engine data and prep for flt no,2
Details
       

 04-01-2015
2.00
Hose added to gascolator drain
Details
       

 03-29-2015
0.00
First flight of n882RV
Details
       

 03-15-2015
3.00
Fix some items suggested by DAR
Details
       

 03-14-2015
2.00
re-assembly-1 after AW inspection
Details

 03-12-2015
3.00
DAR visit and inspection
Details
     

 03-11-2015
1.50
re install the fwd floor and seat pan for inspecti
Details

 03-09-2015
1.00
Transponder certification and other
Details

 02-14-2015
4.00
Prep for DAR visit
Details
       

 02-10-2015
0.50
registration displayed and data plate rivited
Details
     

 02-09-2015
1.00
Data plate engraved and positioned on plane
Details
       

 02-01-2015
0.25
Gear leg fairing order
Details
       

 02-01-2015
0.50
canopy closure labels
Details
       

 01-26-2015
3.00
engine baffle gap seal final and hinge pin retaini
Details
       

 01-23-2015
1.50
lower cowl final fit preps for DAR inspection
Details

 01-22-2015
0.50
Plate nuts instaled fpr cowl pin retention
Details
     

 01-22-2015
1.50
Cabin heat intake port redone
Details
     

 01-13-2015
2.00
Fuel calibration 2
Details
     

 01-12-2015
3.00
Fuel gauge calibration
Details
       

 01-11-2015
0.50
Cowl pin retaining screws
Details
       

 12-31-2014
2.50
Stall warner potentiometer for volume control
Details
       

 12-31-2014
1.00
cowl pin alternate set up
Details
     

 12-28-2014
3.00
Hinge fit work
Details
       

 12-26-2014
2.00
Final weight, balance , and cg sheet done
Details
     

 12-21-2014
2.00
Reverse pitch control and clean up
Details
       

 12-20-2014
1.00
Elt batteries and wt and bal sheets
Details

 12-16-2014
0.75
radio and trutrak adjustments
Details

 12-15-2014
1.50
Dynon EMS checklists enetered and uploaded to devi
Details

 12-14-2014
0.25
engine run 4 and 5
Details
       

 12-14-2014
1.00
center front baffle seals rivited and ore adjustin
Details

 12-12-2014
0.25
Engine start three and first taxi test
Details
     

 12-12-2014
1.25
Baffle seals front right
Details
     

 12-11-2014
0.00
remove screen from inlet bafffle as per service bu
Details
     

 12-11-2014
2.00
Baffle gap seals front and fwd sides
Details
       

 12-07-2014
1.50
Rivit on baffle seals on 3 sides
Details

 12-06-2014
2.00
FWD baffle gap seal s
Details
       

 12-02-2014
1.00
engine start two
Details

 11-30-2014
0.75
change ems setting for rpm indicator
Details
     

 11-29-2014
2.00
First engine start and run
Details
       

 11-28-2014
1.50
Prep for first engine start
Details
       

 11-28-2014
0.50
fuel cap tool
Details
     

 11-18-2014
0.00
cowl hinge pin covers new plan
Details
     

 11-17-2014
0.50
RT TANK FUEL FLOW AND LEAK TESTING CHECKED
Details

 11-16-2014
1.00
Retest wig wag and reinstall the rt lwr consoe
Details

 11-16-2014
0.75
Fuel testing rt wing-1
Details
     

 11-15-2014
3.50
wig wag wiring redo
Details
       

 11-14-2014
1.50
wig wag gremlin search
Details

 11-14-2014
1.50
Fuel testing left tank-1
Details
       

 11-13-2014
3.00
Left flap scratch removal and re install and other
Details
       

 11-12-2014
4.00
weight and balance-2 and other
Details
       

 11-11-2014
5.00
weight and balance-1
Details
       

 11-05-2014
0.75
eye bolts added to rudder horm
Details
       

 11-04-2014
3.00
engine baffle seals-1
Details
       

 11-03-2014
1.00
oil door rivited on to cowl and wet sanded primer
Details
     

 11-03-2014
1.00
Final fab attach bolts and heat door cable secure
Details
       

 10-31-2014
1.50
FInish the seal on the FAB, oil and install filter
Details
       

 10-31-2014
1.50
Cowl induction glassing final sanding and primer
Details
 

 10-30-2014
3.00
fab baffle seal
Details
       

 10-30-2014
1.00
cut intake air snout back and then sanded smooth
Details
     

 10-29-2014
3.00
More air snout glass work and oil door fitting
Details
       

 10-21-2014
2.00
Top cowl sanding and wet sanding
Details

 10-21-2014
2.50
Lower cowl cooling inlet seals fabricated abd inst
Details
       

 10-21-2014
1.00
Induction inlet glass day2
Details
       

 10-20-2014
3.00
Cowl carb air induction glass and top cowl sanding
Details
       

 10-19-2014
1.50
upper cowl repoxy coat 3 and 4
Details
       

 10-19-2014
0.50
paint upper end of parking brake mount and label
Details
       

 10-18-2014
4.00
Fwd baggage door aft latch block and door strut in
Details
       

 10-17-2014
5.00
FWD baggage door rebuild final and Lock latch bloc
Details
       

 10-12-2014
1.00
Removed some scratches from the aft end of the can
Details

 10-12-2014
0.75
Front baggage door rebuild- the inner skin
Details
       

 10-12-2014
1.00
epoxy coat to inside of top cowl
Details
       

 10-12-2014
0.75
Apply N numbers to VS
Details
       

 10-08-2014
1.00
Plugs for inside fuse and gather plans and organiz
Details
       

 10-08-2014
5.00
oil door
Details
       

 10-07-2014
1.50
final lower cowl prep and wetsanding
Details
     

 10-06-2014
1.50
Finish baggage door outer skin rivits and install
Details
       

 10-05-2014
2.00
Sanding top cowl and sand and fill work on bottom
Details
       

 10-05-2014
1.50
Baggage door rebuild-2
Details
     

 10-04-2014
1.50
Bottom cowl primered with coat 1
Details
     

 10-03-2014
1.00
Sanding the bottom cowl again
Details

 10-03-2014
3.00
Fwd baggage door rebuild-1
Details
       

 10-02-2014
3.00
More exterior sanding and epoxy application
Details
     

 09-28-2014
3.00
Bottom cowl micro and top cowl epoxy pin hole fill
Details
       

 09-27-2014
2.50
label cb switch panel and misc
Details
       

 09-24-2014
2.50
Labels-2
Details
       

 09-24-2014
2.00
Labels-1
Details
       

 09-22-2014
3.00
emp fairing and gap seal final install fit
Details
       

 09-19-2014
4.00
propeller/spinner gap plates rivited on, misc
Details
       

 09-19-2014
5.00
Front lower cowling sanding and epoxy
Details
       

 09-09-2014
3.00
Spinner gap plate letft side fabricated and misc
Details
       

 09-09-2014
0.50
emp fairing continues
Details
       

 09-08-2014
0.75
Tied some cht/egt wires to the engine mount with 2
Details
     

 09-08-2014
2.50
Spinner/prop gap filler plate
Details
       

 09-08-2014
0.50
empenage fairiing pinhole filling day 3
Details
     

 09-07-2014
1.00
Rt side wing root cover gap seal install
Details

 09-07-2014
2.50
Last baffle tension rod, Reroute some wires, Heat
Details
       

 09-07-2014
1.00
Emp fairing pin hole filling 2
Details
     

 09-06-2014
1.50
Spinner build up inside and alignment check. Prop
Details
       

 09-06-2014
1.00
Rubber gap seal installed left wing root
Details
     

 09-06-2014
1.25
Gear leg mounting covers cut for clearence and ins
Details
       

 09-06-2014
0.50
Applied straight epoxy mix to the empenage fairing
Details
       

 09-05-2014
2.00
Spinner work and prop bolt safety wire
Details
       

 09-05-2014
2.00
Final fitting of the lower empenage fairing
Details
       

 09-04-2014
5.50
Spinner installation-the plate nuts
Details
       

 09-03-2014
5.00
Propeller blade cut outs in spinner and misc
Details
       

 08-28-2014
1.75
Manifold pressure hose and misc
Details
       

 08-28-2014
2.50
FAB filter bypass door and carb heat door cables r
Details
       

 08-26-2014
1.50
rivit the FAB shell to the top plate
       

 08-26-2014
1.50
Misc engine stuff
Details
       

 08-25-2014
0.50
Propeller install check
Details

 08-25-2014
3.00
Carb heat door install
Details
       

 08-24-2014
2.00
propeller bolt washer modification to fit
Details
       

 08-24-2014
0.25
Prop track preliminary check
Details
     

 08-24-2014
1.00
Adjust left exhaust brackets until the fuel line t
Details
     

 08-23-2014
2.50
temp install of propeller.
Details
       

 08-23-2014
1.75
Glare shield cover installed. Throttle quadrant re
Details
       

 08-23-2014
1.00
finished polishing the exhaust tips and sand and p
Details
     

 08-22-2014
1.50
oil lines and fittings torqued. Fuel lines and pr
Details
     

 08-22-2014
1.50
misc
Details
     

 08-22-2014
2.00
engine case oil breather vent line install
Details
       

 08-21-2014
3.50
Exhaust support hangers fit and install
Details
       

 08-18-2014
5.00
Finish routing and securing all the engine compart
Details
       

 08-14-2014
1.50
Start securing wires on left engine side
Details
       

 08-14-2014
1.00
Gas caps marked
Details
       

 08-13-2014
5.50
Attach throttle and mixture cables to carb. Variou
Details
       

 08-12-2014
1.50
Gas caps and various
Details
     

 08-12-2014
2.00
Exhaust hanging-1 and misc
Details
       

 08-11-2014
0.75
test pitot tube and airspeed indicator for leaks
Details
       

 08-11-2014
0.50
Sand and round trailing edge of rt wing tip
Details
     

 08-11-2014
3.00
fix wiring for trim indicators. Check auto pilot s
Details
       

 08-11-2014
2.00
Attach tail wheel swag chains, polish gas caps, se
Details
       

 08-08-2014
2.00
Wired up right side landing light and nav/strobe l
Details
       

 08-08-2014
1.25
Test exterior lighting and more
Details
       

 08-08-2014
0.25
Secured the belly skin to the bottom wing
Details
     

 08-08-2014
0.50
Left triling edge evened out in line with TE of ai
Details
       

 08-07-2014
1.75
final wing tip lens install
Details
       

 08-07-2014
2.00
Connect taxi light and position light and strobes
Details
       

 08-06-2014
5.50
Wing tip lens final fitting and wing tip lights fi
Details
       

 08-03-2014
4.50
Wing tip lights and lens cover install
Details
       

 08-02-2014
4.00
Finish plate nuts in wing tips. Start lens covers
Details
       

 07-30-2014
4.00
wing tips-4
Details
       

 07-29-2014
4.50
Wing tips -3
Details
       

 07-28-2014
5.00
Wing tips install -2
Details
       

 07-25-2014
2.50
Some assembly and various tasks
Details
       

 07-25-2014
1.50
Fitting wing tips-1
Details
       

 07-24-2014
1.50
right wing wiring connections at root
Details
       

 07-24-2014
3.50
Fuel lines torqued, Front seat pan and belts, cons
Details
       

 07-23-2014
0.50
Torque rear spar bolts and cotter pin.
Details
       

 07-22-2014
0.75
Wing root wiring left side
Details
       

 07-20-2014
5.00
Wing bolts torqued and misc
Details

 07-19-2014
6.00
Install wings
Details
       

 07-15-2014
3.00
Preperations for wing install
Details
       

 07-14-2014
2.00
rudder deflection
Details
       

 07-14-2014
2.00
Molex connectors for fuse to wing junction
Details
       

 07-13-2014
2.50
Wet sand scuff marks from outer edge of windscreen
Details

 07-13-2014
2.50
Primer rudder caps and install
Details
     

 07-13-2014
1.00
Alter rear stick grip for better clearence
Details
     

 07-12-2014
0.75
Sanding prep for primer
Details

 07-12-2014
1.00
Final install of VS and emp fairing adjustment
Details
       

 07-11-2014
4.00
Install HS and elevators-Final assembly
Details
       

 07-10-2014
4.50
Install rear seat restraints abd adjust. Install s
Details
       

 07-09-2014
1.00
Mask off the scratched area around the windscreen
Details

 07-09-2014
4.00
canopy latch install
Details
       

 07-06-2014
2.25
Sand the inside skirt edge until not rubbing again
Details
     

 07-06-2014
3.00
Feather in the windscreen fairing and radius sandi
Details
     

 07-05-2014
1.00
Marked areas of canopyskirt that are too tight aga
Details
       

 07-04-2014
1.00
Some finish work
Details

 07-02-2014
2.00
peel off tape suronding the windscreen
Details
       

 07-02-2014
2.00
canopy skirt sanding and primer-2
Details

 07-01-2014
1.50
windscreen pure epoxy applied
Details
       

 07-01-2014
2.00
Feather sanding of the top cowling upper inlet ram
Details
       

 07-01-2014
1.50
Fab heat door-1
Details
       

 07-01-2014
1.50
Epoxy and acetone slurry applied to skirt
Details
     

 06-30-2014
1.50
upper cowl inlet ramps continues 2
Details

 06-30-2014
1.00
mask and primer the left canopy skirt
Details
     

 06-30-2014
2.00
Install pop rivits into the windscreen fairing
Details
       

 06-30-2014
1.50
Clean and polish canopy center slide rail
Details

 06-27-2014
1.50
sanded the second coat of filler on all the skirt
Details

 06-27-2014
2.00
Sand primer on windscreen fairing-1
Details
       

 06-27-2014
1.00
More sanding on the upper air inlet ramps
Details

 06-26-2014
1.50
Sanded the epoxy down on all the rivit holes in sk
Details
       

 06-26-2014
1.50
sand windscreen inside corners and under aft lip
Details

 06-26-2014
0.50
covered the unneeded scat tube flange in aft baffl
Details
     

 06-25-2014
1.00
sanded the canopy latch hole area and added epoxy
Details
       

 06-25-2014
1.25
Sand a taper edge on aft upper fairing and misc
Details
       

 06-25-2014
2.00
rivit holes to top plate and cut in carb heat hole
Details
       

 06-22-2014
2.25
windscreen upper fairing aft edge final cut to fit
Details
       

 06-22-2014
1.00
Upper cowling upper intake ramp sanding on left si
     

 06-22-2014
1.00
add switch gaurd to stallwarner switch
Details
     

 06-18-2014
5.50
windscreen faiting sanding-8
Details
       

 06-17-2014
5.00
windscreen fariing sanding 7
Details
       

 06-13-2014
2.50
Windscreen fairing sanding-6
Details
     

 06-13-2014
1.25
upper intake cowl ramps epoxy1 and 2
Details
       

 06-04-2014
2.50
windscren fairing sanding-5
Details
       

 06-04-2014
1.75
Left side tension rods revisited
Details
     

 06-03-2014
2.50
windscreen fairing sanding -4
Details
     

 06-03-2014
1.50
Sanded vertical splice gap and top edge
Details
       

 05-30-2014
1.50
Windscreen fairing sanding-3
Details
     

 05-30-2014
1.25
rt side baffle tension rods finished and installed
Details
       

 05-30-2014
0.25
Rivit the ram air intake flanfe to front baffle ra
Details
     

 05-29-2014
5.00
windscreen fairing sanding-2
Details
       

 05-25-2014
4.50
windscreen fairing sanding -1
Details
       

 05-24-2014
2.00
windscreen fairing 4...cake icing
Details
     

 05-24-2014
0.75
New ram air intake cut in to intake ramp
Details
       

 05-24-2014
0.50
Air box slit glassed in -1
Details

 05-21-2014
2.50
Windscreen fairing-3
Details
       

 05-21-2014
0.50
Cut FAB for vertical alignment
Details
       

 05-21-2014
0.75
Canopy skirt sanding left side
Details

 05-20-2014
3.00
windscreen fairing-2
Details
       

 05-20-2014
1.75
Sanding the cowl
Details

 05-19-2014
4.50
windscreen fairing-1
Details
       

 05-16-2014
5.00
windscreen5-final screws install, gap sanding, mas
Details
       

 05-15-2014
5.00
Windscreen-4 masking off and prep for fairing
Details
       

 05-14-2014
0.50
widscreen -3
Details

 05-14-2014
2.50
Glare shield-1
Details
       

 05-12-2014
3.50
windscreen fitting -2
Details
       

 05-11-2014
1.75
Upper fwd skin final riviting
Details
     

 05-11-2014
2.50
Fitting windscreen to canopy and rollbar-1
Details
       

 05-10-2014
3.50
Fwd upper skin riviting-4. The cherry max rivits i
Details
       

 05-07-2014
3.50
fwd top skin-3 riviting the firewall flange
Details
       

 05-06-2014
3.75
Riviting the fwd top skin-2
Details
       

 05-05-2014
5.00
Rivit fwd top skin-1
Details
       

 05-02-2014
2.00
Front baggage area
Details
     

 05-02-2014
3.00
FAB work
Details
       

 04-27-2014
2.00
Rear throttle linkage and adjustments
Details
       

 04-27-2014
2.50
Engine cables sealed in with fire barrier on firew
Details
       

 04-26-2014
0.50
Fab alt air door finished
Details
     

 04-26-2014
5.00
Engine control cables attached to throttle quadran
Details
       

 04-24-2014
5.00
FAB retainer clips-2 and Alt air bypass inlet-1
Details
       

 04-23-2014
5.50
FAB top plate alignment and drilling
Details
       

 04-22-2014
4.50
Alternate air cable, Fab mount, Fab fab upper plat
Details
       

 04-20-2014
1.50
Started the FAB
Details
       

 04-20-2014
2.50
Complete wire issues behind panel
Details
       

 04-19-2014
2.00
Fix OAT probe wiring and install nd probe
Details
       

 04-18-2014
0.50
Researching audio warning wire from EMS
Details

 04-18-2014
2.00
dry fit the thottle and mixture cables to the carb
Details
       

 04-17-2014
4.00
Dynon EMS firmare update and misc wiring fix
Details
       

 04-14-2014
2.00
replace master switch and relay
Details
       

 04-14-2014
3.00
panel install and rear throttle knob and engine co
Details
       

 04-08-2014
6.00
Firmware update try-2 and wiring redo.
Details
     

 04-07-2014
5.00
Wired the mags and alternator and starter. Electri
Details
       

 04-06-2014
1.00
Finsih connectors on EGT sensors and start on P-le
Details
       

 04-04-2014
6.00
Mount oil cooler, Attach EGT probes, Connectorize
Details
       

 04-03-2014
2.50
EGT/CHT wire crimping
Details
     

 04-03-2014
1.50
Begin dry fit of exhaust
Details
     

 04-02-2014
0.75
Seat cushions and panels test fited
Details
       

 04-02-2014
5.00
Rivit baffles and install gussets to baffles
Details
       

 03-30-2014
5.00
Rivit no 4
Details
       

 03-29-2014
5.00
Refit the left aft baffles to cowling and fit oil
Details

 03-29-2014
1.50
Pressurize and leak test the fuel line thru red cu
Details
       

 03-25-2014
5.50
connecting engine sensor wires and misc.
Details
       

 03-20-2014
4.50
Sensor connections
Details
       

 03-20-2014
0.75
bleeding brakes and securing parking brake
Details

 03-18-2014
2.50
More red cube mounting
Details
       

 03-18-2014
0.50
Connectorized the manifold pressure sensor
Details
     

 03-16-2014
1.50
carburator to engine mounting
Details
       

 03-15-2014
1.50
redo cylinder 2/oilcooler baffles-1
Details

 03-15-2014
1.50
Drain the engine preservative fluid
Details
     

 03-11-2014
1.50
redcube positioning and fuel pump venting
Details
       

 03-10-2014
3.50
Finish Front baffle fit to upper inlet duct and mi
Details
       

 03-09-2014
3.50
Upper cowl inlet ducts-1
Details
       

 03-08-2014
7.00
baffles trim to upper cowl-3 and some rework items
Details
       

 03-08-2014
0.00
additional pics
       

 03-07-2014
5.00
Trimming baffles to top cowl-2
Details
       

 03-07-2014
0.00
baffle trim to top cowl-2 additional pics
Details
       

 03-06-2014
5.00
cutting baffles to fit upper cowl-1
Details
       

 03-01-2014
4.50
Cut in ignition wire holes to rear baffles. More r
Details
       

 02-26-2014
1.00
Ramp stiffner and front baffle clip rivitting
Details
     

 02-25-2014
5.50
Front baffle bend adjust and bracket drilling and
Details
       

 02-24-2014
4.50
baffle ramp brackets and angles and fitting cont.
Details
       

 02-23-2014
5.00
front baffle fit and support bkt and clip fab
Details
       

 02-22-2014
1.00
Parking brake rebuild and reinstall
Details
       

 02-22-2014
2.50
Inlet ramps 2 and fwd baffles-2
Details
       

 02-21-2014
5.00
Inlet ramps trim and bend etc
Details
       

 02-20-2014
4.00
Baffles and ramps
Details
       

 02-16-2014
1.00
Parking brake issue continues
Details

 02-16-2014
1.00
Cowl misc and contour molding
Details

 02-16-2014
0.50
baffle support bracket
Details

 02-15-2014
3.00
Fix parking brake problem
Details

 01-29-2014
4.00
Finish installing all hinges to cowling
Details
       

 01-26-2014
4.00
More top cowl fit adjustments and epoxy bottom cow
Details
       

 01-25-2014
5.00
Rivit on the upper cowl top hinges and lots of fit
Details
       

 01-24-2014
0.75
Upper cowl firewall hinge epxoxied to the cowl
Details
       

 01-23-2014
1.50
right upper cowl hinge installed
Details
       

 01-22-2014
1.00
left upper cowl hinge 2
Details
       

 01-20-2014
4.00
Upper cowl hrozontal paint relief cuts and hinge w
Details
       

 01-19-2014
2.50
Drill the right upper cowl hinge. Nose nut plates
Details
       

 01-18-2014
2.00
Left side upper cowl hinge drilled
Details
     

 01-18-2014
2.00
Drain and redo master brake cylinder fittings
Details
     

 01-14-2014
2.50
Fire seal firewall flanges and rivit on cowl hinge
Details
       

 01-13-2014
4.00
Bottom Cowl horizontal piano hinge fitting and mis
Details
       

 01-12-2014
4.50
Drill firewall hinges to lower cowl and made horiz
Details
       

 01-11-2014
4.00
Bottom cowl hinges and firewall side hinges
Details
       

 01-10-2014
2.50
Upper cowl redrill hinge and shims
Details
       

 01-10-2014
2.50
Bottomr cowl bottom aft cuts for fit
Details
       

 01-04-2014
4.50
Upper cowl re-fit-1
Details
     

 12-31-2013
1.50
upper cowling fitting with shims
Details
       

 12-31-2013
1.00
Bottom cowl basic fitting
Details
       

 12-30-2013
2.00
Upper cowl-4 the sim strip
Details
       

 12-30-2013
1.50
Lower cowl bottom hinges left and right sides
Details
       

 12-29-2013
2.75
Upper cowl fitting and drilling to upper fwd hinge
Details
       

 12-28-2013
2.50
Upper cowl trim process-day two
Details
       

 12-27-2013
3.00
first trim cut to upper cowling
Details
       

 12-26-2013
0.25
Power up panel and basic check-2
Details
     

 12-26-2013
1.50
Drill fwd baggage door hinge
Details
       

 12-26-2013
0.75
brake line air bubble removal attempt 2
Details
       

 12-15-2013
1.50
Shunt wires and battery bus wire fab
Details
       

 12-15-2013
1.00
Heat shield for wires exiting firewall rt side
Details
       

 12-14-2013
1.00
Fwd upper skin side support brackets
Details
       

 12-14-2013
1.00
fill and bleed brake system
Details
       

 12-13-2013
2.00
adjust fit of fwd upper skin and firewall hinge
Details

 12-03-2013
3.00
Cowl firewall hinge 2
Details
       

 12-03-2013
1.50
baffle 5
Details

 12-02-2013
1.00
Drill upper cowl piano hinge to firewall
Details
       

 12-01-2013
1.25
Shunt wire to buss terminal and to master relay
Details
       

 12-01-2013
1.00
cowl fitting 2
Details
       

 12-01-2013
2.50
baffle-5
Details
       

 11-30-2013
3.00
cowl fitting 1-oil access door
Details
       

 11-30-2013
1.00
baffle 4
Details
     

 11-24-2013
0.50
prep the crush plate and forward spinner plate
Details
     

 11-24-2013
2.00
Baffle-3
Details
       

 11-23-2013
0.50
p=lead jumper resistor adjustment
Details
     

 11-23-2013
0.75
brake leak fix
Details

 11-23-2013
2.00
Baffle-2. The oil cooler bracket
Details
       

 11-19-2013
2.00
Fuel hoses and fittings
Details
       

 11-19-2013
1.00
Fabricate engine dryer for the new lycoming
Details
     

 11-18-2013
2.50
Torque and cotter pin engine and mount. Starter re
Details
       

 11-18-2013
1.50
Baffle kit started
Details
       

 11-15-2013
1.00
Prep engine with fittings before installing engine
Details
       

 11-15-2013
5.00
Install engine
Details
       

 11-14-2013
1.50
Puncture hole in rear crankshaft plug
Details
       

 11-11-2013
1.50
Engine removed from box
Details
       

 11-11-2013
1.00
adjust cabin heat cable length and access door scr
Details
       

 11-10-2013
1.00
Starter relay bracket fabrication and fitting
Details
       

 11-10-2013
1.25
Installed the Filter airbox flap control cable
Details
       

 11-09-2013
1.50
RPM pig tail into mag P-leads
Details
       

 11-09-2013
1.00
Cabin heat box control final
Details
       

 11-05-2013
2.00
Cabin heat cable install-1
Details
       

 11-04-2013
2.00
Tighten all the brake line fittings
Details
       

 11-04-2013
1.25
New fuel line from electric pump to gascolator
Details
     

 11-03-2013
2.00
Re position pitot tube penetration and misc.
Details
       

 11-03-2013
3.00
Fabricate brake lines down gear legs
Details
       

 11-02-2013
1.00
Shunt and manifold pressure sensor mounted
Details
       

 11-02-2013
1.50
Install gascolator
Details
       

 11-02-2013
1.00
Control cable grommets and heat shields drilled
Details
       

 11-01-2013
1.00
Transducer manifold spacer fabrication
Details
       

 11-01-2013
2.50
Steel FW pass throughs for wire
Details
       

 11-01-2013
0.75
Plastic brake line to master cylinder fitting redo
Details
     

 10-31-2013
2.50
Drilling and attaching fire sleeve pass thrus for
Details
       

 10-30-2013
4.50
Wheels and brakes installed
Details
       

 10-30-2013
0.25
N882RV on her on 3 feet for the first time
Details
       

 10-28-2013
1.50
hobbs psi switch document
Details
       

 10-28-2013
1.00
brake fittings and wheel bracket nuts
Details
       

 10-23-2013
4.00
Mount axles, check alignment,mount tires,Pant brac
Details
       

 10-22-2013
6.00
Torque left landing gear bolts
Details
       

 10-22-2013
0.75
prep for axle attachment
Details
     

 10-21-2013
6.00
Torque the right landing gear harsdware
Details
       

 10-19-2013
0.00
vans harware vs optional harware
Details
       

 10-19-2013
1.50
Raise the fuse and start the gear attachment proce
Details
       

 10-19-2013
1.50
Final rivits in the center bulkhead caps
Details
     

 10-18-2013
0.50
Wire the fuel level senders to the EMS
Details
       

 10-18-2013
0.50
prep for lifting fuselage for gear leg clearence
Details
       

 10-18-2013
0.00
new landing gear hardware
Details
       

 10-18-2013
1.00
Install variable potentiometer for EMS audio warni
Details
       

 10-13-2013
0.75
Rivit fwd baggage door hinge brace and engine moun
Details
     

 10-13-2013
2.50
Adel clamps and wire bundling
Details
       

 10-12-2013
3.00
EMS wiring continued
Details
       

 10-09-2013
2.50
Sort EMS wires for FWF from Panel sides
Details
       

 10-09-2013
0.50
Run required engine sensor wires forward
Details
       

 10-08-2013
1.50
Thermocoupler wiring routing forward
Details
       

 10-08-2013
1.00
Shop cleaning, sorting electrical supplies, organi
Details

 10-08-2013
1.50
rivit center bulk head covers-1 and prep gear atta
Details
       

 10-08-2013
0.50
File interfearing rivit down on left outboard wear
Details
       

 10-07-2013
1.50
Stall warner final wireing
Details
       

 10-07-2013
0.75
Continuity check and label of EMS wires
Details
     

 10-07-2013
1.50
Center bulk head covers
Details
       

 10-07-2013
1.50
Bundle wires and make radio tray bracket
Details
       

 10-03-2013
1.00
Install stallwarner cutoff switch and molex connec
Details
       

 10-03-2013
1.00
Fuel selector position plate installed
Details
       

 10-03-2013
1.00
Engine arrival and unpacking
Details
       

 09-30-2013
1.00
Wire the second dimmer pot and label. Fix a mis wi
Details
     

 09-30-2013
2.00
tru trak auto pilot master switch install and wire
Details
       

 09-30-2013
0.50
Primer tail wheel fork
Details
     

 09-30-2013
0.75
GT50 final wire and second dimmer post installed a
Details
       

 09-30-2013
1.00
Basic test of panel wiring
Details
     

 09-29-2013
4.50
Wire the GPS 696, Install dimmer #2, Finish ground
Details
       

 09-28-2013
6.00
Finish wiring intercom and wire lighting to instru
Details
       

 09-26-2013
3.00
wired the thre warning lights and most of the dimm
Details
       

 09-26-2013
0.50
propellar and spacer kit arrived today
Details
       

 09-25-2013
3.50
wire up power to radio and xpdr via cb and misc wi
Details
       

 09-25-2013
0.50
Front airvent reducer installed
Details
     

 09-24-2013
0.50
Finished wireing the intercom
Details
       

 09-24-2013
3.00
Final wiring of the trim system
Details
       

 09-23-2013
0.75
lord mounts loosely placed
Details
     

 09-23-2013
0.50
install fittings on the pressure manifold
Details
       

 09-23-2013
1.50
coax cble final install
Details
       

 09-22-2013
0.75
pressure manifold drilled for install
Details
       

 09-22-2013
1.25
install hobbs,elt,and air vent in panel
Details
       

 09-22-2013
1.50
install and wire a battery hot buss
Details
       

 09-20-2013
1.00
final pitot static tube runs and attacment
Details
       

 09-19-2013
2.00
Final rivits in aft baggage floor. Rivit in floors
Details
       

 09-19-2013
1.50
Adjust and reinstall flap actuator weldment
Details
       

 09-15-2013
1.00
Install hot battery fuse block
Details
       

 09-10-2013
1.00
starter and master relay diodes install loosely
Details
       

 09-10-2013
1.00
rivit the panel skirts to fuselage
Details

 09-10-2013
0.50
Rivit the aft baggage floor-1
Details
     

 09-10-2013
1.00
Plumb the pitot and static system-1
Details
       

 09-10-2013
0.50
Map light and external music jack final wiring
Details
       

 09-10-2013
0.75
ACS ignition wired
Details
       

 09-09-2013
2.00
Rivit on final stiffners to floors and install in
Details
       

 09-09-2013
1.00
installing the flightcom intercom and acs starter
Details
       

 09-09-2013
2.00
baggage floor and flap actuator reinstall
Details
       

 09-08-2013
2.00
USB port install
Details
       

 09-08-2013
1.00
Rudder tip epoxy and sanding and misc
Details

 09-08-2013
0.50
Final stick grip wire connections at terminal bloc
Details
       

 09-08-2013
0.25
canopy latch stem hole filled
Details
     

 09-07-2013
0.50
Plan for switch location and CB amp requirement re
Details
       

 09-07-2013
2.00
installing instruments into panel and prep for wir
Details
       

 09-05-2013
4.00
Tie wire bundles and wire runs and transponder wir
Details
       

 08-27-2013
1.00
test radio and transponder for power up
Details
       

 08-27-2013
0.50
Rivtited the right side flap fairing
Details
       

 08-27-2013
1.00
map lights and stereo input wires cut for dsub pin
Details
       

 08-27-2013
1.00
Install 4 circuit breakers
Details
       

 08-23-2013
0.50
Stall warner circuit board install
Details
     

 08-23-2013
0.75
Redo two rivits in front canopy bow and spacer
Details
     

 08-22-2013
1.50
Prep and rivit the canopy front bow
Details
       

 08-22-2013
2.25
misc fuselage work
Details
       

 08-22-2013
2.00
Install the left and right flap fairing up stops.
Details
     

 08-22-2013
0.50
Attach wire harness to back of radio and transpond
Details
       

 08-19-2013
2.00
Rivit canopy and canopy skirt to frame
Details
       

 08-19-2013
1.00
Clean inside belly of fuselage
Details

 08-18-2013
3.75
Skirts final prep before riviting on permantly
Details
       

 08-18-2013
2.25
canopy removal and prep to receive skirts
Details
       

 08-17-2013
1.50
Sand and epoxy rudder bottom and top caps again
Details
       

 08-17-2013
2.50
Sand and epoxy aft end skirt to fit better before
Details
       

 08-15-2013
0.25
Test USB function
Details
     

 08-15-2013
0.25
rudder tip super fill
Details

 08-15-2013
1.00
Platenut install to tail cone for the empenage fai
Details
     

 08-15-2013
1.00
Liquid shim added to canopy upper lip inside and r
Details
     

 08-15-2013
1.25
Canopy handle and latch lever trim
Details
       

 08-12-2013
1.00
Rudder sanding
Details

 08-12-2013
1.50
Drill Canoopy frame rollers and install canopy sto
Details
       

 08-12-2013
0.00
canopy stop drilling
Details
       

 08-12-2013
0.50
Aft skirt sanding
Details

 08-11-2013
0.25
Rudder cap epoxy continued
Details
       

 08-11-2013
0.75
Mid position canopy stop
Details
       

 08-11-2013
0.75
D Sub pin to trim indicator wires and misc wire wo
Details
       

 08-11-2013
2.00
Canopy skirt Pull knob installed
Details
       

 08-10-2013
4.00
Skirt aft end sanded and pull knob fitted
Details
       

 08-10-2013
1.50
Dimmer heat sink-2 and encoder mounted
Details
       

 08-09-2013
0.25
The epoxy on and sand off for rudder continues
Details
       

 08-09-2013
0.75
Inside skirt joining-2 and pull ring back plate pl
Details
       

 08-09-2013
1.00
Fuel sender wire and OAT probe wires run
Details
       

 08-09-2013
1.25
Cockpit dimmer potentiometer install x2
Details
       

 08-09-2013
0.25
changed pitot aluminum to plastic transition in wi
Details
       

 08-08-2013
1.25
Rudder sanding continues
Details
       

 08-08-2013
0.75
glass inside canopy skirt aft
Details
       

 08-08-2013
2.50
Fairing platenuts installed on VS an HS
Details
       

 08-07-2013
1.00
Drill HS top side for 10 platenuts for emp fairing
Details
       

 08-06-2013
0.50
sanded the skirt halves joint and more epoxy appli
Details
       

 08-06-2013
1.00
Rudder top and bottom cap sanded and filled cont.
Details
       

 08-06-2013
3.00
Drilling empenage fairings attachment holes and th
Details
       

 08-04-2013
2.00
Trim emp fairing to fit and drill bottom fairing f
Details
       

 08-04-2013
0.75
Ruder cap sanding
Details

 08-04-2013
0.50
Canopy skirt joining-2
Details

 08-03-2013
0.50
Rudder bottom cap seem glassed
Details
       

 08-03-2013
0.25
Re install the wigwag set up to lower console
Details
     

 08-03-2013
1.50
Join left and right canopy skirts together
Details
     

 08-03-2013
0.75
Initial placement of VS to HS fiberglas fairing
Details
       

 08-03-2013
0.25
File fwd bottom edge to clear tail cone better
Details

 08-03-2013
1.00
Empenage fairing drilled and clecoed
Details
       

 07-30-2013
1.50
Sand and filler primer inside canopy skirts-final?
Details
       

 07-30-2013
0.50
Rudder light wiring shield ground done
Details
     

 07-30-2013
0.50
Rudder bottom tip rivited on
Details
     

 07-30-2013
0.75
final sanding of empenage tips-?
Details
     

 07-28-2013
0.50
left skirt sanding interior side again
Details
     

 07-27-2013
0.75
sanding interior left skirt
Details
       

 07-26-2013
0.75
sanding some pin holes and more sanding primer add
Details
       

 07-24-2013
1.00
sand and more filler
Details
       

 07-24-2013
1.00
Light sanding of empenage tips
Details

 07-24-2013
2.00
engine mount install
Details
       

 07-23-2013
0.50
spray on sandable primer filler to canopy skirts i
Details

 07-23-2013
0.25
rudder tip build epoxy build up-3
Details

 07-23-2013
1.00
Resistors added to wig wag flasher
Details
       

 07-23-2013
2.25
Fiberglass tips sanding prep and primer
Details
       

 07-21-2013
2.25
sand and reapply micro etc
Details
       

 07-21-2013
0.75
rudder tip build up-2
Details
       

 07-21-2013
2.00
more sanding of interior and the fillets
Details
       

 07-20-2013
1.50
Sanding interior skirts and more micro and super f
Details

 07-20-2013
2.25
Fiberglass tips continues
Details
       

 07-17-2013
2.00
Engine mount install
Details
       

 07-15-2013
1.00
skirt down tube fillets sanded and featherd
Details
       

 07-15-2013
2.50
sanding cont and reapply micro and super fill tria
Details
       

 07-14-2013
1.50
Skirt down tube fillets-2
Details
       

 07-14-2013
2.00
apply micro to VS and rudder final sides.
Details
     

 07-13-2013
2.00
Fiberglass tip work continues
Details
       

 07-13-2013
2.00
down tube gap fillets started
Details
       

 07-12-2013
3.75
More tip glassing and micro layers
Details
       

 07-12-2013
1.50
Micro to skirt underside lips again
Details
       

 07-11-2013
1.50
skirt seal redo both sides
Details
       

 07-11-2013
1.50
Reglass the top seams of elevators and HS tips
Details
       

 07-03-2013
1.00
horizontal tip seams glassed-1
Details
       

 07-03-2013
3.00
Filling skirt gaps-almost there
Details
       

 07-02-2013
2.00
Tail light mounting ring final instal and ground w
Details
       

 07-02-2013
2.50
rt skirt gap filling rounds 2 and 3
Details
       

 07-02-2013
0.50
conectorize the shieded 3 conductor tail light wir
Details
     

 07-01-2013
1.00
Tail light mount-3
Details
       

 07-01-2013
0.50
Rudder bottom cap-3
Details
     

 07-01-2013
1.00
Left canopy skirt form fit-1
Details
       

 07-01-2013
2.00
HS and Elevator tip gaps improved
Details
       

 06-30-2013
2.00
Tail light and strobe wire harness
Details
       

 06-29-2013
2.50
Rudder bottom cap-2
Details
       

 06-23-2013
1.00
Wig wag final wiring
Details
       

 06-23-2013
1.50
First cuts to rudder bottom cap for fit-1
Details
       

 06-22-2013
3.00
WigWag wiring-1
Details
       

 06-22-2013
0.00
PIC SET 2 FOR 6-22-13
       

 06-18-2013
2.00
Reinstall front stick grip and wire
Details
       

 06-14-2013
0.50
wrap wire bundles under left and right lowere cons
Details
       

 06-14-2013
1.00
firewall battery ground and misc
Details
       

 06-12-2013
0.25
wires thru baggage area to firewall secured
Details
       

 06-12-2013
1.00
Drill wire thru holes in floor and temp install fl
Details
       

 06-12-2013
0.50
connect wires to master and starter relays
Details
       

 06-08-2013
0.50
bundled wire in baggage area
Details
     

 06-07-2013
0.75
starter wiring routed fwd thru firewall
Details
       

 06-04-2013
1.25
front stick grip repair attempt 1
Details
       

 06-04-2013
1.00
eyball light final install and pilot stick grip re
Details
       

 06-03-2013
1.50
Left side pilot eyball light wiring and misc
Details
     

 06-02-2013
5.00
Final stick grip, relays, trim wiring
Details
       

 06-02-2013
0.00
2nd pic set of 6/2/13
       

 06-01-2013
3.50
More wiring on the sticks and relay
Details
       

 05-31-2013
1.00
Flap switch wiring-final
Details
       

 05-31-2013
2.00
Aileron/elevator trim servo wiring
Details
       

 05-26-2013
3.00
Trim servo, relays, stick wire testing and plannin
Details
       

 05-25-2013
3.00
replace strobe/position wires with shielded wire c
Details
       

 05-21-2013
0.00
pic set b 5/21/13
       

 05-21-2013
2.00
Flap switch wiring 1 and removing some wire from v
Details
       

 05-19-2013
0.00
pic set two of work5/19
       

 05-19-2013
3.00
Conectorize rear 12v dc aux plug and run wire. Sta
Details
       

 05-17-2013
3.00
wire up the map lights
Details
       

 05-13-2013
2.25
solder headphone and mic jacks front and back
Details
       

 05-13-2013
0.00
Pic set 2 for headset jacks and misc
       

 05-06-2013
1.00
prep wires for soldering to headphone and mic jack
Details

 05-05-2013
1.50
Install the stereo input jack, run the wire
Details
       

 05-05-2013
0.25
Heat valve box final instal
Details
     

 04-21-2013
2.00
routing the intercom wire harness, lableing and mi
Details

 04-20-2013
2.25
Intercom wire harness prep and Pilot headphone jac
Details
       

 04-19-2013
0.75
terminal block final install and grounding studs t
Details
       

 04-19-2013
1.50
Attach wires to the switch breakers in console
Details
     

 04-07-2013
2.00
install main wire harness into position
Details
       

 04-06-2013
2.25
Fab CB buss bar and wire routing prep plus misc
Details
       

 04-05-2013
2.00
Switch install in to console
Details
       

 04-05-2013
1.25
Fabricate the fuse block and drill to fwd brace
Details
       

 03-31-2013
2.00
Thread seal to master cylinders and misc work
Details
     

 03-30-2013
1.50
Rivit battery tray to firewall
Details
       

 03-12-2013
1.25
redo left side baggage tie down ring storage
       

 03-12-2013
1.75
position and drill rear audio/microphone jacks
       

 03-11-2013
1.50
wire up the roll and ptch autopilot servos with st
       

 03-11-2013
0.50
Finished wire connector at rear stick. Installed c
Details
       

 03-11-2013
0.75
connectorize the flap motor
     

 03-09-2013
1.50
finish installing leftside cabin light and switch-
       

 03-07-2013
1.50
Left side cockpit light -1
       

 03-07-2013
1.50
Elevator trim wire and rear stick wire connection
       

 02-11-2013
2.50
complete molex connect on pitch trim and started r
Details
       

 02-10-2013
3.00
Trim tab servo wire connection-2
Details
       

 02-09-2013
0.75
D-sub pins to the elevator trim tab servo-1
Details
       

 02-09-2013
1.00
battery shelf/mount 6
Details
       

 02-09-2013
0.25
attach the flanged duct to the fuselage
Details
     

 12-18-2012
0.25
Tg-10 two
Details
       

 12-18-2012
0.25
battery mount-5
Details
       

 12-11-2012
0.50
TG-10 position delima-1
Details
     

 12-11-2012
2.00
Battery mount-4
Details
       

 12-10-2012
0.50
Fresh air duct mod-1-rear seat
Details
     

 12-10-2012
2.00
battery tray-3
Details
       

 12-08-2012
1.75
Battery tray -2
Details
       

 11-30-2012
1.00
battery hold down fabrication-1
Details
       

 11-04-2012
1.50
rear map light switch/ inventory of FW fwd kit con
Details
       

 11-04-2012
1.25
Front maplight switch install
Details
       

 11-04-2012
1.25

Details
       

 11-03-2012
2.00
Mount front and back map lights
Details
       

 11-02-2012
0.50
Assembled the tail wheel to fork aand swivel rod
Details
       

 10-17-2012
0.75
12 v aux pwr for back seat install
Details
       

 10-10-2012
2.00
test template for map lights
Details
       

 10-03-2012
0.25
Firewall fwd kit arrived
Details
     

 09-29-2012
0.75
ACS ignition switch back plate fab -2
Details
       

 09-27-2012
1.00
Installed screws and nuts in the Gear tower weldme
Details
       

 09-27-2012
1.00
Added hardware to parking brake stiffiner and adju
Details
       

 09-27-2012
1.00
Acs ignition switch back plate-1
Details
       

 09-25-2012
2.50
Paint and misc. on panel, fab a brace for P brake
Details
       

 09-24-2012
2.25
panel radio tray bracket rear support -2
Details
       

 09-23-2012
1.00
machine screws to right side gear tower area
Details
       

 09-23-2012
1.50
Fab brackets to secure back of xpr tray to airfram
Details
       

 09-22-2012
1.75
P brake line redo 2 left side, Springs added to br
Details
       

 09-22-2012
0.75
Machine screws fastened and torqued above landing
Details
       

 09-21-2012
3.00
P brake hold lever 3 and rt brake line redo
Details
       

 09-17-2012
1.50
Park brake position lock bracket 2
Details
       

 09-16-2012
1.50
Parking brake lever lock bracket 1
Details
       

 09-16-2012
1.50
Control stick grips
Details
       

 09-10-2012
0.00
pilot control stick length cut and fit and wire ex
Details
       

 09-10-2012
2.25
front contol stick grip and throttle plate assembl
Details
       

 09-07-2012
2.75
Radio tray mounting brackets rivited
Details