Date
  | 
	Hours
  | 
	Work Log Summary 
		 
  | 
	Details 
		 
  | 
	
		
	
	 10-03-2016
  | 
	4.50
  | 
	Finishing the Flaps
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-02-2016
  | 
	4.50
  | 
	Atart assembly of Flap parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-01-2016
  | 
	2.50
  | 
	All Flap internal parts Alodined
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-30-2016
  | 
	5.00
  | 
	Flaps attachment rib bracket
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-20-2016
  | 
	4.50
  | 
	Test fit all parts for both Flaps
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-19-2016
  | 
	4.50
  | 
	Finished riveting Ailerons
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-18-2016
  | 
	6.00
  | 
	Ailerons continued
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-18-2016
  | 
	6.00
  | 
	Aileron counterweight installation
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-17-2016
  | 
	6.50
  | 
	Preassembly of Aileron parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-16-2016
  | 
	7.50
  | 
	Prefit all aileron parts/ preped for primer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-11-2016
  | 
	4.00
  | 
	preparing the ailerons
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-05-2016
  | 
	8.00
  | 
	Decided to install the Pitot tube mounting bracket
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-01-2016
  | 
	4.00
  | 
	Riveted both the Aileron an Flap braces on the rea
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-31-2016
  | 
	5.00
  | 
	Deburred and primed the aileron and flap braces
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-31-2016
  | 
	6.50
  | 
	Aileron hinge bracket installation both wings
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-30-2016
  | 
	3.00
  | 
	Temporarily installed, match drilled, deburred Hin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-30-2016
  | 
	7.00
  | 
	Removed right wing from wing stand onto work bench
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-29-2016
  | 
	4.00
  | 
	riveted the top skins on the Left wing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-27-2016
  | 
	5.50
  | 
	Finished Riveting  the Right wing top skins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-26-2016
  | 
	3.50
  | 
	Start of riveting the top skins on Right wing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-25-2016
  | 
	6.50
  | 
	Leak test Left tank, Install access panels an nutp
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-24-2016
  | 
	1.50
  | 
	2nd attempt to leak test tanks
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-23-2016
  | 
	2.00
  | 
	First attempt to leak test Right wing tank
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-22-2016
  | 
	12.00
  | 
	Process of sealing the Left wing tank, ( duplicate
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-22-2016
  | 
	8.00
  | 
	Final assembly of left wing tank
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-21-2016
  | 
	6.00
  | 
	Final installation of right tank parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-21-2016
  | 
	8.00
  | 
	Closing up right wing tank with baffle
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-20-2016
  | 
	8.00
  | 
	Cont' build on right wing tank
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-19-2016
  | 
	6.00
  | 
	Started the rib installation on right fuel tank
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-18-2016
  | 
	6.00
  | 
	Start of wing tank sealant
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-18-2016
  | 
	4.00
  | 
	Installing stiffners with sealant right fuel tank
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-17-2016
  | 
	7.00
  | 
	Riveting leading edge ribs to main spar/ row of ri
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-16-2016
  | 
	6.00
  | 
	Finished riveting Right wing leading edge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-15-2016
  | 
	8.00
  | 
	Final assembly of the left wing leading edge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-14-2016
  | 
	4.00
  | 
	Dimpling the skins and clecoing in place on wing f
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-14-2016
  | 
	4.00
  | 
	Dimpled the top skins for the Left wing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-13-2016
  | 
	9.00
  | 
	Preparing the top and bottom skins for Wash Coat p
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-11-2016
  | 
	6.00
  | 
	Temporarily assembled both leading edges.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-11-2016
  | 
	6.00
  | 
	Riveted the Right wing ribs to main spar an rear s
  | 
	
			Details 
		 | 
	
	 		  
				 
		       | 
 
	
  | 
	
	
	 08-07-2016
  | 
	5.00
  | 
	Start of Wing assembly of ribs and rear spar to ma
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-06-2016
  | 
	5.50
  | 
	Start of wash coat primer on wing parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-06-2016
  | 
	4.00
  | 
	Final steps of Wash Coat primer on wing parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-30-2016
  | 
	6.50
  | 
	Finished the access opening on the left wing/ adde
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-26-2016
  | 
	6.00
  | 
	Final prep of wing ribs before primer
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-24-2016
  | 
	5.50
  | 
	Prep for primer wing ribs and rear spar
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-23-2016
  | 
	6.00
  | 
	Finished pre assembly of fuel tanks
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-23-2016
  | 
	8.00
  | 
	Final prep of both wing tanks
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-22-2016
  | 
	4.50
  | 
	Dimpled for fuel caps, test fit flop tube in tank 
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-22-2016
  | 
	6.50
  | 
	bent and prefit vent tube for left wing tank, alon
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-21-2016
  | 
	2.00
  | 
	Test fit the usher tank cap right wing tank, drill
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-21-2016
  | 
	7.50
  | 
	Fly cut rear baffle for left tank, dibpled skin, p
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-21-2016
  | 
	1.50
  | 
	Drilled the attachment angle Left wing tank for fl
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-20-2016
  | 
	6.50
  | 
	Attaching the attachment ring to right wing tank r
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-19-2016
  | 
	7.50
  | 
	Making attachment angles and checking for vent tub
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-19-2016
  | 
	4.50
  | 
	Fly cutting access for Right wing tank sender and 
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-17-2016
  | 
	8.00
  | 
	Made the tank splice plates for both tanks an asse
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-15-2016
  | 
	8.50
  | 
	First assembly of Right wing tank stiffners and ri
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-11-2016
  | 
	4.00
  | 
	Same procedure as Left leading edge on Right wing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-10-2016
  | 
	6.50
  | 
	Temporarily installed left leading edge to match d
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-10-2016
  | 
	4.50
  | 
	Preparing the left wing leading edge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-10-2016
  | 
	4.50
  | 
	Made jig for the leading edge and tank constructio
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-09-2016
  | 
	8.50
  | 
	Clecoed the top and bottom wing skins on the wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-08-2016
  | 
	3.50
  | 
	Setting up Wing jig with spars and ribs checking f
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-06-2016
  | 
	4.00
  | 
	Drilled angle for wing jigs, attached and placed l
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-04-2016
  | 
	3.00
  | 
	Preassembled wing spars and ribs left wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-03-2016
  | 
	3.50
  | 
	Seperated, straightened  all wing ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-03-2016
  | 
	2.50
  | 
	Finish right rear wing spar parts and scotch brite
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-02-2016
  | 
	3.50
  | 
	Getting wing rear spar parts together
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-02-2016
  | 
	3.50
  | 
	Finish the deburing and prefit of rear wing spar c
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-01-2016
  | 
	6.50
  | 
	Fabricated Tie down attachment brackets and spacer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-30-2016
  | 
	1.50
  | 
	Final installation of main wing spar nutplates
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-29-2016
  | 
	5.50
  | 
	Installation of nutplates on main wing spar
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-27-2016
  | 
	3.00
  | 
	Drilled, deburred, countersink #8 screw holes
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-25-2016
  | 
	3.00
  | 
	Made wing spar support blocks for work table
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-24-2016
  | 
	3.50
  | 
	Installed 4x4 posts floor to ceiling for wing buil
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-22-2015
  | 
	3.00
  | 
	Checked off pic ticked of wing kit
  | 
	
			Details 
		 | 
	
			      
		         |