KitLog pro

Powered By Kitlog Pro v2.0

DOUGs Web Site
Work Logs Found: 112
Category Work Time: 172 Hours
 Date
Hours
Work Log Summary

Details

 11-02-2018
1.00
Installed new missing parts
Details
       

 10-26-2018
0.50
Added rivets to wing tip light mounting plates
Details
       

 10-02-2018
1.00
2 - fitting wing tips to wings
Details
       

 10-02-2018
1.00
1 - fitting wing tips and drilling holes
Details
       

 10-01-2018
1.00
3 - fabricated and installed wing tip expansion br
Details
       

 10-01-2018
0.50
2 - fitting wing tips to wing
Details
       

 10-01-2018
1.00
1 - Installing Port position light
Details
       

 09-30-2018
1.00
2 - Installed right tip light
Details
       

 09-30-2018
1.00
1 - installing wing tip lights
Details
       

 09-27-2018
1.50
3 - riveted tip ribs to wings
Details
       

 09-27-2018
1.00
2 - tip rib fitment
Details
       

 09-27-2018
1.50
1 - Installing wing tips
Details
       

 09-23-2018
0.30
3 - Pitot and AOA pressure test
Details
     

 09-23-2018
0.70
2 - Aileron and Flap fitment
Details
       

 09-23-2018
1.00
1 - Attempted reforming of tip rib
Details
       

 09-22-2018
1.00
3 - primed tip rib brackets and test fit ribs
Details
       

 09-22-2018
0.50
2 - Fit tip rib skins
Details
       

 09-22-2018
0.50
1 - Installed remaining spar rivets
Details
       

 09-21-2018
0.80
2 - Loaded wings onto wing dolly
Details
       

 09-19-2018
2.50
Installed left fuel tank to wing
Details
       

 09-18-2018
0.50
Leak tested left fuel tank after repair
Details
     

 09-18-2018
2.50
Installed right fuel tank to wing
Details
       

 09-17-2018
1.00
Leak testing of fuel tanks
Details
       

 09-15-2018
0.50
Leak test prep
Details
       

 09-15-2018
1.50
Installed fuel level senders to tanks
Details
       

 09-14-2018
2.00
2 - Removed right tank and cleaned excess sealant
Details
       

 09-14-2018
1.50
1 - Cleaned off excess sealant from left fuel tank
Details
       

 09-13-2018
1.00
Removed fuel tank from left wing
Details
       

 09-10-2018
3.00
2 - closed right fuel tank with sealant
Details
       

 09-10-2018
2.00
1 - Cleaned inside of right fuel tank
Details
       

 09-09-2018
3.50
2 - Completed Left Fuel Tank Assembly
Details
       

 09-09-2018
1.50
1 Finished cleaning inside of Left fuel tank
Details
       

 09-08-2018
2.00
Cleaned up inside of fuel tanks
Details
       

 09-04-2018
2.50
Touch up sealing inside of fuel tanks
Details
       

 08-29-2018
0.50
Set fuel level sender floats
Details
       

 08-28-2018
6.00
Started left fuel tank assembly
Details
       

 08-27-2018
5.50
Start assembly & sealing of right fuel tank
Details
       

 08-26-2018
2.00
Prepared fuel tanks for assembly
Details
     

 08-24-2018
2.00
2 - Fitment of L & R fuel tanks to wings
Details
       

 08-24-2018
2.00
1 - fitment of fuel return fittings and clamp
Details
       

 08-23-2018
2.00
3 - More parts prep for fuel tank assembly
Details
       

 08-23-2018
1.00
2 - Fuel tank supply line fitment
Details
       

 08-23-2018
1.00
1 - Fabricated and fit right fuel tank vent line
Details
       

 08-22-2018
1.00
5 - Fuel breather tube fabrication: left fuel tank
Details
       

 08-22-2018
1.00
4 - Fuel filler neck preparation
Details
       

 08-22-2018
1.00
3 - Installed nut plates to tank brackets
Details
       

 08-22-2018
1.00
2 - installed ground lug to sender mounting plate
Details
       

 08-22-2018
0.50
1 - Flattend fuel tank outer rib flanges
Details

 08-21-2018
0.50
Fuel tank assembly
Details
       

 08-19-2018
1.50
Complete riveting left wing
Details
       

 08-18-2018
1.50
5 - Completed riveting of top skins for left wing
Details
       

 08-18-2018
2.00
4 - Riveting top skins of left wing
Details
       

 08-18-2018
1.00
3 - Aileron push rod fitment
Details
       

 08-18-2018
1.00
2 - Installed top skins to left wing with clecos
Details
 

 08-18-2018
1.00
1 - Completed Pitot tube installation
Details
       

 08-17-2018
1.50
Pitot fittings installation
Details
       

 08-15-2018
1.00
Installed landing light wing connectors
Details
       

 08-14-2018
0.50
3 - Installed connectors on landing lamps
Details
       

 08-14-2018
1.00
2 - Clecod tip top and leading edge skins of left
Details
       

 08-14-2018
1.00
1 - Added rib rivets & riveted landing light assy
Details
       

 08-12-2018
1.00
4 - primed top skins for left wing
Details
       

 08-12-2018
1.00
3 - Landing and strobe light routing
Details
       

 08-12-2018
0.50
2 - Pitot system tubing
Details
       

 08-12-2018
1.00
1 - Pitot Tube installation
Details
       

 08-11-2018
0.50
Began tubing and wire installation in left wing
Details
       

 08-10-2018
0.50
3 Flipped wing over and fit pitot tube
Details
       

 08-10-2018
1.00
2 Installed M4 rivnuts for left wing inspection pa
Details
       

 08-10-2018
2.00
1 Riveted bottom skins of left wing
Details
       

 08-09-2018
1.00
Started Riveting the left lower wing skins
Details
       

 08-09-2018
1.50
Started left wing bottom skin assembly
Details
       

 08-08-2018
0.50
Left wing bottom side work
Details
       

 08-08-2018
1.00
Fit top skins to left wing
Details
       

 08-07-2018
2.00
3-Riveted left wing ribs
       

 08-07-2018
1.50
2-Completed step bends & started riveting
Details
       

 08-07-2018
1.50
1-Formed step on bottom rib brackets
Details
       

 08-06-2018
1.00
Started Left Wing assembly
Details
       

 08-05-2018
2.00
Primed left wing ribs
Details
       

 08-02-2018
0.50
Replaced fuel sender o-rings
Details
     

 07-30-2018
1.50
Assembled re-configured fuel level senders
Details
       

 07-29-2018
1.00
Right wing tank test fit
Details
       

 07-29-2018
1.50
Left wing tank test fit
Details
       

 07-28-2018
1.00
Cut templates for fuel tank fixtures
Details
       

 07-27-2018
1.00
Cut and formed fuel level float arms
Details
     

 07-26-2018
1.00
Assembled landing and taxi lights
Details
       

 07-25-2018
0.50
Prepared for left wing light assembly
Details
     

 07-25-2018
1.50
Completed right wing skin assembly
Details
       

 07-24-2018
5.00
Riveted the top right wing skins
Details
       

 07-23-2018
3.00
Right wing top side assembly
Details
       

 07-23-2018
3.00
Assembled top skins to right wing
Details
       

 07-22-2018
0.50
Installed wing strobe / position lights wiring
Details
       

 07-22-2018
1.00
Installed M4 rivnuts for inspection panels
Details
       

 07-21-2018
3.00
Riveted right wing bottom skins
Details
       

 07-20-2018
4.00
Installed bottom skins to right wing assembly
Details
       

 07-19-2018
3.00
Riveted right wing ribs and spars
Details
       

 07-18-2018
1.50
3 - Right Wing Assembly
Details
       

 07-18-2018
1.50
2 - Right Wing Assembly
Details
       

 07-18-2018
2.50
1 - Right Wing Assembly
Details
       

 07-17-2018
0.50
X1 - Wing twist jig setup
Details
       

 07-17-2018
0.50
Riveted wing twist jigs together
Details
       

 07-17-2018
3.00
Assembled rear spars with clecos
Details
       

 07-16-2018
1.00
Assembled wing ribs 009 L&R
Details
       

 07-16-2018
2.00
Assembled wing ribs 008 L&R
Details
       

 07-16-2018
2.00
Assembled wing rib 006 L&R
Details
       

 07-13-2018
2.50
Assembled wing rib 004
Details
       

 07-13-2018
1.50
Assembled wing rib 001
Details
       

 07-12-2018
1.50
riveted left wing flap
Details
       

 07-12-2018
3.00
Assembled right wing flap
Details
       

 07-11-2018
1.00
Scotch bright and primed flap ribs
Details
       

 07-10-2018
1.00
Prep'd parts for flap assembly
Details
     

 07-09-2018
3.00
Completed Ailerons
Details
       

 07-08-2018
2.50
Started Aileron build
Details
       

 07-07-2018
6.00
Unpacking and inventory of wing & finish kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.