Work Logs Found:
1088
Category Work Time:
3732 Hours
Date
Hours
Work Log Summary
Details
01-21-2021
2.00
Red Cube part 1
Details
01-20-2021
2.00
Exhaust Part 3
Details
01-15-2021
2.00
Exhaust part 2
Details
01-14-2021
2.50
Exhaust Part 1
Details
01-13-2021
2.00
Baffles part 5
Details
01-11-2021
3.00
Alternator
Details
01-10-2021
4.00
Throttle cable bracket part 2
Details
01-09-2021
3.00
Throttle cable bracket part 1
Details
01-07-2021
4.00
Replacement mixture cable
Details
01-06-2021
2.00
Starter cable part 2
Details
01-05-2021
0.80
Starter part 1
Details
01-04-2021
2.00
Baffles part 4
Details
01-03-2021
6.00
Baffles part 3
Details
01-02-2021
4.00
Oil cooler baffle reinforcement
Details
12-31-2020
1.50
Engine hookups part 8
Details
12-29-2020
6.00
Baffles part 2
Details
12-28-2020
15.00
Baffles part 1
Details
12-26-2020
0.50
Engine hookups part 7
Details
12-24-2020
2.00
Engine hookups part 6
Details
12-23-2020
4.00
Engine hookups part 5
Details
12-22-2020
6.00
Engine hookups part 4
Details
12-21-2020
4.00
Engine hookups part 3
Details
12-20-2020
4.00
Engine hookups part 2
Details
12-19-2020
2.00
Engine hookups
Details
12-17-2020
2.50
Governor linkage continued
Details
12-16-2020
4.00
Governor linkage adjustment
Details
12-15-2020
4.00
Manifold pressure line
Details
12-13-2020
4.00
Hung Engine
Details
11-23-2020
1.50
Wheel pants part 11
Details
11-22-2020
2.00
Wheel pants part 10
Details
11-21-2020
2.00
Wheel fairings part 9
Details
11-20-2020
1.50
Wheel fairings part 8
Details
11-19-2020
1.00
Governor installation
Details
11-18-2020
1.00
Wheel alignment adjustment again
Details
11-15-2020
2.00
Wheel fairings part 7
Details
11-14-2020
1.00
Wheel fairings part 6
Details
11-13-2020
6.00
Wheel fairings part 5
Details
11-12-2020
2.50
Wheel fairings part 4
Details
11-11-2020
4.00
Wheel fairings part 3
Details
11-09-2020
1.00
Wheel fairings part 2
Details
11-08-2020
2.50
Wheel Fairings part 1
Details
11-07-2020
3.00
More wheel alignment
Details
11-06-2020
1.50
Wheel alignment correction
Details
11-05-2020
1.00
Sealed top edge of firewall
Details
11-04-2020
3.00
Engine Prep Part 3
Details
11-01-2020
2.00
Engine prep part 2
Details
10-31-2020
3.00
Engine prep part 1
Details
10-30-2020
3.00
Fuselage Roll Out
Details
10-29-2020
2.00
Wheels, brakes and tires
Details
10-28-2020
2.00
Landing gear toe-in check
Details
10-26-2020
4.00
Landing gear fit up
Details
10-24-2020
2.50
Landing Gear Legs back on
Details
10-23-2020
4.00
Windscreen unveiling
Details
10-20-2020
2.00
Prep for landing gear installation
Details
10-19-2020
1.00
Priming windscreen fairing
Details
10-18-2020
3.00
Final sanding of the windscreen fairing
Details
10-17-2020
2.00
Sanding the micro on the windscreen
Details
10-16-2020
6.00
Windscreen final shaping
Details
10-15-2020
2.00
Filling gaps under empennage fairing
Details
10-14-2020
4.00
Empenage fairing continued
Details
10-13-2020
4.00
Empenage fairing mod part 2
Details
10-12-2020
6.00
Empennage fairing mod
Details
10-10-2020
4.00
More windscreen fairing work
Details
10-09-2020
1.00
Windscreen fairing part ??
Details
10-08-2020
1.50
More windscreen fairing shaping
Details
10-07-2020
1.00
Windscreen fairing shaping
Details
09-21-2020
2.00
Laying up fiberglass patches on windscreen fairing
Details
09-19-2020
0.00
Propellor arrives
Details
09-18-2020
3.00
Windscreen trimming and sanding
Details
09-17-2020
2.00
More canopy fiberglass work
Details
09-16-2020
2.00
Fiberglass work on windscreen fairing and empenage
Details
09-15-2020
4.00
Trimming and sanding the windscreen upper fairing
Details
09-14-2020
3.00
Empennage tip work
Details
09-13-2020
2.50
Opening canopy after windscreen fairing cure
Details
09-12-2020
8.00
Windscreen/canopy fairing
Details
09-11-2020
5.00
RH HS tip closeout
Details
09-10-2020
4.00
LH HS closeout
Details
09-09-2020
5.00
Empenage fairing and wing tip work
Details
09-08-2020
2.00
SL-00014
Details
09-06-2020
3.00
More canopy work
Details
09-05-2020
2.00
More work on the forward end of the canopy
Details
09-04-2020
8.00
Canopy final riveting and wheels/tires
Details
09-02-2020
4.00
Fwd baggage door hinge support closeout angle
Details
09-01-2020
3.00
Glareshield edge trim
Details
08-31-2020
4.00
Reinstalled avionics and cut hole for drink holder
Details
08-30-2020
4.00
Baggage door tweeking
Details
08-29-2020
5.00
Baggage door complete
Details
08-28-2020
4.00
Baggage door skin riveting
Details
08-27-2020
5.00
Baggage door support
Details
08-27-2020
3.00
Baggage door lock arm
Details
08-26-2020
4.00
Skirt priming and some other stuff
Details
08-25-2020
2.00
More skirt sanding
Details
08-24-2020
3.00
More skirt sanding
Details
08-23-2020
2.00
Canopy skirt flox sanding
Details
08-21-2020
6.50
Riveting canopy
Details
08-19-2020
2.00
Still more sanding of windscreen lower fairing
Details
08-18-2020
1.50
More sanding of the windscreen lower fairing
Details
08-17-2020
2.50
Windshield fairing lower fairing sanding
Details
08-16-2020
3.00
Laying up wind screen forward bottom fairing
Details
08-14-2020
0.00
Pilot's stick grip label
Details
08-13-2020
2.00
Windscreen fillet part 2
Details
08-12-2020
4.00
Windscreen fillet
Details
08-11-2020
3.00
Prep for windscreen fairing layup
Details
08-10-2020
1.00
Completed riveting forward top skin
Details
08-09-2020
6.00
Wind screen fairing part 2
Details
08-08-2020
6.00
Windscreen screws
Details
08-07-2020
8.00
Baggage door
Details
08-06-2020
4.00
More forward top skin work
Details
08-05-2020
4.00
Riveting forward top skin
Details
08-04-2020
3.50
Passenger warnings and landing gear bolts
Details
08-03-2020
5.00
Misc tasks
Details
08-02-2020
4.50
Replacement fuel lines
Details
08-01-2020
4.00
Misc work
Details
07-31-2020
5.00
Landing gear brackets etc
Details
07-30-2020
6.00
Landing gear bolt retainer clips
Details
07-29-2020
4.00
More work on canopy skirt
Details
07-28-2020
3.00
Canopy skirt aft tunnel
Details
07-27-2020
3.00
Canopy skirt and wing tips some more
Details
07-26-2020
5.00
Canopy skirt aft section work etc
Details
07-25-2020
4.50
Canopy skirt - shortening the aft edge
Details
07-24-2020
5.00
Wing tip and canopy skirt work etc
Details
07-22-2020
5.00
Throttle quadrant
Details
07-21-2020
3.00
Engine linkages at throttle quadrant
Details
07-20-2020
2.00
Wing tips continuuuuuuuuued
Details
07-19-2020
3.00
Wing tip work and back to the canopy
Details
07-18-2020
3.00
More wing tip and landing gear work
Details
07-17-2020
2.00
Wing tips and landing gear
Details
07-16-2020
1.50
Primered landing gear and misc rudder pedal work
Details
07-15-2020
2.00
Landing gear legs - prep for primer
Details
07-14-2020
2.50
Amps shunt to ANR fuse holder jumper wire
Details
07-13-2020
5.00
Pressure sensor wiring hookup
Details
07-12-2020
4.00
Alternate air cable and SV amps hookup
Details
07-11-2020
3.00
Cabin heat cabin installation
Details
07-10-2020
4.00
Cabin heat and alternate air bracket paint and lab
Details
07-09-2020
4.00
Heater cable
Details
07-08-2020
4.00
More cable bracket work
Details
07-06-2020
2.00
Control cables
Details
07-04-2020
2.20
Another firewall passthrough
Details
07-03-2020
4.00
Wing tips and control cable FW passthroughs
Details
07-01-2020
4.00
Wing tip lenses try number 3
Details
06-29-2020
1.50
More wing tip work
Details
06-28-2020
4.50
IFD-440 GPS antenna coax
Details
06-26-2020
5.50
Engine mount
Details
06-24-2020
4.00
GPS antenna bracket part 2
Details
06-23-2020
6.50
Firewall equipment
Details
06-22-2020
2.00
Wing tip sanding
Details
06-21-2020
1.00
Firewall forward kit
Details
06-19-2020
6.00
Bracket for ANL fuse and ammeter shunt
Details
06-18-2020
4.00
Misc wiring tasks
Details
06-17-2020
3.00
Starter contactor and Tach wiring
Details
06-16-2020
2.50
Main power wire hook up to starter contactor
Details
06-10-2020
6.00
Primary power wiring
Details
06-07-2020
2.50
More firewall wiring
Details
06-06-2020
5.50
Firewall groundblock wiring and moved wings
Details
06-05-2020
8.00
Forward section wiring
Details
06-04-2020
5.50
Wire routing for FWF wires to firewall
Details
06-03-2020
3.00
Wingtips part 23 and some electrical work
Details
06-02-2020
3.00
Wingtips part 22
Details
06-01-2020
1.50
Wingtips part 21
Details
05-31-2020
5.00
Wingtips part 20 and started the firewall forward
Details
05-30-2020
1.50
Wing tips part 19
Details
05-28-2020
5.00
Wingtips part 18
Details
05-26-2020
0.00
Engine arrives
Details
05-25-2020
3.00
Wingtips part 17 and canopy shims
Details
05-24-2020
3.50
Wing tips part 16 and canopy work
Details
05-23-2020
7.00
Wing tips part 15
Details
05-22-2020
6.00
Wing tips part 14
Details
05-20-2020
4.00
Wing tips part 13 and some canopy work
Details
05-19-2020
3.70
Wing tips part 12 and back to the canopy
Details
05-17-2020
5.00
Landing/Taxi Lights part 2
Details
05-16-2020
6.00
Landing/Taxi Lights
Details
05-15-2020
1.50
Wing Tips part 11
Details
05-14-2020
1.00
Wing tips part 10
Details
05-13-2020
2.30
Wing tips part 9
Details
05-12-2020
1.00
Wing tips part 8
Details
05-10-2020
5.00
Wing tips part 7 and canopy latch
Details
05-09-2020
8.00
Wing tips part 6
Details
05-08-2020
6.00
Wing tips part 5 and misc tasks
Details
05-08-2020
0.00
Hangar!
Details
05-07-2020
4.50
Roll Servo Part 4
Details
05-06-2020
3.00
Roll servo part 3 and sanding wing tip micro
Details
05-05-2020
4.00
Roll servo part 2 and filling wing tip gaps
Details
05-04-2020
2.00
Roll servo part 1
Details
05-04-2020
1.00
Filling wing tip gaps
Details
05-03-2020
5.00
RH wing tip hinges and VOR antenna
Details
05-02-2020
2.00
Riveting hinges on LH wing tip
Details
05-01-2020
9.00
More wing tip work
Details
04-30-2020
3.00
Wing tip lenses Part 4
Details
04-28-2020
2.00
Wing tip lenses part 3
Details
04-27-2020
2.00
Wing tip lenses part 2
Details
04-26-2020
4.00
Wing tip lens
Details
11-04-2019
2.00
Completed wiring for Skyview GPS antenna
Details
10-28-2019
3.00
Sky view GPS wiring
Details
10-20-2019
2.50
GPS antenna mounting and wire routing
Details
10-19-2019
5.00
Indicator light wiring and some more canopy skirt
Details
10-14-2019
8.00
Canopy rail mod and panel clearcoat
Details
10-13-2019
4.00
Canopy Skirt Part 21
Details
10-12-2019
6.00
Canopy skirt part 20
Details
10-11-2019
4.00
Canopy skirt part 19
Details
09-28-2019
4.00
Canopy forward edge reinforcement strip
Details
09-21-2019
4.00
More canopy work
Details
09-14-2019
8.00
Canopy latch
Details
09-13-2019
4.00
Elevator counterweight closeouts
Details
09-07-2019
6.00
Empennage tips part 8
Details
09-06-2019
6.00
Empennage tips part 7
Details
09-05-2019
1.00
Empennage tips part 6
Details
09-04-2019
2.00
Empennage tips part 5
Details
09-02-2019
2.00
Empennage tips part 4
Details
08-31-2019
8.00
Empennage tips part 3
Details
08-30-2019
7.00
Empennage tips part 2
Details
08-29-2019
1.00
Canopy skirt part 18
Details
08-28-2019
1.50
Canopy skirt part 17
Details
08-25-2019
5.00
Empennage Tips part one
Details
08-24-2019
6.00
Canopy skirt part 16 and Rudder fiberglass
Details
08-21-2019
2.00
Canopy skirts part 15
Details
08-20-2019
2.50
Canopy skirts part 14
Details
08-18-2019
8.00
Canopy skirts part 13 and rudder bottom
Details
08-17-2019
2.00
Canopy skirts part 12
Details
08-16-2019
7.00
Canopy skirts part 11
Details
08-14-2019
2.50
Canopy skirts part 10
Details
08-13-2019
2.00
Canopy skirts part 9
Details
08-11-2019
8.00
Canopy skirts part 8
Details
08-10-2019
8.00
Canopy skirts part 7
Details
08-04-2019
6.00
Canopy skirts part 6
Details
08-03-2019
8.00
Canopy skirts part 5
Details
08-02-2019
3.00
Canopy skirts part 4
Details
08-01-2019
1.80
Canopy skirts part 3
Details
07-31-2019
1.30
Canopy skirts part 2
Details
07-28-2019
8.00
Started canopy skirts
Details
07-27-2019
7.00
Canopy drilling and final trim
Details
07-26-2019
5.00
Canopy trimming part 8
Details
07-20-2019
6.00
Canopy Bubble Trimming Part 7 - The Big Cut - MEH
Details
07-15-2019
2.00
Canopy Bubble Trimming Part 6
Details
07-14-2019
4.00
Canopy Bubble Trimming Part 5
Details
07-13-2019
6.00
Canopy bubble trimming part 4
Details
07-10-2019
1.50
Canopy bubble trimming part 3
Details
07-03-2019
3.00
Canopy bubble trimming part 2
Details
06-30-2019
5.50
Canopy bubble trimming part 1
Details
06-28-2019
3.50
More panel label work
Details
06-22-2019
4.00
Trial canopy trimming
Details
06-20-2019
2.00
Canopy rear stop
Details
06-18-2019
0.00
Engine is done!
Details
06-14-2019
4.00
More panel lables
Details
06-13-2019
1.00
N Number panel lable
Details
06-12-2019
2.50
Lower switch panel labels
Details
06-10-2019
2.50
Panel labels and rear baggage floor paint
Details
06-08-2019
3.50
Canopy frame part 6
Details
06-07-2019
4.00
Canopy frame part 5
Details
06-02-2019
2.50
Forward baggage floor paint and retainer clips for
Details
05-29-2019
1.50
Canopy frame part 4
Details
05-28-2019
2.00
Canopy frame part 3
Details
05-27-2019
5.00
Canopy frame part 2
Details
05-26-2019
5.00
Canopy frame part 1
Details
05-25-2019
3.00
Canopy slide rail part 3
Details
05-24-2019
5.00
Canopy slide rails part 2
Details
05-22-2019
2.00
Canopy slide rail
Details
05-17-2019
8.00
Finish Kit Arrives!
Details
05-15-2019
2.50
Seat heat wire, harness clamps and floor paint
Details
05-13-2019
1.00
Click studs for avionics bay wire harness support
Details
05-12-2019
4.00
More interior painting and ram mount base installa
Details
05-11-2019
6.00
Voltage regulator and interior painting
Details
05-05-2019
3.50
Volatge regulator wiring
Details
05-04-2019
1.50
Rear baggage compartment components
Details
05-03-2019
3.00
Painted misc parts
Details
05-01-2019
2.50
Misc work
Details
04-28-2019
6.00
Finished battery and ELT access door mods
Details
04-27-2019
4.50
ELT access door part 3
Details
04-24-2019
3.00
ELT access door part 2
Details
04-19-2019
1.50
ELT access hatch part 1
Details
04-15-2019
2.50
Battery access door part 4
Details
04-14-2019
2.50
Battery access door part 3
Details
04-13-2019
6.00
Battery access door part 2
Details
04-10-2019
2.50
Battery access door part 1
Details
04-03-2019
0.00
Engine on order
Details
03-24-2019
2.50
Painted cabin floors
Details
03-23-2019
1.50
Painted the rear seat support
Details
03-22-2019
1.50
Painted the bulkhead caps
Details
03-20-2019
2.00
Lettering and clearcoat
Details
03-17-2019
4.00
Started baggage door
Details
03-16-2019
2.00
Upper forward skin substructure
Details
03-15-2019
4.00
Forward upper fuselage skin
Details
03-13-2019
2.50
Misc
Details
03-10-2019
6.00
Cut out for avionics cooling fan
Details
03-08-2019
8.00
CO Guardian
Details
03-06-2019
2.00
Primed panel and deburred aft cabin covers
Details
03-03-2019
8.00
Dimmer installation
Details
02-24-2019
8.00
Cockpit lighting
Details
02-23-2019
4.00
Finished console light brackets
Details
02-22-2019
2.00
Painted misc parts and fabricated a light bracket
Details
02-17-2019
5.00
Misc tasks
Details
02-16-2019
5.00
Panel indicator lights
Details
02-14-2019
2.00
Rear stick CPC - Stick side
Details
02-13-2019
3.00
Rear stick CPC connector - Airplane side
Details
02-12-2019
2.50
Bracket for rear stick CPC connector
Details
02-10-2019
6.00
Rear seat stick
Details
02-09-2019
6.00
Rear stick
Details
02-02-2019
6.00
Painted roll bar and hooked up the avioincs foan
Details
01-30-2019
2.50
Roll bar and avionics fan wiring
Details
01-29-2019
2.50
Eyeball light mounting blocks
Details
01-26-2019
6.00
Cabin heat and lighting
Details
01-23-2019
4.50
Panel indicator lights
Details
01-20-2019
5.00
CO Guardian troubleshooting
Details
01-19-2019
9.00
Misc avionics work
Details
01-16-2019
3.00
Skyview radio test and landing/taxi light test
Details
01-13-2019
1.50
Skyview Configuration
Details
01-12-2019
9.00
VP-X Pro first power up
Details
01-05-2019
6.00
Avionics bay ground block
Details
01-02-2019
2.50
Antenna diplexer
Details
01-01-2019
5.00
Completed wiring IFD440
Details
12-31-2018
4.00
Completed IFD440 connectors
Details
12-30-2018
4.50
More IFD440 wiring
Details
12-29-2018
4.00
IFD440 wiring continued
Details
12-28-2018
2.00
SEATS!
Details
12-15-2018
4.00
IFD440 Wiring
Details
12-12-2018
1.50
More wire clamps and ground block
Details
12-09-2018
2.50
Bench tested IFD-440
Details
12-08-2018
3.20
SV-EMS wiring
Details
12-05-2018
2.00
More VP-X wiring
Details
12-02-2018
4.00
CO Guardian wiring
Details
11-28-2018
2.00
Organized wiring
Details
10-24-2018
2.00
VP-X switches
Details
10-23-2018
1.50
Magneto P-leads
Details
10-17-2018
2.80
More switch wiring
Details
10-14-2018
2.50
Nutplate for switch wiring clamp
Details
10-13-2018
5.00
VP-X Pro wiring
Details
10-12-2018
2.50
Panel switchs
Details
10-11-2018
2.00
VP-X pro J1 connector
Details
10-09-2018
1.50
SV-AP-Panel D-sub backshell
Details
10-07-2018
2.50
Completed SV-COM-425 wiring
Details
10-06-2018
8.00
Finished audio panel wiring
Details
10-01-2018
1.00
Roll trim servo wiring
Details
09-29-2018
3.50
More audio panel wiring
Details
09-27-2018
2.00
GMA2454 to IFD440 wires
Details
09-26-2018
2.00
GMA245 to SV-425 wires
Details
09-24-2018
1.00
Audio panel power up
Details
09-23-2018
4.00
More audio panel wiring
Details
09-22-2018
8.00
Audio panel wiring
Details
09-12-2018
3.00
Audio panel hookups
Details
09-09-2018
2.00
ARNIC-429 harness
Details
09-08-2018
7.00
G5 wiring and other misc tasks
Details
09-05-2018
3.00
SV-EMS wiring
Details
09-03-2018
6.00
Stall warning board and Skyview backup battery
Details
09-02-2018
6.00
Skyview display wiring part 2
Details
09-01-2018
3.00
Skyview display wiring part 1
Details
08-29-2018
3.00
More VP-X Pro wiring
Details
08-26-2018
4.00
Mounting the ELT audio alerter
Details
08-22-2018
2.50
Coax cables for IFD-440
Details
08-19-2018
4.00
Finiished lower switch panel wiring and installed
Details
08-18-2018
3.00
Sub-panel painting and switch panel wiring
Details
08-17-2018
1.50
Sub-panel painting part 1
Details
08-15-2018
2.00
MIsc
Details
08-14-2018
1.50
Switch wires
Details
08-12-2018
2.50
SV harness continued
Details
08-11-2018
3.00
SV-ARINC429 shelf and network cables
Details
08-08-2018
2.50
SV-ARINC429 mounting shelf
Details
08-05-2018
6.00
IFD400 Mounting continued
Details
08-04-2018
8.00
IFD400 Mounting
Details
08-02-2018
1.50
Gear tower adel clamp supports continued
Details
07-29-2018
2.50
Brackets for adel clamps
Details
07-15-2018
3.00
Sub panel work
Details
07-08-2018
6.00
Skyview network wiring and audio panel trial fit
Details
07-07-2018
4.00
More wiring
Details
07-06-2018
2.00
Nav/Strobe Wiring hookup
Details
07-05-2018
7.00
Wiring
Details
07-01-2018
6.00
Sub panel work
Details
06-29-2018
1.50
Flap motor wires
Details
06-27-2018
3.00
More wiring
Details
06-24-2018
8.00
Avionics Shelves Part 5
Details
06-23-2018
2.50
Avionis shelves part 4
Details
06-20-2018
3.00
Avionics shelves part 3
Details
06-17-2018
3.00
Avionics shelves part 2
Details
06-16-2018
2.50
Avionics shelves
Details
06-10-2018
7.00
LH gear tower wiring and VP-X pro mounting
Details
06-09-2018
6.00
More RH gear tower wiring
Details
06-06-2018
1.50
Pilots stick grip forward harness
Details
06-05-2018
3.00
Pilots stick grip forward wire harness.
Details
05-28-2018
3.00
Roll servo CPC connector
Details
05-25-2018
7.00
VOR/LOC Coax, Comm 2 doubler riveting and click st
Details
05-22-2018
2.50
LH Com 1 antenna doubler riveting
Details
05-20-2018
3.00
AP disconnect wires and Com 2 coax
Details
05-19-2018
5.00
Underfloor wiring and ventilation
Details
05-10-2018
2.50
More underfloor wiring
Details
05-09-2018
2.50
Under floor wiring continued
Details
05-06-2018
4.00
More underfloor wiring
Details
04-22-2018
4.00
Underfloor wiring RH side
Details
04-21-2018
4.00
More mid cabin underfloor wiring
Details
04-18-2018
2.00
Bracket for LH wing CPC
Details
04-15-2018
2.00
LH com antenna doubler/stiffener
Details
04-14-2018
4.00
LH antenna doubler and harness bracket
Details
04-08-2018
4.00
Pitot-static line securing
Details
04-07-2018
6.00
Misc wire and tubing routing tasks
Details
04-05-2018
2.00
Pitot/static tube and wire guide
Details
04-04-2018
1.50
Rerouted Pitot and AOA lines and wire harness in L
Details
04-03-2018
2.50
Rear stick grip wire harness
Details
03-28-2018
2.50
Finished pilots' stick wiring and New Panel!!
Details
03-27-2018
2.00
Terminating stick grip wiring
Details
03-25-2018
6.00
Stick grip wiring
Details
03-24-2018
2.50
Panel cutting for ELT remote
Details
03-23-2018
4.00
Front seat vents
Details
03-18-2018
3.50
Wiring backup switches
Details
03-12-2018
1.70
LH replacement brakeline
Details
03-11-2018
4.00
Brakeline redo number three
Details
03-10-2018
4.50
Wiring
Details
03-07-2018
2.00
More wire routing
Details
03-04-2018
4.00
More wiring
Details
03-03-2018
3.00
Reprimed lower switch panel and installed power c
Details
02-24-2018
6.00
Misc work
Details
02-21-2018
2.00
Misc stuff
Details
02-19-2018
7.00
Headset jack wiring continued
Details
02-18-2018
2.50
Front headset jack holes
Details
02-14-2018
2.50
Mounting headset jacks
Details
02-11-2018
6.00
Headset jack wiring
Details
02-10-2018
1.50
Headset jacks continued
Details
02-03-2018
5.00
Replacement pilot's stick etc
Details
01-31-2018
2.00
Headset jacks
Details
01-28-2018
5.00
Pilot's USB charge port
Details
01-27-2018
5.00
Seat mockup and lower switch console
Details
01-24-2018
2.50
Front stick grip mounting
Details
01-17-2018
2.00
More stick grip work
Details
01-13-2018
4.00
Stick and stick grip
Details
01-07-2018
4.00
Misc work
Details
01-06-2018
6.00
Aileron trim
Details
01-04-2018
2.00
Power cable routing
Details
01-03-2018
1.50
Completed tailcone riveting
Details
12-30-2017
4.00
Finished installing equipment in aft avionics bay
Details
12-29-2017
7.00
Re-populating aft fuselage avionics bay
Details
12-28-2017
7.00
Riveting aft upper tailcone skin
Details
12-17-2017
3.50
Temporary aft fuselage floors
Details
12-13-2017
3.00
Removable floor mod part 8
Details
12-10-2017
7.00
Removable floor mod part 7
Details
12-09-2017
7.00
Removable floor mod part 6
Details
12-08-2017
3.00
Removable floor mod part 5
Details
12-06-2017
3.00
Removable floor mod part 4
Details
12-05-2017
2.50
Removable floor mod part 3
Details
12-03-2017
6.00
Removable floor mod part 2
Details
12-02-2017
8.00
Started removable floor mod
Details
11-22-2017
3.00
Com antenna mounting holes
Details
11-21-2017
5.50
Flap motor wire routing and comm antenna doublers
Details
10-25-2017
1.00
Riveted power cable bracket to mid fuselage brace
Details
10-18-2017
3.00
Main power cable support continued
Details
10-15-2017
4.50
Main power cable support
Details
10-07-2017
6.00
More main power cable routing
Details
10-04-2017
2.50
Battery cables continued
Details
09-29-2017
1.50
Battery cables
Details
09-24-2017
3.00
Main battery ground lug
Details
09-23-2017
4.50
More main power cable installation
Details
09-21-2017
1.50
Main power cable
Details
09-20-2017
2.50
Terminals for large gauge wire
Details
09-19-2017
1.00
Throttle quadrant support disassembly
Details
09-13-2017
2.00
ELT antenna cable
Details
09-04-2017
3.50
Aft upper skin priming and E-Buss feed wire fab
Details
09-03-2017
4.00
Flap sensor and motor connectors
Details
09-02-2017
3.50
Nutplates for wire run support
Details
08-29-2017
2.00
Master contactor and flap sensor wiring
Details
08-23-2017
2.50
Master contactor mounting plate
Details
08-20-2017
6.00
E-bus wire harness continued
Details
08-19-2017
6.00
E-bus wiring
Details
08-18-2017
6.00
ELT antenna bracket and E-Bus wiring
Details
08-16-2017
2.50
One piece ELT antenna bracket
Details
08-13-2017
8.00
Misc avionics tasks
Details
08-12-2017
8.00
Completed E-bus fuse block holder and routed wires
Details
08-09-2017
3.00
ELT wire harness
Details
08-07-2017
2.50
Continued fabrication of E-bus fuse block for alte
Details
08-02-2017
3.00
Alternate mount for E-Bus fuse holder
Details
07-28-2017
6.00
E-bus fuse block mount
Details
07-26-2017
3.00
Pitot-Static-AOA line routing
Details
07-23-2017
4.00
Outside air temperature probe wires
Details
07-22-2017
3.50
More aft avionics bay wire routing
Details
07-20-2017
3.00
Securing Aft avionics bay wiring
Details
07-19-2017
1.80
Adel Clamps
Details
07-12-2017
3.00
Pitot-Static-AOA line routing
Details
07-09-2017
4.00
Pitot-static lines
Details
07-08-2017
8.00
Antenna cables and securing wires
Details
07-04-2017
3.00
ADS-B antennas and aft fuselage wire routing redo
Details
07-03-2017
4.50
Aft fuselage wiring Part 3
Details
07-02-2017
4.00
Wire routing from aft fusealge
Details
07-01-2017
4.00
Wire routing from aft fusealge
Details
06-30-2017
1.00
Riveted antenna doublers and step cover
Details
06-28-2017
2.50
OAT sensors and wiring
Details
06-25-2017
3.00
Completed aft SV hub and ADS-B RX mount
Details
06-24-2017
2.80
Aft SV hub and ADS-B mount part 5
Details
06-21-2017
2.00
Skyview hub and ADS-B RX mount continued
Details
06-19-2017
2.50
Aft SV hub and ADS-B RX mount
Details
06-18-2017
3.00
Continued fabricating the mount aft equipment moun
Details
06-17-2017
6.00
Started a mount for the aft skyview hub and ADS-B
Details
06-14-2017
2.50
ADS-B antenna doubler and step cutout cover
Details
06-13-2017
1.00
ADS-B antenna doubler
Details
06-11-2017
5.00
Static line supports and transponder antenna
Details
06-07-2017
3.00
Tailcone wiring rerouting
Details
06-06-2017
2.00
Tailcone wire routing
Details
05-31-2017
3.00
Tailcone wiring
Details
05-30-2017
1.50
Autopilot wire harness connectors
Details
05-29-2017
4.50
Misc tasks
Details
05-25-2017
2.00
Completed ADAHRS shelf
Details
05-24-2017
2.50
Flap actuator cover nutplates and ADAHRS shelf deb
Details
05-21-2017
6.00
ADAHRS Shelf
Details
05-20-2017
4.00
Static line and AP servo
Details
05-17-2017
3.00
Static lines
Details
05-10-2017
2.00
More flap actuator cover work
Details
05-09-2017
3.00
Flap motor assembly cover
Details
05-07-2017
6.00
Completed flap sensor bracket
Details
05-07-2017
0.00
Additional pictures from 5/6/17
Details
05-06-2017
7.50
Battery tray, static port and rudder exit cover in
Details
04-30-2017
3.50
Completed battery/equipment tray
Details
04-29-2017
6.00
More work on the battery/equipment tray
Details
04-26-2017
3.00
Battery/equipment tray continued
Details
04-23-2017
7.00
Static ports and battery tray
Details
04-20-2017
2.00
Rudder cable exit fairings and flap position senso
Details
04-19-2017
2.00
Rudder cable exit fairings
Details
04-12-2017
2.00
Riveted 807 upper bulkhead and gussets to fuselage
Details
04-01-2017
3.00
Forward skin attach ribs and aft upper bulkhead ri
Details
03-26-2017
4.00
Forward top skin work
Details
03-22-2017
2.50
Instrument subpanel riveting
Details
03-21-2017
1.00
Deburred instrument panel mounting flange
Details
03-19-2017
3.00
Instrument panel prep
Details
03-18-2017
8.00
LG tower screws, fwd baggage riveting, and started
Details
03-15-2017
2.00
Windscreen support
Details
03-11-2017
7.00
More upper tailcone prep work.
Details
03-08-2017
2.50
Upper aft skin drilling
Details
03-05-2017
8.00
Upper aft fuselage skin
Details
03-04-2017
2.00
Rudder stop riveting
Details
03-03-2017
1.50
Installed rudder pedal assemblies
Details
03-01-2017
2.50
Completed rudder peddal assembly
Details
02-26-2017
8.00
Rudder pedal assembly
Details
02-25-2017
8.00
Finished flap actuator and started the rudder peda
Details
02-22-2017
3.50
Rudder cable
Details
02-19-2017
4.50
Rudder stops
Details
02-18-2017
4.00
Forward elevator control stop and rudder
Details
02-17-2017
2.50
Trimmed aft elevator stop
Details
02-16-2017
2.00
Elevator stops
Details
02-15-2017
2.50
Elevator linkage adjustment
Details
02-13-2017
2.80
More control work
Details
02-12-2017
5.00
Control column adjustment
Details
02-11-2017
6.00
Began mounting control rods in fuselage
Details
02-10-2017
2.00
Rear stick dtilling
Details
02-09-2017
2.00
Control rods continued
Details
02-08-2017
2.50
Control rods
Details
02-04-2017
5.00
Completed drilling elevator horns. Continued fabri
Details
02-01-2017
3.00
Elevator bushings and horn drilling
Details
01-29-2017
6.00
Completed installing VS and installed elevators
Details
01-28-2017
6.00
Drilled mounting holes for vertical stabilizer
Details
01-27-2017
2.50
Vertical stabillizer alignment part one
Details
01-25-2017
3.00
HS attachment final drilling
Details
01-23-2017
1.50
HS mounting part 2
Details
01-21-2017
5.00
Landing gear covers and started mounting horizonta
Details
01-18-2017
2.00
Finished riveting forward forward bottom skins
Details
01-15-2017
2.00
Started riveting forward forward bottom skins
Details
01-14-2017
6.00
Completed aft forward bottom skin
Details
01-13-2017
2.00
Started riveting aft forward bottom skin
Details
01-11-2017
2.50
Lower brake lines
Details
01-08-2017
5.00
Forward bottom skins ready for riveting
Details
01-07-2017
4.00
More forward bottom skin work
Details
01-04-2017
2.50
Forward bottom skins
Details
12-31-2016
7.00
Drilled mounting holes for landing gear.
Details
12-30-2016
8.00
Landing gear leg alignment
Details
12-29-2016
5.00
Started landing gear installation
Details
12-26-2016
1.00
Elevator push rod
Details
12-22-2016
4.00
Started tail flight control components
Details
12-18-2016
2.50
Seat ramp and throttlle quadrant mount
Details
12-17-2016
6.00
Seat ramp and throttle mount
Details
12-16-2016
2.00
Misc cockpit floor tasks
Details
12-13-2016
1.50
Switch console
Details
12-11-2016
3.00
Front seat ramp
Details
12-10-2016
5.50
Misc fuselage work
Details
12-08-2016
1.00
Nutplates
Details
12-07-2016
2.50
More floor panel riveting
Details
12-06-2016
0.00
Grove Landing Gear Arrived
Details
12-03-2016
4.50
Floor assembly riveting
Details
11-30-2016
2.50
Primed RH aft floor
Details
11-27-2016
3.00
More floor work
Details
11-26-2016
6.00
Additional floor panel prep
Details
11-25-2016
2.00
More floor panel prep
Details
11-21-2016
2.50
Some more floor work
Details
11-20-2016
6.00
More fuselage floor work
Details
11-16-2016
2.50
Cabin floor and flap bearing block drilling
Details
11-11-2016
8.00
Rear seat back and cockpit floor
Details
11-09-2016
1.70
Riveting rear seat back
Details
11-06-2016
6.00
More rear seat back prep work and installing front
Details
11-05-2016
4.50
Fuselage rotator and rear seat back deburring
Details
11-03-2016
1.00
Rear seat back
Details
11-01-2016
1.50
Riveted front seat back
Details
10-30-2016
4.00
Primed front seat back parts and painted seatback
Details
10-29-2016
8.00
Front seat back and painting seat back support
Details
10-28-2016
1.50
Seat back support plates
Details
10-27-2016
2.00
RH fuselage rail riveting and started on battery t
Details
10-26-2016
3.00
LH Fuselage rail
Details
10-25-2016
2.50
Rotisserie,servo bracket and some priming
Details
10-23-2016
3.00
Baggage rail bulkhead and rear seatbelt brackets
Details
10-22-2016
8.00
Completed skin riveting
Details
10-21-2016
1.50
Aft deck
Details
10-20-2016
1.50
Finished riveting RH aft side skin
Details
10-16-2016
2.00
Interior painting and continued riveting
Details
10-15-2016
6.00
RH aft skin riveting
Details
10-14-2016
2.50
Completed riveting LH aft side skin
Details
10-13-2016
1.50
More LH forward side skin riveting
Details
10-12-2016
3.00
LH aft side skin riveting
Details
10-11-2016
1.00
Fuselage riveting continued
Details
10-08-2016
4.00
More fuselage riveting
Details
10-07-2016
6.50
Still more fuselage riveting
Details
10-06-2016
1.50
More riveting
Details
10-05-2016
2.50
More skin riveting
Details
10-04-2016
2.00
Fuselage riveting
Details
10-02-2016
4.00
Ready for skin riveting
Details
10-01-2016
6.50
Tailcone assembly
Details
09-30-2016
1.50
Fuselage NACA vent
Details
09-29-2016
2.50
Prep for skin installation
Details
09-28-2016
3.20
New Brake lines
Details
09-25-2016
7.00
Parking brake valve brace
Details
09-23-2016
1.50
Parking brake valve mounting
Details
09-21-2016
3.00
Parking brake valve bracket
Details
09-17-2016
3.50
Installed LH side skin and drilled forward end of
Details
09-16-2016
12.00
Tail cone assembly & pitch servo bracket
Details
09-14-2016
2.00
Misc tasks
Details
09-11-2016
3.00
RH brake line
Details
09-10-2016
7.00
Finish fuel lines and started brake lines
Details
09-07-2016
3.00
RH fuel vent line
Details
09-06-2016
2.00
LH fuel vent line
Details
09-05-2016
4.00
More fuel lines
Details
09-04-2016
3.50
Fuel tubing
Details
09-03-2016
4.00
Fuel tubing
Details
08-17-2016
3.00
Aux fuel pump etc
Details
08-16-2016
2.50
Fuel fllter installation
Details
08-14-2016
8.00
Continued fuselage construction
Details
08-13-2016
8.00
Assembly
Details
08-10-2016
4.00
Finished prepping for final assy
Details
08-09-2016
1.50
Lower forward longeron riveting
Details
08-07-2016
3.00
Aft bottom skin & started fuselage final assembly
Details
08-06-2016
6.00
Upper longeron prep
Details
08-03-2016
1.50
Interior paint on forward section and fwd baggage
Details
07-31-2016
2.00
Fuselage bulkhead painting
Details
07-30-2016
2.50
Prep for fuselage interior paint
Details
07-29-2016
4.00
RH Aft side skin priming
Details
07-27-2016
3.00
LH aft side skin prep and priming lower longerons
Details
07-24-2016
7.00
Prep and painting side panels
Details
07-24-2016
6.00
Forward side skin prep
Details
07-16-2016
6.00
Misc prep tasks
Details
07-10-2016
4.00
More fuselage prep
Details
07-09-2016
4.00
Downdraft table improvements and painting interior
Details
07-07-2016
1.50
Scuffed, cleaned and primed armrests for RH skin
Details
07-06-2016
2.00
Painting arm rests and dimpling/priming bulkheads
Details
06-29-2016
3.00
Dimpling
Details
06-28-2016
2.00
Rear seat USB outlet location
Details
06-25-2016
6.00
Finished deburring and started priming and dimplin
Details
06-23-2016
3.00
Skin deburring
Details
06-22-2016
3.00
Upper longeron countersinking and misc deburring
Details
06-21-2016
1.50
Counterinking upper longerons