Powered By Kitlog Pro v2.0
N983LK
RV-8
All
8-21-2020
< Previous Log Entry
Next Log Entry >
Date:
8-21-2020
Number of Hours:
6.50
Manual Reference:
Brief Description:
Riveting canopy
Removed the canopy skirt and canopy bubble. Did final sanding on canopy edge
Replaced bubble on canopy frame.
Cut sections of model airplane fuel line to match the canopy thickness of each hole and glued the cut pieces in the holes with super glue.
Clecoed the canopy skirt back in place.
Installed the blind rivets common to the canopy skirt and bubble starting from the aft end and working forward.
Installed the blind rivets that secure the skirt to the rest of the frame.
Shaved down the heads of the rivets
Applied epoxy/flox over the heads of the rivets.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1335
4531
Avionics
109
428
Baffles
43
189
Canopy
70
276
Cowl
46
151
Electrical
77
285
Empennage
130
418
Engine
8
16
Finish Kit
1
8
Firewall Forward
63
199
Flight Testing
3
1
Fuselage
427
1522
Interior
12
25
Miscellaneous
15
9
None
1
Paint
5
Prep for flight
12
42
Prop
4
4
Shop Setup
4
Wings
305
958
Copyright © 2001-2024 Matronics. All Rights Reserved.