Brief Description: Stall horn switch bracket, RH wing tank zees, RH t
Started off the day by riveting the stall warning switch support to the LH leading edge skin and then installing the switch assembly temporarily to check the fit. I then removed it so it wouldn't be a hazard during the build. I'll probably install it just prior to installing the LH tank for the final time.
Next I rivet the nutplates to the six outboard RH tank attach zees and bolted the zees to the RH spar
Next I finished prepping the ribs for the RH tank which involved opening up the vent holes in the top of the center ribs to 1/2" diameter to allow for faster fueling, followed by straightening and fluting the flanges.
Finally I clecoed the RH tank together and placed the assembly on the spar. The fit with the leading edge looks good.