Installed the cylinder 1, 2, 3 and 4 side baffles on the engine. Marked areas where the baffles needed to be trimmed to clear the valve covers and gaskets. Removed the baffles, trimmed and deburred.
Match drilled the aft baffles to the rear center baffle support bracket. Instlled AN3 bolts and nuts.
Installed the remaining hardware for the side and aft baffles.