|
|
|
|
Graysons Web Site
Work
Logs
Found:
45
|
Category Work Time: 264 Hours
|
Date
|
Hours
|
Work Log Summary
|
Details
|
09-24-2018
|
6.00
|
Paper work
|
Details
|
|
|
09-19-2018
|
6.00
|
Compass Swing and Misc.
|
Details
|
|
|
09-18-2018
|
5.00
|
Weighing and misc.
|
Details
|
|
|
09-17-2018
|
6.00
|
Measure datums and Misc.
|
Details
|
|
|
09-14-2018
|
8.00
|
Last Rivet Installed!
|
Details
|
|
|
09-14-2018
|
1.00
|
Finished picturs
|
|
|
|
09-13-2018
|
8.00
|
Prime and paint fiberglass
|
Details
|
|
|
09-11-2018
|
9.00
|
Sanding
|
Details
|
|
|
09-10-2018
|
8.00
|
Filling fiberglass gaps
|
Details
|
|
|
09-03-2018
|
4.00
|
Wing Root Doublers
|
Details
|
|
|
08-29-2018
|
8.00
|
Cargo section fiinish and misc.
|
Details
|
|
|
08-21-2018
|
6.00
|
Aft cargo hat rack
|
Details
|
|
|
07-24-2018
|
6.00
|
Conopy shade
|
Details
|
|
|
07-15-2018
|
6.00
|
Trouble shoot ground runs.
|
Details
|
|
|
07-14-2018
|
8.00
|
Fininsh Landign lights and wing walk doubler.
|
Details
|
|
|
07-08-2018
|
2.00
|
wing reflectors cont.
|
Details
|
|
|
07-07-2018
|
3.00
|
Fitting landing light reflector
|
Details
|
|
|
06-29-2018
|
8.00
|
Control rigging and misc.
|
Details
|
|
|
06-28-2018
|
9.00
|
Wings Installed!
|
Details
|
|
|
06-12-2018
|
9.00
|
Baggage compartment
|
Details
|
|
|
06-11-2018
|
5.00
|
Finish fuel flow testing, some misc details.
|
Details
|
|
|
06-05-2018
|
3.00
|
Tested fuel flows
|
Details
|
|
|
06-04-2018
|
8.00
|
Finishing up interior
|
Details
|
|
|
06-01-2018
|
6.00
|
Interior
|
Details
|
|
|
05-29-2018
|
8.00
|
Finsh up tail reassemnbly
|
Details
|
|
|
05-28-2018
|
9.00
|
Elevator work
|
Details
|
|
|
05-22-2018
|
5.00
|
Remaking inboard elevator ribs
|
Details
|
|
|
05-21-2018
|
10.00
|
Fisish pitot install, investigate elevator travel
|
Details
|
|
|
05-18-2018
|
3.00
|
Tailwheel fix and Pitot tube mount plate
|
Details
|
|
|
05-17-2018
|
9.00
|
Bigger tires, pitot tube wiring, control travel.
|
Details
|
|
|
05-16-2018
|
8.00
|
Pitot Tube Retrofit
|
Details
|
|
|
05-11-2018
|
1.00
|
Pitot tube layout
|
Details
|
|
|
05-11-2018
|
8.00
|
Autopilot harness, wire cleanup
|
Details
|
|
|
05-10-2018
|
7.00
|
Static air system, A/P servo harness, some firewal
|
Details
|
|
|
05-07-2018
|
0.00
|
Thoughts on exterior finsih
|
Details
|
|
|
05-04-2018
|
4.00
|
ADS-B install, programing, and wing wiring.
|
Details
|
|
|
05-03-2018
|
8.00
|
GPS wrap up and skyview modules.
|
Details
|
|
|
05-01-2018
|
1.00
|
wired GPS harness
|
Details
|
|
|
04-26-2018
|
9.00
|
GPS rack install, wiring.
|
Details
|
|
|
04-25-2018
|
7.00
|
wiring, breakers, lighting, and GPS layout.
|
Details
|
|
|
04-20-2018
|
6.50
|
Panel reconfigure
|
Details
|
|
|
04-19-2018
|
3.00
|
Strarting work on the panel
|
Details
|
|
|
04-19-2018
|
3.00
|
Firewall Forward Clean-up
|
Details
|
|
|
04-15-2018
|
7.00
|
Inspecting and evaluating
|
Details
|
|
|
04-13-2018
|
0.00
|
Bringing the Project Home
|
Details
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |