KitLog pro

Powered By Kitlog Pro v2.0

Brian's RV-7 Web Site
Work Logs Found: 263
Category Work Time: 582 Hours
 Date
Hours
Work Log Summary

Details

 12-11-2010
1.20
engine run
Details
       

 12-09-2010
2.00
Breaking in the engine
Details
     

 12-06-2010
2.00
Finished and Flying
Details
     

 11-07-2010
2.00
heat shield, dataplate and cowl pins
Details
       

 11-03-2010
1.00
AIRWORTHY!!!!
Details
     

 11-02-2010
2.00
oil cooler cover, labels
Details

 10-27-2010
3.00
FAA inspection
Details

 10-26-2010
4.00
screws and more screws and interior
Details
       

 10-22-2010
1.00
antenna and tunnel area
Details

 10-20-2010
4.00
under the panel and TAXI test
Details
       

 10-19-2010
4.00
fuel senders
Details

 10-18-2010
1.00
radio, Dynon
Details

 10-17-2010
2.00
seat pans
Details

 10-16-2010
3.00
lights, sticks and action
Details
     

 10-15-2010
1.50
wiring
Details

 10-13-2010
4.00
weight and balace, wires
Details
       

 10-12-2010
7.00
fairings, seat belts, strobes......
Details
       

 10-11-2010
4.00
plenum and gear fairings
Details

 10-10-2010
4.00
firewall forward tidy up, cowl install
Details
       

 10-09-2010
5.00
Engine start
Details
       

 10-08-2010
3.00
calibrate fuel tanks, Dynon tuning
Details
       

 10-07-2010
2.00
flaps, wing tip
Details

 10-06-2010
5.00
fuel lines, wing tips, lights
Details
       

 10-05-2010
6.00
wings torqued, ailerons, oil cooler
Details
       

 10-04-2010
2.00
brakes and wing walk
Details
     

 10-03-2010
2.00
wiring and brakes
Details
       

 10-02-2010
2.00
plug wires
Details
     

 10-01-2010
4.00
baffles, plenum and other FF
Details
     

 09-30-2010
2.00
final baffle install
Details

 09-29-2010
7.00
Baffles, prop, stencils
Details
       

 09-28-2010
6.00
Exhaust installed then various clamps, plug wires,
Details
       

 09-27-2010
3.00
fuel flow and starter cable
Details
       

 09-26-2010
3.00
starter cable and fuel flow xdcr
Details

 09-25-2010
2.00
more stinking baffles
Details

 09-24-2010
2.00
baffles
Details

 09-23-2010
2.00
baffles
Details

 09-22-2010
4.00
oil cooler and plenum
Details
       

 09-19-2010
2.00
oil cooler and plenum
Details
       

 09-16-2010
1.00
wings on
Details
       

 09-15-2010
3.00
canopy, cowl and plenum
Details
       

 09-14-2010
3.00
tailcone closeout
Details
       

 09-12-2010
2.00
tailcone closeout
Details

 09-11-2010
2.00
more tail work
Details
       

 09-10-2010
2.00
elevator hook up
Details

 09-09-2010
3.00
rudder and elevator install
Details
       

 09-07-2010
4.00
final assembly starts today
Details
       

 09-03-2010
6.00
more paint and moving day
Details
       

 09-02-2010
1.00
more paint
Details
       

 09-02-2010
4.00
mellow yellow and crazy purple
Details
       

 09-01-2010
13.00
PAINT
Details
       

 08-27-2010
3.00
primed fuselage
Details
       

 08-26-2010
3.00
more paint prep
Details
       

 08-25-2010
3.00
yellow paint
Details
       

 08-24-2010
3.00
more sanding
Details

 08-23-2010
5.00
paint prep
Details
       

 08-19-2010
4.00
cowl prep, gear legs
Details
       

 08-18-2010
3.00
gearleg upper fairings
Details

 08-17-2010
6.00
paint prep
Details
       

 08-13-2010
1.00
moving day
Details

 08-12-2010
4.00
wheel pant and paint prep
Details
       

 08-11-2010
6.00
wheel pants and cowl
Details
       

 08-10-2010
5.00
gearleg fairing alignment and intersection fairing
Details
       

 08-08-2010
1.00
pilot side wheelpant
Details
       

 08-06-2010
2.00
wheel pants
Details

 08-05-2010
0.10
seat belts
Details
       

 08-04-2010
4.00
wheel pants, etc
Details
       

 08-03-2010
3.00
wheels, brakes and gear legs
Details
       

 08-02-2010
2.00
emp fairing
Details
     

 08-01-2010
1.00
plenum
Details
     

 07-31-2010
1.00
plenum
Details

 07-30-2010
1.00
canopy
Details

 07-28-2010
2.00
canopy
Details

 07-27-2010
3.00
paint prep and plenum
Details
       

 07-25-2010
3.00
tail fiberglass
Details

 07-24-2010
2.00
riveted forward skin
Details
       

 07-23-2010
1.00
stripes and interior
Details
       

 07-20-2010
4.00
glassing tips and paint layout
Details
       

 07-19-2010
2.00
fiberglass tips
Details

 07-18-2010
1.00
elevator closeout inspection cover
Details
       

 07-17-2010
2.00
emp fairing
Details

 07-15-2010
2.00
canopy install
Details
       

 07-14-2010
3.00
forward skin
Details
       

 07-08-2010
1.00
riveting forward skin
Details

 07-07-2010
3.00
forward skin and cowl
Details
     

 06-21-2010
0.10
Montana registration
Details

 06-03-2010
0.10
N155BK
Details

 05-13-2010
6.00
right wing
Details
       

 05-12-2010
8.00
painted left wing
Details
       

 05-10-2010
6.00
primer
Details
       

 05-09-2010
2.00
cowl glassing
Details
       

 05-08-2010
2.00
paint prep
Details

 05-07-2010
3.00
paint
Details
       

 05-06-2010
2.00
cowl intake lay up
Details
       

 05-05-2010
2.00
cowl and wing prep
Details
       

 05-04-2010
4.00
tip ribs and paint prep
Details
       

 04-30-2010
1.00
wing tip
Details

 04-30-2010
0.10
Bill O'sale and registration
Details

 04-29-2010
0.10
seats ordered and bill of sale paperwork
Details

 04-28-2010
2.00
fairings and tips
Details

 04-27-2010
4.50
fuel tank close out
Details
       

 04-26-2010
1.00
fuel senders
Details
       

 04-25-2010
2.00
light reflector and fuel tanks
Details
       

 04-23-2010
2.00
wingtips
Details
     

 04-21-2010
1.00
RamAir and oil door
Details
       

 04-21-2010
3.00
oil door and other stuff
Details
       

 04-19-2010
1.00
remote oil door and cowl split
Details
     

 04-17-2010
2.00
inspect
Details

 04-13-2010
2.00
shunt wires and adel clamping
Details
       

 04-10-2010
2.00
comm check, music input
Details

 04-07-2010
3.00
purge knob, elevator trim knob
Details
       

 04-06-2010
2.00
autopilot wires and fuelines
Details

 03-31-2010
2.00
center tunnel wires, flaps and ramair knob
Details
       

 03-30-2010
3.00
pitot lines and more wires
Details
       

 03-28-2010
2.00
EGT/CHT wired
Details
       

 03-27-2010
2.00
emag/pmag
Details
     

 03-26-2010
2.00
fuel line and mags
Details
     

 03-25-2010
1.00
It's Alive! Powered up the panel
Details
       

 03-24-2010
2.00
grounds
Details
     

 03-23-2010
1.00
air filter
Details
       

 03-22-2010
3.00
more wiring
Details
       

 03-19-2010
0.50
routing wires and adding spiralwrap
Details

 03-19-2010
1.00
Ram air and starter
Details

 03-18-2010
1.00
Comm wiring
Details

 03-17-2010
1.00
getting the wires secured
Details
       

 03-16-2010
3.00
installed panel
Details
       

 03-13-2010
1.00
remote compass/OAT probe
Details
       

 03-12-2010
1.00
MP sensor, brake lines
Details
       

 03-10-2010
1.00
manifold pressure sensor
Details

 03-09-2010
2.00
wires and more wires
Details
       

 03-05-2010
1.00
Transponder and altitude encoder
Details

 03-03-2010
5.00
more wires
Details
       

 03-02-2010
3.00
wires
Details

 02-28-2010
1.00
wiring
Details

 02-27-2010
1.00
exhaust probes, dehydrators
Details

 02-25-2010
2.00
panel labeled
Details
       

 02-23-2010
4.00
vents and wires
Details
       

 02-16-2010
2.00
panel
Details
     

 02-14-2010
2.00
panel
Details

 02-12-2010
1.00
panel stuff
Details

 02-11-2010
2.00
throttle quad and cables
Details
       

 02-10-2010
8.00
throttle brackets/cables
Details
       

 01-27-2010
2.00
baffle/plenum
Details
       

 01-26-2010
3.00
baffles and cowl
Details
       

 01-23-2010
1.00
cowling
Details
       

 01-22-2010
1.00
baffles
Details

 01-20-2010
2.00
baffles
Details
       

 01-19-2010
3.00
Baffles
Details
       

 01-18-2010
2.00
cowl and baffles
Details
       

 01-13-2010
4.00
Baffles
Details
       

 01-12-2010
2.00
heat muff and map box
Details
       

 01-10-2010
0.50
engine re-mount
Details
       

 01-09-2010
3.00
pulled engine
Details
       

 01-08-2010
2.00
cowling rings/ air filter
Details
       

 01-07-2010
3.00
cowl attach & oil door
Details
       

 01-06-2010
2.00
cowling
Details
       

 01-05-2010
4.00
cowling
Details
       

 12-29-2009
3.00
more cowl
Details
       

 12-27-2009
0.50
cowl prep
Details
       

 12-26-2009
1.00
cables
Details

 12-22-2009
1.00
Installed prop and spinner
Details
       

 12-22-2009
1.00
Engine HUNG!!!!
Details
       

 12-21-2009
1.00
engine prep
Details
       

 12-18-2009
0.10
IO-360 is here....yippee
Details
       

 12-16-2009
2.00
engine mount and gear
Details
       

 12-15-2009
5.00
solenoids and wires
Details
       

 12-09-2009
1.00
mapbox
Details

 12-08-2009
1.00
no progress + battery box
Details

 12-02-2009
2.00
cowling and panel
Details
       

 11-17-2009
0.20
Whirlwind 200RV Prop
Details
       

 11-16-2009
2.00
firewall penetrations
Details
       

 11-12-2009
1.00
electrical and exhaust
Details

 11-11-2009
2.00
drilling the firewall
Details
     

 11-06-2009
1.00
panel layout
Details
       

 11-02-2009
0.10
Emag/Pmag
Details
     

 10-31-2009
1.00
FWF inventory
Details

 10-22-2009
0.10
prop spacer
Details
     

 10-20-2009
2.00
throttle mount and panel work
Details
       

 10-18-2009
2.00
panel dynon and throttle mockup
Details
       

 10-17-2009
1.50
panel work
Details
       

 10-15-2009
2.00
panel holes
Details
       

 10-14-2009
1.00
panel work
Details

 10-13-2009
4.00
panel and new FI unit
Details
       

 10-09-2009
0.10
located an engine
Details
     

 10-07-2009
1.00
FWD sub panel
Details
       

 10-06-2009
2.00
riveting aft top skin
Details
       

 10-03-2009
2.00
aft skin riveting
Details
       

 10-02-2009
1.00
elevator tips and aft skin
Details

 09-27-2009
1.00
tips
Details

 09-25-2009
0.50
elevator install
Details

 09-22-2009
3.00
VS & rudder fairing
Details
       

 09-19-2009
1.50
VS fairing and topskin aft
Details
       

 09-17-2009
1.00
wheel pants and more fiberglass
Details
     

 09-16-2009
2.00
VS fairing and wheel pants
Details
       

 09-15-2009
1.00
VS fairing
Details
       

 09-13-2009
1.00
VS faring
Details

 09-12-2009
1.50
tail
Details
       

 09-11-2009
3.00
VS fairing
Details
       

 09-11-2009
1.00
mounted VS and HS
Details
       

 09-10-2009
1.80
more canopy
Details
       

 09-09-2009
1.00
canopy glassing
Details

 09-07-2009
1.00
microbubbles
Details

 09-06-2009
1.00
canopy
Details
     

 09-05-2009
1.50
FIBERGLASS and glareshield lip
Details
       

 09-04-2009
2.00
tail bulkhead, rear window, glare shield
Details
       

 09-04-2009
1.00
canopy glassing
Details
       

 09-03-2009
4.00
canopy skirts
Details
       

 09-02-2009
2.00
aft top skin and tires and paint
Details

 09-01-2009
2.00
ELT mount
Details
       

 08-31-2009
1.50
canopy latch
Details
       

 08-30-2009
1.00
seat back and canopy frame
Details

 08-29-2009
2.00
Strobe pak, ELT mount, painted parts
Details
       

 08-29-2009
2.00
odds/ends aft of seats
Details
       

 08-28-2009
2.00
trim cable reroute and aft top skin
Details
       

 08-28-2009
0.50
paint and tires
Details

 08-27-2009
4.00
canopy latch, rollbar and brace
Details
       

 08-26-2009
1.00
glareshield and aft skin
Details
       

 08-25-2009
4.00
Tip up latch fabrication
Details
       

 08-25-2009
1.00
canopy frame
Details
       

 08-24-2009
2.00
canopy
Details

 08-23-2009
2.00
rear window/canopy
Details
       

 08-22-2009
2.00
canopy/rear window
Details
       

 08-21-2009
2.00
canopy
Details
       

 08-20-2009
2.00
canopy
Details
       

 08-04-2009
1.00
throttle and trim placement
Details
       

 07-27-2009
1.00
fuel line
Details
       

 07-26-2009
2.50
fuel lines
Details
       

 07-25-2009
2.00
HP fuel pump
Details
       

 07-24-2009
2.00
fuel pump and tunnel cover
Details
       

 07-22-2009
3.00
center tunnel/fuel pump cover
Details
       

 07-15-2009
1.00
wing removal and fuse clean out
Details

 07-14-2009
2.00
bottom skins riveted
Details

 07-01-2009
2.00
nav/landing light
Details
       

 06-30-2009
1.00
left wing tip install
Details
       

 06-28-2009
2.00
left wing tip
Details

 06-27-2009
4.00
right wingtip install w/ lights
Details
       

 06-23-2009
2.00
flaps and ailerons
Details

 06-19-2009
2.00
flaps install
Details
       

 05-27-2009
2.00
wing root fairing and flap attach
Details
       

 05-26-2009
0.50
wing root and panel print
Details
       

 05-19-2009
0.10
panel layout
Details
       

 05-15-2009
1.00
wing attach
Details

 05-12-2009
1.00
wing mating
Details

 05-06-2009
0.50
wings in place
Details
       

 05-06-2009
0.50
positioned wings for initial mating
Details
       

 05-05-2009
0.50
wing install prep
Details
       

 05-03-2009
2.00
left wing
Details
       

 05-02-2009
1.00
riveting bottom skin
Details

 04-19-2009
2.50
bottom skn riveting
Details

 04-18-2009
2.00
left wing riveting
Details

 04-17-2009
1.00
bottom skin prep
Details
       

 04-11-2009
4.00
left wing wiring & pitot
Details
       

 04-10-2009
1.00
wing rivets
Details

 04-09-2009
1.00
bottom skin
Details

 04-08-2009
4.00
bottom skin riveting
Details
       

 03-31-2009
0.10
avionics
Details

 03-04-2009
2.00
bottom skin right wing
Details
       

 02-27-2009
2.00
fuel selector plate
Details
       

 02-25-2009
1.00
wiring
Details
       

 02-18-2009
2.00
rear spar and wiring
Details
       

 02-17-2009
2.00
shop reorganize and aielron stops
Details
       

 02-16-2009
1.00
success....kinda
Details

 02-16-2009
1.00
computer recovery
Details

 12-16-2006
1.00
First part
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.