KitLog pro

Powered By Kitlog Pro v2.0

Brian's RV-7 Web Site
Work Logs Found: 45
Category Work Time: 107 Hours
 Date
Hours
Work Log Summary

Details

 10-03-2010
2.00
wiring and brakes
Details
       

 10-02-2010
2.00
plug wires
Details
     

 10-01-2010
4.00
baffles, plenum and other FF
Details
     

 09-30-2010
2.00
final baffle install
Details

 09-29-2010
7.00
Baffles, prop, stencils
Details
       

 09-28-2010
6.00
Exhaust installed then various clamps, plug wires,
Details
       

 09-27-2010
3.00
fuel flow and starter cable
Details
       

 09-26-2010
3.00
starter cable and fuel flow xdcr
Details

 09-25-2010
2.00
more stinking baffles
Details

 09-24-2010
2.00
baffles
Details

 09-23-2010
2.00
baffles
Details

 09-22-2010
4.00
oil cooler and plenum
Details
       

 09-19-2010
2.00
oil cooler and plenum
Details
       

 08-01-2010
1.00
plenum
Details
     

 05-05-2010
2.00
cowl and wing prep
Details
       

 04-21-2010
1.00
RamAir and oil door
Details
       

 04-21-2010
3.00
oil door and other stuff
Details
       

 04-13-2010
2.00
shunt wires and adel clamping
Details
       

 03-28-2010
2.00
EGT/CHT wired
Details
       

 03-27-2010
2.00
emag/pmag
Details
     

 03-26-2010
2.00
fuel line and mags
Details
     

 03-23-2010
1.00
air filter
Details
       

 03-19-2010
1.00
Ram air and starter
Details

 02-11-2010
2.00
throttle quad and cables
Details
       

 02-10-2010
8.00
throttle brackets/cables
Details
       

 01-27-2010
2.00
baffle/plenum
Details
       

 01-26-2010
3.00
baffles and cowl
Details
       

 01-23-2010
1.00
cowling
Details
       

 01-22-2010
1.00
baffles
Details

 01-20-2010
2.00
baffles
Details
       

 01-19-2010
3.00
Baffles
Details
       

 01-18-2010
2.00
cowl and baffles
Details
       

 01-13-2010
4.00
Baffles
Details
       

 01-12-2010
2.00
heat muff and map box
Details
       

 01-10-2010
0.50
engine re-mount
Details
       

 01-09-2010
3.00
pulled engine
Details
       

 12-27-2009
0.50
cowl prep
Details
       

 12-26-2009
1.00
cables
Details

 12-15-2009
5.00
solenoids and wires
Details
       

 12-08-2009
1.00
no progress + battery box
Details

 12-02-2009
2.00
cowling and panel
Details
       

 11-16-2009
2.00
firewall penetrations
Details
       

 11-12-2009
1.00
electrical and exhaust
Details

 11-11-2009
2.00
drilling the firewall
Details
     

 10-31-2009
1.00
FWF inventory
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.