KitLog pro

Powered By Kitlog Pro v2.0

Brian's RV-7 Web Site
' style=
Date:  10-5-2010
Number of Hours:  6.00
Manual Reference:  
Brief Description:  wings torqued, ailerons, oil cooler

Big day w/lots of progress. Installed all the close tolerance bolts in wing spars and Torqued. Next Neil helped me hang the ailerons. and hooked them to the stick. YIPPEE I have control.

Got my hoses from Bonaco. so installed the oil cooler. and then the fuel vent lines.

Added 7qts of aeroshell 80w mineral oil. pulled the spark plugs and turned the prop by hand.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.