Fabbed up new elevator FWD pushrod. Original one was built to spec, but had very little thread engagement. New one is .375 longer. Crawled in the tail, torgued seatbelt mounts, cleaned and installed tiedown points for tail wire runs. finished up nutplate install on under floor strobepak. tightened bolts on flap mechanism.