KitLog pro

Powered By Kitlog Pro v2.0

Brian's RV-7 Web Site
' style=
Date:  9-30-2010
Number of Hours:  2.00
Manual Reference:  
Brief Description:  final baffle install

finishing up the baffle system. left side is 90% done. might need to pull the dip stick tube to get one bolt installed ...aargh!

Talked with FSDO and need to get paperwork to him soon.

Insurance binder with Falcon authorized, N155BK will be insured starting tomorrow
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.