KitLog pro

Powered By Kitlog Pro v2.0

Brian's RV-7 Web Site
' style=
Date:  12-21-2009
Number of Hours:  1.00
Manual Reference:  
Brief Description:  engine prep

Had to enlarge holes in the govenor bracket, then install it on the PCU 5000 governor. also had to rotate the arm to hopefully have it clocked correctly. re-lockwired 6 screws

Installed oil cooler supply/return fittings and oil pressure fitting

Installed fuel pump overflow and outlet fittings
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.