Ran tubing from Dynon to wing root area for AOA and Pitot connections.Spiral wrapped wires going to the tunnel area. Ran fuel sender wires, power to strobe pak, flaps, NAV & Landing lights wires. Drilled and installed bushings for Strobe runs to wing root area.