Powered By Kitlog Pro v2.0
Brian's RV-7 Web Site
RV-7
All
3-31-2010
< Previous Log Entry
Next Log Entry >
Date:
3-31-2010
Number of Hours:
2.00
Manual Reference:
Brief Description:
center tunnel wires, flaps and ramair knob
Tidy'd up the center tunnel wires, added spiral wrap. Pulled fuel pump out for plumbing return line(soon).
Terminated flap wiring and tested flap operation. Still need to torgue flap rod attachment and lockwire rod end.
Drilled panel and installed RamAir knob and planning for Purge valve knob below it.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
rv-7 Home
RV-7 Home
Category
# Logs
# Hours
All
293
672
Avionics
14
21
Empennage
2
2
Engine
7
4
Final Assembly
28
86
firewall forward
45
107
Fuselage
114
264
milestones
28
86
Miscellaneous
11
10
None
2
3
Phase 1
2
3
Prop
3
1
visitors
2
3
Wings
35
82
Copyright © 2001-2024 Matronics. All Rights Reserved.