KitLog pro

Powered By Kitlog Pro v2.0

Brian's RV-7 Web Site
' style=
Date:  8-3-2010
Number of Hours:  3.00
Manual Reference:  
Brief Description:  wheels, brakes and gear legs

Jacked up and level the plane with the mains off the ground. Tore apart the wheels/brakes to add shims for the clearance between the brakes and the wheel pant attach brackets. The shim is needed due to the ovesize 380-150x5 tires.

Started on the gear leg fairings and wheel pants.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.