Finished fabricating the 721 brace for the panel. Built new rib for left side of panel, cut out the old one as it was in the way for the Dynon. Fedex brought my new AFP FI unit, ok it's used but only has 1 hr test time on it. Started laying out panel for cutting....back after dinner and cut the hole for GPS, Comm and Xpnder
photo 3 is the FI unit photo 2 is the panel with one rib installed photo 1 is panel after I cut holes for GPS, Comm and Xpndr