Previous Builder
Next Builder
Date: 04-17-2022
|
Number of Hours: 1.00
|
Short Description: Right Wing Trailing Edge Work
|
A small batch of epoxy was mixed. Two ply bid was applied to a damaged portion of the trailing edge near the outboard end of the right wing. The bid was clamped in place with shims covered in plastic to cure.
Dry micro was mixed and applied to the top of the inboard trailing edge repairs to smooth it out.
Previous Builder
Next Builder
|