Date: 07-16-2025
|
Number of Hours: 7.00
|
Short Description: FWF Wiring and engine installation
|
Wired all the CHT and EGT probes and secured the wires, Made cutom silicone tubing connection for the air/oil seperator, Assembled cabin heat muff and cut Sceet tubing to length. Made a battery hold-down, painte that and the fuel red cube mount.
|