Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  Randy Doughty
Location:
  Fayetteville, AR - USA
Aircraft:
  CH750 Cruzer
Total Build Hours:
  582
Web Site:
  http://www.mykitlog.com/srdough/

Date:  06-21-2020
Number of Hours:  2.00
Short Description:  Drilled L brackets and riveted to baggage floor

Drilled and installed the L brackets on the baggage floor. Fitted baggage floor in fuselage. Cut and riveted the short L brackets that go on the sides of the floor.










Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Bob Collins
RV-12iS
07-02
640
Carl Orton
750 Cruzer
07-02
638
John Peck
C120
07-02
330
Peter Calley
Sling4
07-02
2233
Anthony Jolly
RV-7
07-01
217
David LeFrancois
Cozy MKIV
07-01
5
Greg Long
RV-12
07-01
1351
Martin Filiatrault
RV-8
07-01
2683
Mike Mitchell
RV-14A
07-01
171
Chris King
Fokker D.VII
06-30
1676
Edward Beam
RV-14A
06-30
470
Greg Schroeder
Sportsman 2+2
06-30
2736
John Bickham
Bearhawk
06-30
3104
Matthew Lorenz
RV-10
06-30
108
Robert Lussow
RV-10
06-30
2708
Wesley VanDyke
RV-8
06-30
1374
Andrey Piskarev
Highlander
06-29
1263
James Roberts
RV8
06-29
124
Rick McBride
RV-10
06-29
1780
Steve Veach
RV-7
06-29
20
Bob Corriveau
RV-8
06-28
1679
Brian Perry
RV-14a
06-28
784
Jean Gosselin
RV6
06-28
870
Thomas Ferranti
RV7
06-28
233
Alan Kessler
Ch601xlb
06-27
384
David Lewis
RV10
06-27
2661
Don Johnson
RV-8
06-27
222
Paul Minelga
Bearhawk
06-27
2296
Peter McBain
RV-9A
06-27
1481
Sean Smith
CX5
06-27
929

Projects Uploaded: 1487
Logs Uploaded: 259321








Copyright © 2001-2020 Matronics. All Rights Reserved. Privacy Policy.