KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
Work Logs Found: 532
Category Work Time: 2663 Hours
 Date
Hours
Work Log Summary

Details

 11-04-2014
10.00
Pre buy
Details
     

 08-30-2014
1.00
Putting my plane up for sale was not easy
Details

 09-30-2011
12.00

Details
       

 03-07-2011
5.00

Details
     

 10-05-2010
5.00
Hot Springs, SD
Details
       

 08-10-2010
12.00
Oshkosh 2010
Details
       

 05-29-2010
0.20
finished paint
       

 04-25-2010
1.00
painting
Details
       

 04-15-2010
1.00
painting
       

 04-14-2010
1.00
Painting
       

 04-09-2010
1.00
Painting
Details
       

 04-05-2010
1.00
paint
Details
       

 02-21-2010
1.50
Paint prep
Details
     

 10-18-2009
2.50
Trip to Omaha (Blair, Ne)
Details
       

 08-28-2009
2.50
Flight to Logan, Ut and back
Details
       

 04-05-2009
0.20
Flying
Details

 09-17-2008
2.40
1st Long cross country
Details
       

 09-14-2008
1.20
getting used to this flying thing
Details
       

 09-13-2008
2.00
FSDO
Details

 09-09-2008
0.50
First Flight
Details
       

 09-04-2008
10.00
stiffeners
Details
       

 08-28-2008
10.00
cabin carpet
Details
     

 08-22-2008
5.00
Wraping things up
Details

 08-21-2008
5.00
Inspection Day
Details
       

 08-20-2008
8.00

Details

 08-18-2008
5.00

Details

 08-12-2008
20.00

Details

 08-10-2008
8.00

Details

 08-05-2008
17.00
cowling and fairings
Details

 08-01-2008
5.00
soundproofing etc
Details
     

 07-24-2008
5.00
Programing and GRT RPM SW replacement
Details

 07-24-2008
17.00
Inspection Prep
Details

 07-22-2008
7.00
Inspection Prep
Details

 07-21-2008
5.00
Inspection Prep
Details
     

 07-08-2008
8.00
FUSELAGE AND INTERIOR WIRING
Details

 07-04-2008
14.00
FUSELAGE WORK
Details

 07-02-2008
5.00

Details

 06-28-2008
7.00

Details

 06-27-2008
8.00

Details

 06-25-2008
4.00
REMOVED AND CLEANED AIR FILTER
Details

 06-24-2008
4.00

Details
       

 06-23-2008
5.00

Details
       

 06-22-2008
5.00

Details
       

 06-20-2008
8.00
FIBER GLASS WORK
Details

 06-16-2008
14.00

Details

 06-13-2008
12.00
FINISHING UP SEVERAL THINGS
Details

 06-12-2008
3.00

Details

 06-11-2008
5.00
CREATING PANEL LABELS
Details
     

 06-09-2008
10.00

Details

 06-06-2008
10.00
RE PAINT LOWER SWITCH/BREAKER PANEL
Details

 06-03-2008
16.00
FLAP SWITCH AND CABIN WIRING
Details

 06-02-2008
4.00
FLAP SWITCH
Details

 05-29-2008
10.00
FABRICATING FLAP SWITCH/SENSOR MOUNT
Details
       

 05-28-2008
4.00
DRILLED OPENING FOR FUEL DRAIN ACCESS
Details

 05-27-2008
5.00
RE ROUTED BRAKE LINES
Details

 05-25-2008
10.00

Details

 05-24-2008
2.00

Details

 05-22-2008
5.00
WING TIP RIBS
Details
     

 05-19-2008
14.00

Details

 05-18-2008
5.00
HS FAIRING
Details
     

 05-16-2008
5.00

Details
       

 05-15-2008
5.00
RECHECKED AILERON HARD WARE ETC
Details

 05-14-2008
5.00
HINGE PIN LOCKS
Details
     

 05-13-2008
5.00
CUT DOWN CONTROL STICKS
Details

 05-12-2008
5.00

Details

 05-10-2008
7.00

Details
       

 05-09-2008
5.00

Details
       

 05-07-2008
9.00

Details
       

 05-04-2008
10.00

Details
       

 04-28-2008
14.00

Details
       

 04-24-2008
20.00

Details
     

 04-23-2008
3.00

Details
       

 04-22-2008
6.00

Details
       

 04-16-2008
22.00

Details
       

 04-07-2008
22.00

Details
       

 04-02-2008
13.00
STARTED AIR FILTER BOX
Details

 03-28-2008
13.00

Details
       

 03-24-2008
12.00

Details
       

 03-18-2008
20.00

Details
       

 03-09-2008
20.00
WORK ON BAFFELS ETC
Details
       

 03-04-2008
15.00
REINSTALLING UPGRADED EFIS #1 AND ADI
Details
       

 02-23-2008
2.00
Les's first flight
Details

 02-23-2008
16.00
FABRICATING BAFFLES
Details

 02-22-2008
2.00

Details

 02-19-2008
7.00

Details
       

 02-14-2008
12.00

Details

 02-13-2008
5.00
DRILLED MAIN GEAR
Details
       

 02-09-2008
5.00
PUT ON NEW PITOT/STATIC CONNECTORS
Details

 02-08-2008
2.00
REPLACED ELEVATOR TO CONTROL BOLT
Details

 02-03-2008
4.00
AHRS TEMP PROBE
Details

 02-02-2008
6.00
RIGHT WING WIRING
Details

 01-31-2008
7.00
WING TIP WIRING
Details

 01-29-2008
3.00
CHECKING FOR LEAKS IN PITOT/STATIC
Details

 01-29-2008
5.00

Details

 01-28-2008
6.00
WING TO FUSELAGE WIRING
Details

 01-27-2008
4.00
LEFT WING TIP
Details

 01-25-2008
5.00
INSTALLING NUT PLATES LEFT WING TIP
     

 01-24-2008
5.00
WATCHING PITOT/STATIC TESTING
Details

 01-23-2008
3.00
REPLACING GARMIN SCREWS
Details

 01-14-2008
20.00
WING TIPS AND GEAR LEG FAIRINGS
Details
       

 01-11-2008
3.00
WIRES
Details

 01-10-2008
4.00
AILERON PUSH RODS
Details
     

 01-09-2008
2.00
AILERON PUSH RODS
Details
     

 01-06-2008
9.00
ADJUSTING FLAPS AND AILERONS
Details
       

 01-05-2008
3.00
AILERONS
Details

 01-04-2008
5.00

Details

 01-03-2008
5.00
FLAPS
Details

 01-02-2008
8.00
FLAPS
Details

 12-30-2007
3.00
RW FLAP
Details

 12-29-2007
6.00

Details
       

 12-28-2007
10.00
CHECKING WING INCIDENCE AND SWEEP
Details
     

 12-23-2007
4.00
INSTALLED SPAR BOLTS
Details
     

 12-22-2007
4.00
INSTALLED WINGS
Details
       

 12-21-2007
4.00
GETTING READY TO INSTALL WINGS
Details

 12-19-2007
14.00
FINISHED UP RIVETING BOTTOM WING SKINS
Details
     

 12-18-2007
6.00
RIVETING BOTTOM WING PANELS
Details
     

 12-17-2007
6.00
BAFFELS
Details

 12-12-2007
10.00
BAFFELS
Details

 12-06-2007
5.00
ENGINE BAFFELS
Details

 12-05-2007
4.00
LEFT WING LEAK TEST
Details
       

 12-04-2007
5.00
LEAK TEST ON LEFT WING
Details

 12-03-2007
5.00
LEFT WING TRIM OF REAR SPAR
Details
       

 11-29-2007
4.00
AILERON STOPS
Details

 11-26-2007
15.00
WING FAIRING
Details

 11-20-2007
9.00
HOOKED UP PANEL AGAIN
Details

 11-18-2007
9.00
REINSTALLED INSTRUMENTS
Details

 11-17-2007
4.00
VS TIP
Details
     

 11-14-2007
13.00
WIND SCREEN
Details
       

 11-13-2007
4.00
COWLING
Details

 11-11-2007
3.00
COWLING
Details

 11-10-2007
6.00
TOP AND BOTTOM HINGE ON COWL
Details
       

 11-09-2007
5.00
WIND SCREEN AND COWL
Details
       

 11-08-2007
5.00
WIND SCREEN AND TOP COWL HINGES
Details
       

 11-06-2007
9.00
WIND SCREEN AND FIREWALL
Details

 11-04-2007
6.00
WIND SCREEN
Details
     

 10-30-2007
8.00
WIND SCREEN
Details
       

 10-28-2007
5.00
WIND SCREEN
Details

 10-26-2007
3.00
WIND SCREEN
Details
     

 10-24-2007
10.00
FIBERGLASSING THE WIND SCREEN
Details
       

 10-23-2007
10.00
WIND SCREEN
Details

 10-22-2007
5.00
WIND SCREEN INSTALL
Details

 10-18-2007
5.00
RIVETING F-7106
Details

 10-17-2007
5.00
F-7106 RIVETING
Details
       

 10-16-2007
5.00
REMOVING EFIS, RADIOS ETC
Details

 10-12-2007
5.00
RFI
Details

 10-10-2007
5.00
RFI
Details

 10-09-2007
5.00
RFI
Details

 10-08-2007
4.00
RFI
Details

 10-05-2007
4.00

Details

 10-01-2007
4.00

Details

 09-30-2007
3.00
RFI
Details

 09-28-2007
4.00
AILERON BOOT BRACKETS
Details
     

 09-27-2007
5.00
AILERON BOOTS
Details

 09-25-2007
3.00
RFI
Details

 09-19-2007
4.00
RF INTERFERANCE
Details

 09-17-2007
5.00
RF INTERFERANCE
Details

 09-16-2007
5.00

Details

 09-15-2007
2.00

Details

 09-12-2007
8.00
EMPENNAGE TIPS
Details
       

 09-11-2007
5.00
R-911 RUDDER BOTTOM INSTALL
Details
       

 09-08-2007
8.00

Details

 09-06-2007
8.00

Details

 09-03-2007
4.00

Details
       

 09-02-2007
4.00

Details
     

 09-01-2007
4.00

Details
     

 08-31-2007
4.00

Details

 08-27-2007
6.00

Details

 08-27-2007
5.00

Details

 08-27-2007
4.00

Details
     

 08-26-2007
4.00

Details

 08-25-2007
6.00

Details
     

 08-22-2007
5.00

Details
     

 08-20-2007
10.00

Details

 08-15-2007
5.00

Details

 08-10-2007
5.00

Details

 08-09-2007
4.00

Details

 08-08-2007
5.00

Details

 08-07-2007
5.00

Details

 08-06-2007
5.00

Details

 08-04-2007
8.00

Details
     

 07-27-2007
5.00

Details

 07-26-2007
4.00

Details

 07-25-2007
4.00

Details

 07-24-2007
2.00

Details

 07-23-2007
4.00

Details

 07-22-2007
4.00

Details

 07-19-2007
6.00

Details

 07-18-2007
4.00

Details

 07-15-2007
11.00

Details

 07-10-2007
11.00

Details

 07-09-2007
4.00
tunnel covers and baggage floor
Details

 07-08-2007
4.00

Details

 07-07-2007
3.00

Details

 07-06-2007
5.00

Details

 07-05-2007
3.00

Details

 07-03-2007
4.00

Details

 07-01-2007
6.00

Details

 06-20-2007
8.00

Details

 06-18-2007
8.00
PANEL WORK
Details

 06-15-2007
4.00
Power to Panel
     

 06-10-2007
8.00
Stick wiring to panel
Details

 06-08-2007
4.00
redone some RG-400 cables

 06-04-2007
14.00
wiring
Details

 06-03-2007
3.00

Details

 05-30-2007
13.00
wiring
Details

 05-25-2007
4.00
finished previous days work

 05-24-2007
4.00
GPS-EFIS-Switches etc

 05-15-2007
20.00
more wiring
Details

 05-10-2007
15.00
wiring
Details

 05-08-2007
4.00
added sw
Details

 05-07-2007
4.00
wired amp sensor
Details

 05-06-2007
3.00
WIRES TO ENGINE
Details

 05-04-2007
4.00
WIRING AT ENGINE
Details

 05-03-2007
2.00
HELPED BRAD INSTALL HIS WINGS
Details
       

 05-02-2007
4.00
MUSIC IN PLUG
Details

 05-01-2007
3.00
DRILLED LOCATION FOR CB 1AMP
Details

 04-30-2007
5.00
WIRING
Details

 04-26-2007
4.00
HEAD SET PLUGS
Details
       

 04-25-2007
4.00
COPILOT SIDE PLUGS
Details

 04-12-2007
4.00
ANNUNCIATOR LIGHTS
Details

 04-11-2007
4.00
CB'SAND SWS
Details

 04-10-2007
4.00
CUT DOWN SERVO WIRES
Details

 04-09-2007
4.00
WIRES TO TRUTRAK
Details

 04-05-2007
4.00
MADE BRACKETS FOR AHRS
Details

 04-04-2007
4.00
WIRING
Details

 04-03-2007
4.00
MORE PANEL WORK
Details

 04-02-2007
4.00
WIRING ON PANEL

 04-01-2007
4.00
DRILLED HOLES FOR WIRES TO ENGINE
Details

 03-31-2007
3.00
PARKING BRAKE AND HEATER CABLE
Details

 03-26-2007
4.00
DRILLED HOLES FOR RADIO ETC
Details

 03-24-2007
4.00
Drilled holes for Gretz heated pitot lights
Details

 03-23-2007
2.00
installed terrain memory on the GRT's
Details
       

 03-22-2007
4.00
Drilled hole for EIS cables in firewall
Details
       

 03-21-2007
4.00
Mounted AOA brackets after priming
Details
       

 03-20-2007
4.00
reinstalled breaker switches
Details

 03-19-2007
4.00
second coat on panel
Details
     

 03-18-2007
4.00
Fabricated Radio Support brackets
Details
     

 03-17-2007
3.00
installed nut plates for radio mount
Details
     

 03-16-2007
3.00
Fuel flow installation
Details
     

 03-14-2007
5.00
Switch breakers
Details
       

 03-13-2007
2.00
measured holes for more switch/breakers
Details
     

 03-13-2007
3.00

Details

 03-12-2007
2.00
continued work on AOA
     

 03-11-2007
3.00
AOA install
Details

 03-07-2007
3.00
drilled holes in Exhaust manifold
Details
     

 03-06-2007
3.00

Details
       

 03-05-2007
3.00
cutting panel for radios and routing wires
     

 03-04-2007
3.00

Details

 02-19-2007
4.00
Foam for seats
Details
       

 02-11-2007
3.00
Panel
Details
     

 02-06-2007
2.00
stick grip pin
Details
     

 02-05-2007
2.00
Installed quick drain plug on engine
Details

 02-04-2007
2.00
shortened control sticks
Details
       

 01-29-2007
2.00
Installed crotch belt/bolts
     

 01-22-2007
3.00
tail lites/strobe
Details

 01-15-2007
2.00
Silver soldered primer line
Details

 01-10-2007
2.00
Radio, GRT, AOA, AI ordering

 01-08-2007
2.00
Battery box
Details

 01-04-2007
3.00
Battery box and cables
Details

 12-30-2006
2.00
worked on strobe power install

 12-28-2006
0.00
shoveling snow from our 14" storm
     

 12-27-2006
3.00
Engine control bracket
Details
     

 12-19-2006
4.00
Fuel Pump over flow
Details

 12-18-2006
4.00
Installed 2 more hoses to engine
Details
       

 12-15-2006
3.00
installed the flap switch
Details
     

 12-14-2006
4.00
Bus Bar
Details
     

 12-13-2006
4.00
installing the primer system
Details

 12-08-2006
5.00
Wire harness hook up
Details
     

 12-07-2006
5.00
mounting of park brake
Details
       

 11-29-2006
4.00
Engine control bracket
Details

 11-28-2006
3.00
Helped Les mount his engine
Details

 11-22-2006
3.00
throttle cable
Details

 11-21-2006
4.00

Details
     

 11-17-2006
5.00
pitot installation
Details
       

 11-16-2006
4.00
Gretz heated pitot
Details
       

 11-15-2006
5.00
Gretz heated pitot
Details

 11-13-2006
3.00
riveted lower firewall skin
Details

 11-12-2006
2.00
riveted left cowl hinge to fire wall

 11-10-2006
4.00
bus bar fabrication
Details
       

 11-09-2006
5.00
finished drilling switch plate
Details
     

 11-08-2006
4.00
Switch/breakers
Details
     

 11-07-2006
4.00
top cowl support
Details

 11-06-2006
5.00
more work on cowl
Details
       

 11-03-2006
6.00
more fitting on cowl

 11-02-2006
6.00
cowling work
Details

 10-31-2006
4.00
made location for strobe PS
Details
     

 10-30-2006
5.00
running conduit
Details

 10-27-2006
4.00
Finished rw conduit install
Details
       

 10-26-2006
4.00
Drilling RW for conduit install
Details
     

 10-25-2006
4.00
Wing tip lighting
Details

 10-24-2006
4.00
Same on Left wing tip
     

 10-23-2006
4.00
work on wing tips
Details
     

 10-21-2006
2.00
cutting wing tips for lighting
     

 10-20-2006
5.00
landing lights/strobes
Details
     

 10-19-2006
4.00

Details
     

 10-18-2006
4.00
install of roll servo
Details
     

 10-17-2006
3.00
Trimed top /bottom cowl
     

 10-16-2006
3.00

Details

 10-13-2006
5.00

Details
     

 10-11-2006
4.00
started work on cowling
Details
     

 10-09-2006
4.00

Details
       

 10-08-2006
4.00
battery ground connection
Details
     

 10-07-2006
4.00
inventoried wiring kit
Details

 10-05-2006
3.00
carburator and engine control bracket
Details
     

 10-04-2006
4.00
retorqued landing gear bolts
Details

 10-03-2006
5.00
exhaust / trutrak pitch servo
Details
     

 10-02-2006
4.00
alternator install
Details

 10-01-2006
3.00
exhaust and heat muff
Details
     

 09-28-2006
5.00
Engine mounting
Details
       

 09-27-2006
5.00

Details
     

 09-26-2006
4.00
heat valve
Details
     

 09-25-2006
3.00
Firewall
Details

 09-21-2006
4.00
Gascolater mounting
Details
     

 09-20-2006
6.00
Starter and master relays
Details
     

 09-19-2006
4.00
Battery box to firewall
Details
     

 09-18-2006
5.00
Battery brackets& mounts
Details
     

 09-17-2006
5.00
Fire wall
Details
     

 09-16-2006
4.00
inventoring fire wall forward kit

 09-12-2006
3.00
Replacing bad rivets in vertical stabilizer

 09-11-2006
2.00
Rear canopy skirts
Details

 09-01-2006
2.00
Ground more stock off canopy latch/too tight

 08-31-2006
4.00
rear skirts
Details

 08-30-2006
6.00
Riveting canopy
Details
       

 08-29-2006
6.00
preping side skirt parts
Details
       

 08-28-2006
6.00
rear skirts
Details

 08-27-2006
5.00
Matched drilled all skirt parts to final size
Details

 08-26-2006
4.00
RS rear skirt
Details

 08-24-2006
4.00
canopy side skirt brace
Details
       

 08-23-2006
5.00
rear skirts
Details
     

 08-21-2006
3.00
Rear skirts
Details

 08-18-2006
4.00
same on RS

 08-17-2006
4.00
side skirts
Details
       

 08-16-2006
4.00
Readjusting canopy blocks

 08-15-2006
5.00
installed rear block mounts
Details

 08-14-2006
5.00
final install of slide rails
Details
     

 08-13-2006
4.00
Canopy latch asy
Details
       

 08-12-2006
3.00
Work on side skirts

 08-10-2006
4.00
started side skirts
     

 08-09-2006
5.00
canopy work
Details
     

 08-05-2006
4.00
Canopy work

 08-04-2006
4.00
Canopy work adjusting and measuring

 08-03-2006
5.00
trimmed up canopy
Details

 08-02-2006
5.00
Slider canopy drilling
Details
       

 08-01-2006
4.00
more cutting and deburing on wind screen

 07-30-2006
4.00
cut wind screen down more

 07-29-2006
4.00
Canopy prep for drilling

 07-27-2006
4.00
canopy
Details

 07-26-2006
6.00
canopy cut
Details
       

 07-24-2006
5.00
canopy cut
Details
       

 07-17-2006
5.00
canopy frame
Details

 07-15-2006
1.00
last pictures of engine run up
       

 07-14-2006
4.00
Engine run up
Details
       

 07-13-2006
8.00
Final day of build school
Details
       

 07-12-2006
8.00
Engine build school
Details
       

 07-11-2006
8.00
Engine build school
Details
       

 07-07-2006
3.00
Canopy
Details

 07-05-2006
3.00
canopy
Details

 07-04-2006
3.00
canopy work

 07-03-2006
3.00
canopy work

 07-02-2006
3.00
still practicing with scrap

 07-01-2006
4.00
Canopy
Details

 06-30-2006
4.00
canopy work

 06-29-2006
4.00
canopy bending etc

 06-28-2006
4.00
canopy work

 06-27-2006
4.00
canopy
Details

 06-24-2006
4.00
canopy frame
Details

 06-24-2006
4.00
canopy
     

 06-23-2006
4.00
slider frame asy
Details

 06-22-2006
5.00
Roll bar mount
Details
       

 06-21-2006
4.00
Roll bar mount
Details

 06-20-2006
4.00
Roll bar
Details

 06-19-2006
4.00
Roll bar
Details

 06-16-2006
4.00
Rudder cable fairings
Details

 06-15-2006
4.00
repair tail asy
Details

 06-14-2006
4.00
emp fairing
Details
     

 06-13-2006
3.00
upper emp fairing
Details

 06-11-2006
5.00
Emp fairing
Details

 06-10-2006
4.00
aft top skin stiffners
Details
     

 06-09-2006
3.00
fuel pump install
Details
     

 06-08-2006
3.00
Fuel pump
Details

 06-07-2006
3.00
Right Wing tip
Details
     

 06-01-2006
3.00
Wing tips
Details
     

 05-31-2006
4.00
Wing tips
Details
     

 05-30-2006
4.00
Riveting in upper fuselage in
Details

 05-29-2006
3.00
Rudder brace
Details
       

 05-28-2006
4.00
Upper forward fuslage
Details

 05-26-2006
3.00
F7108
Details

 05-24-2006
4.00
Magnometer mount
Details
     

 05-23-2006
3.00
Sealed Right wing tank
Details
     

 05-22-2006
1.00
Vent lines
Details
     

 05-21-2006
2.00
checking out Les's RV7 project
Details

 05-19-2006
3.00
Installing LW lense

 05-17-2006
4.00
Cutting plastic
Details
       

 05-16-2006
4.00
installing washers/spacers in aileron hinges
Details
     

 05-15-2006
4.00
Work on ailerons
Details
     

 05-12-2006
3.00
continued work on fuel vent lines

 05-11-2006
4.00
Fuel vent lines
Details

 05-10-2006
4.00

Details
       

 05-08-2006
4.00
Work on Panel
Details
       

 05-07-2006
4.00
Fabricated F 746 for engine controls
Details

 05-06-2006
3.00
Finishing rudder control asy
     

 05-05-2006
4.00
Finish cotter key installation
Details
     

 05-04-2006
3.00
Static ports installation
Details
       

 05-03-2006
3.00
Tie downs
Details
     

 05-02-2006
3.00
work on panel
Details
     

 05-01-2006
4.00
Reflared fuel lines for better fit

 04-28-2006
4.00
Rudder asy & F 7114 gussets
Details
       

 04-27-2006
4.00
Fuel lines to valve
Details
       

 04-26-2006
3.00
Fuel line install
Details
     

 04-25-2006
6.00
Remove upper fuselage
Details
     

 04-25-2006
4.00
initial cutting of flap rod hole in F-770
Details
       

 04-23-2006
3.00
Emp attach
Details

 04-20-2006
3.00
reorganizing small parts
Details

 04-19-2006
5.00
Checking Right wing
Details
     

 04-18-2006
1.00
parts missing or needed to order
Details

 04-18-2006
4.00
Electric flap and empennage attach
Details
       

 04-17-2006
4.00
Fitting horizontal stabilizer
Details
     

 04-16-2006
3.00
Drilling Elevator horns
Details
     

 04-15-2006
4.00
tail wheel asy
Details

 04-12-2006
4.00
Revited some of the bad rivets on F-712
Details
     

 04-11-2006
4.00
Aft fuselage& tail asy
Details
       

 04-10-2006
3.00
Work on tail
Details
     

 04-06-2006
5.00
installing gear legs
Details
     

 04-05-2006
5.00
Wheels/tires
Details
       

 04-04-2006
4.00
wheels/tires
Details

 04-01-2006
2.00
Cut WD 643 Brace to fit and adj
       

 03-29-2006
4.00
Same finished

 03-28-2006
1.00
sent $1000 for deposit for XP 360 class in July

 03-27-2006
4.00
installed parts for crotch strap both seats
     

 03-19-2006
3.00
Went over canopy installation
Details
     

 03-18-2006
3.00
Linda helped w/dimpling RW skin/install nut plates

 03-17-2006
3.00
Riveted RW flap hinge, fabricated and installed FS

 03-17-2006
3.00
Finished motor mount
Details
     

 03-16-2006
3.00
Going over plans for canopy
Details
     

 03-16-2006
3.00
Drilled holes for engine mount
Details

 03-15-2006
4.00
Inventory parts

 03-14-2006
5.00
Fedex delivered finishing kit
       

 03-06-2006
5.00
Work on RW , drilled & deburred aileron brackets

 02-28-2006
4.00
installed fuel float asy in LW tank
Details

 02-27-2006
4.00
Coformed to mandatory SB 06-02-23
Details
     

 02-24-2006
3.00
dimpled LW bottom skin,installed nut plates
Details

 02-23-2006
5.00
installed LW Flap
Details
     

 02-22-2006
3.00
same

 02-21-2006
3.00
Working on left flap hard ware
     

 02-08-2006
5.00
Same

 02-07-2006
4.00
Started work on left wing aileron hardware
Details
     

 01-31-2006
3.00
Removed top forward skin and adj for better fit

 01-30-2006
2.00
Right stick too tight sanded for better fit

 01-27-2006
3.00
Cut out F792 per DWG27A Rudder stops

 01-20-2006
2.00
same/F-790 adj for 85 27/32+26/32 for ends=
Details
     

 01-18-2006
4.00
Primed and riveted same

 01-17-2006
4.00
Fabricated elevator and aileron push rods
Details

 01-13-2006
1.00
Fabricated rudder cable covers from web drawing

 01-09-2006
4.00
More work on panel layout/built L/R stick covers
Details

 01-04-2006
4.00
Finished manual trim per instructions on op-20

 01-03-2006
5.00
worked on manual trim mech

 12-29-2005
4.00
Dimpled F7112
Details

 12-28-2005
3.00
Drilled aft top skin F7112&longerons
Details

 12-27-2005
4.00
continued same

 12-26-2005
4.00
More work on upper fwd fuselage
Details

 12-23-2005
3.00
Install brake res,tubing&connectors,snap bushing

 12-14-2005
2.00
Downloaded info on dynon EFIS
     

 12-13-2005
3.00
Continued work on aft firewall, ribs etc

 12-11-2005
1.00
ordered parts/tools from ATS& AS

 12-07-2005
6.00
Too cold in hanger worked on panel layout
     

 12-06-2005
1.00
Ordered finishing kit

 12-06-2005
2.00
Clecoed F7106 skin on to check for fit
     

 12-05-2005
5.00
Fabricated F7108b/riveted plate nuts on F7103's

 11-29-2005
5.00
Finished F682 installed F782&F740

 11-25-2005
5.00
drilled & deburred F782 gusset/made F782 angles

 11-24-2005
4.00
Installed nut plates and riveted F747 L

 11-23-2005
4.00
finished above except for ms 24665

 11-22-2005
5.00
Fabricated F6119 and installed except for cotter k

 11-21-2005
6.00
Finished same

 11-20-2005
4.00
Installed elevator control link to cntrl column

 11-18-2005
2.00
Removed BAGGAGE floors

 11-18-2005
5.00
Drilled and dimpled,deburred left baggage floor

 11-16-2005
3.00
Riveted 796 C & D to skin

 11-11-2005
8.00
Trimed F757 gussets for F705 bulkhead/riveted

 11-08-2005
8.00
Center cabin cover asy
Details
     

 11-07-2005
8.00
Started work on forward covers F782C and parts

 10-31-2005
6.00
Finished both seat backs, riveted and hinged
     

 10-25-2005
6.00
Started work on seat backs, fabricated frames

 10-23-2005
3.00
fabricated F635 elevator bellcrank asy and install
     

 10-19-2005
5.00
Fabricated F796c-d,F796 B's for fuel tank support
     

 10-14-2005
6.00
deburred, sanded & primed WD-409 and F-112

 10-11-2005
6.00
Cut out bottom of fuselage per instruction W-409

 10-08-2005
8.00
Started work on F111,F112,WD-409 tail wheel asy

 10-06-2005
6.00
finished flap mtr and control
     

 09-28-2005
6.00
preparing 705 bulk head

 09-28-2005
5.00
Began work on electric flaps

 09-26-2005
8.00
Started work on rudder pedals

 09-24-2005
8.00
Inventory parts from Quick build

 09-22-2005
6.00
Quick Build wings and fuselage delivered
       

 07-01-2005
4.00
Same completed except for final balancing and fibe

 06-28-2005
4.00
Finished elevators
     

 06-13-2005
4.00
continued same

 06-10-2005
4.00
Riveting left elevator
     

 06-06-2005
6.00
Bending left elevator tabs

 06-02-2005
3.00
same

 06-01-2005
3.00
Riveting left elevator

 05-30-2005
2.50
Riveting RH elevator

 05-27-2005
2.00
Building trim tab hinge etc

 05-26-2005
4.00
Bent trailing edges etc
     

 05-25-2005
5.00
back rivet E 701 L/R skins and E 615 PP plate nuts
       

 05-23-2005
4.00
same

 05-22-2005
5.00
same
       

 05-19-2005
3.00
work on stiffeners

 05-19-2005
3.00
continued building stiffeners and deburring

 05-18-2005
4.00
Started work on elevators

 05-18-2005
4.00
building stiffeners per instructions

 05-16-2005
4.00
Finished except for trailing edge and rolling fron
     

 05-12-2005
3.00
Riveted rudder asy
     

 05-11-2005
4.00
Finished rudder skelton

 05-10-2005
3.00
continued work on this

 05-09-2005
4.00
Started rudder skeleton

 05-08-2005
4.00
Finished back riveting rudder

 05-06-2005
3.00
Started rudder asy
       

 04-27-2005
10.00
Finished vertical stabilizer
     

 04-22-2005
8.00
Started vertical stabilizer
     

 04-21-2005
8.00
Finished Horizontal stabilizer
     

 04-19-2005
3.00
continued same

 04-17-2005
4.00
Riveted horizontal stabilizer
       

 04-14-2005
3.00
prepared horizontal parts for asy
       

 04-08-2005
12.00
completed same

 04-07-2005
3.00
Drilled Horizontal Stabilizer asy per instructions

 04-06-2005
4.00
Prepared ribs etc

 04-01-2005
6.00
Started front spar asy

 04-01-2005
2.00
Primed all parts
       

 03-30-2005
10.00
Started rear spar asy
     

 03-01-2005
1.00
Purchased empennage kit
Details

 02-01-2005
1.00
The big decision
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.