KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE
' style=
Date:  4-28-2008
Number of Hours:  14.00
Manual Reference:  
Brief Description:  

4/28 THRU 5/3 WORK ON SPINNER. INSTALLED PROP AND TIGHTENED DOWN WITH PLATES ON MEASURED AND CUT OUT OPENINGS FOR BLADES DRILLED AND INSTALLED NUT PLATES ETC AFTER I CHECKED FOR CENTER ON THE SPINNER. FABRICATED THE BACK PLATES OUT OF (.063 ALUMINUM) IN BACK OF SPINNER DRILLED AND INSTALLED NUT PLATES
' style=

CHECKING FOR CENTER

CHECKING FOR CENTER

' style=




' style=

SOME SCREWS IN

SOME SCREWS IN

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.