KitLog pro

Powered By Kitlog Pro v2.0

ROBERT'S WEB SITE

Builder:
Robert Eggleston
Location:
Loveland, Colorado - USA
Aircraft:
Vans Aircraft - RV7
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
3191 Hours

Welcome to my Experimental Aircraft Web Site.

Recent Activity
 Date Hours Work Log Summary Details
 09-09-2021
2.0
Wired Fuel Flow 3 Wire And Connectors

 08-06-2021
4.0
Adding Spade Connectors And 27K Resiters Starter S
     

 08-05-2021
4.0
Master /starter SoleoidK-1,P-3, P-1

 08-04-2021
5.0
Installed Wires For VAL/Com

 08-03-2021
4.0
Wiring Master Relay And Starter Ignetion Switch

 08-02-2021
6.0
Drilled Hole's For EIS And Other Devices In Forwal

 08-01-2021
5.0
Work On Val/-Com And Val/Nav, GTR-200

 07-20-2021
4.0
J-3 L Mag And J-4 R Mag To Starter Switch

 07-01-2021
4.0
Wiring Of Altenator And Mag
       

 06-30-2021
3.0
Work On Mag L/R Wiring
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.