KitLog pro

Powered By Kitlog Pro v2.0

Daytons Web site
107 Logs Found 
 Date
Hours
Work Log Summary

Details

 12-24-2006
2.0
Inside photo's
Details
       

 12-24-2006
2.0
Finished
Details
       

 12-13-2006
3.0
Airworthyness
Details
       

 12-11-2006
3.0
Weight and Balance
Details

 12-11-2006
2.0
Small Details
Details
       

 12-10-2006
2.0
Graphics
Details
       

 12-03-2006
2.0
Engine start
Details
       

 12-02-2006
8.0
Engine start prep
Details

 11-26-2006
8.0
Finish painting
Details
       

 11-24-2006
8.0
Painting
Details
       

 09-27-2006
3.0
Oil cooler lines
Details
       

 09-10-2006
4.0
Baffle seals
Details
     

 09-02-2006
4.0
Inter cylinder baffles
Details
       

 09-01-2006
2.0
Oil Cooler
Details
       

 08-28-2006
5.0
Baffle fit
Details
       

 08-27-2006
40.0
Painting
Details
       

 08-27-2006
12.0
Baffells
Details
       

 07-19-2006
40.0
Painting
Details

 05-28-2006
6.0
Pinholes
Details
       

 04-28-2006
3.0
Cowl to spinner build up
Details
       

 04-23-2006
2.0
Cowl to spinner build up
Details
       

 04-23-2006
6.0
Air box
Details
       

 04-18-2006
4.0
Air box
Details
       

 04-16-2006
4.0
Install cowl cheeks
Details
       

 04-03-2006
3.0
Re-Build Left Elevator
Details

 03-28-2006
3.0
Re-Build Left Elevator
Details
       

 03-24-2006
2.0
Re-Build Left Elevator
Details
     

 03-21-2006
2.0
Re- Build Left Elevator
Details
       

 03-19-2006
3.0
Re- Build Left Elevator
Details
       

 01-20-2006
15.0
Intersection fairings on the Wheel Pants
Details
       

 12-31-2005
12.0
Finish cowl
Details
       

 12-14-2005
6.0
Installing cowl
Details
       

 12-05-2005
8.0
Installing cowl
Details
       

 11-27-2005
6.0
Cowl Hinges
Details
       

 11-19-2005
4.0
Cowl trimming
Details
       

 11-10-2005
2.0
Cowl Trimming
Details

 11-09-2005
2.0
Cowl Trimming
Details

 11-01-2005
1.0
Start Cowl
Details
       

 10-29-2005
8.0
Finish starter wire
Details

 10-29-2005
4.0
Finish engine installation
Details
       

 10-15-2005
6.0
Finish engine wire
Details
       

 10-09-2005
8.0
Gascolator mount
Details
     

 10-02-2005
1.0
Mixture cable
Details

 10-01-2005
5.0
Install engine
Details
       

 09-18-2005
5.0
Installing Wing tips
Details

 08-14-2005
5.0
Installing wings
Details
 

 08-05-2005
2.0
Installing wings
Details
       

 08-04-2005
5.0
Installing wings
Details
       

 08-04-2005
3.0
Installing wings
Details
       

 08-03-2005
40.0
Finish gear leg fairings and wheel pants
Details

 05-22-2005
5.0
Canopy fairing
Details
       

 05-21-2005
5.0
Aft canopy skin
Details
       

 05-03-2005
25.0
Canopy skins
Details
       

 05-03-2005
5.0
Canopy skins
Details
       

 04-11-2005
5.0
Canopy Drilling
Details
       

 03-31-2005
5.0
Cutting Canopy
Details
       

 03-31-2005
5.0
Canopy bow
Details
       

 03-20-2005
5.0
Canopy support system
Details
       

 03-18-2005
5.0
Canopy forward skin
Details
       

 03-14-2005
40.0
Canopy frame
Details
       

 01-15-2005
10.0
Empennage Fairing
Details

 12-12-2004
5.0
Empennage Fairing
Details
       

 12-11-2004
5.0
Empennage fairing
Details
       

 11-06-2004
20.0
Wiring
Details
       

 11-06-2004
20.0
More wiring
       

 11-06-2004
20.0
More wiring
       

 07-18-2004
20.0
Rear upper skin
Details
       

 06-29-2004
20.0
Rudder cables
Details
       

 06-07-2004
20.0
Throttle quadrants
Details
       

 06-07-2004
20.0
Roll cage
Details
       

 05-24-2004
8.0
Install cockpit rails
Details
       

 05-03-2004
20.0
Fishiishing details
Details
       

 04-29-2004
20.0
Rivet sides
Details
       

 04-25-2004
20.0
Skinning the fuselage frame
Details
       

 03-01-2004
20.0
Building the fuselage frame
Details
       

 12-23-2003
30.0
Starting fuselage
Details
       

 11-07-2002
25.0
Building Flaps
Details

 10-21-2002
25.0
Started Ailerons
Details

 10-20-2002
6.0
Finish fuel tanks
Details

 10-15-2002
3.0
Fuel tanks
Details

 09-27-2002
3.0
Riveting top skins
Details

 09-18-2002
10.0
Riveting leading edge
Details

 08-08-2002
25.0
Start fuel tanks
Details

 06-21-2002
5.0
Wing structure prep.
Details

 06-01-2002
15.0
Nose rib assembly
Details

 05-15-2002
10.0
Aligning wing assembly
Details

 05-11-2002
4.0
Bell crank
Details
       

 05-10-2002
10.0
Mount wing
Details
       

 04-26-2002
6.0
Drilling ribs
Details

 04-25-2002
8.0
Rib prep.
Details

 04-20-2002
10.0
Rear spar assembly
Details

 04-15-2002
6.0
F404 bulkhead assembly
Details

 04-12-2002
6.0
Spar assembly
Details

 04-08-2002
15.0
Spar prep.
Details

 05-03-2000
5.0
Elevator Trim Tab
Details
       

 05-01-2000
30.0
Elevators
Details
       

 04-01-2000
25.0
Starting Rudder
Details

 03-05-2000
10.0
Riveting Vertical Stab
Details
       

 03-04-2000
5.0
Vertical Stab Frame
Details
     

 03-03-2000
10.0
Assembling Vertical Stab
Details
     

 03-02-2000
5.0
Vertical Spar
Details

 03-01-2000
10.0
Starting Vertical Stab.
Details
     

 02-16-2000
25.0
Skinning Horizontal
Details
       

 02-13-2000
10.0
Horazontal Spar
Details

 02-12-2000
10.0
Horazontal Spar
Details
     

 02-10-2000
10.0
Wing Jig
Details
     

 12-04-1999
24.0
Trip to Van's
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.