KitLog pro

Powered By Kitlog Pro v2.0

Daytons Web site
' style=
Date:  8-8-2002
Number of Hours:  25.00
Manual Reference:  Sec 7
Brief Description:  Start fuel tanks

Chapter 7 Wings Date: 8/8//02 I started to build the fuel tanks. The process is the same as the wings. I installed the nose ribs on the rear baffle. I aligned the skins with the leading edge skins using straps and clamps. I used the same technique to align and drill the ribs. I drilled for all the nut plates. After all of this is done I disassembled all the parts, de-burr, dimpled and primed all the parts. Re-assembled and checked for plumb. There is a pattern here. Put it together, Take it apart, Put it together and Take it apart. No images available
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.