KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
Work Logs Found: 106
Category Work Time: 545 Hours
 Date
Hours
Work Log Summary

Details

 03-13-2020
4.25
Installed Top Baggage Bulkhead. Fire Ext.
Details

 03-11-2020
6.00
Installed Front Seats & Lower Baggage Bulkhead
Details

 03-09-2020
5.25
Reinstalled Covers, Console, & Fuel Selector
Details

 03-05-2020
6.25
Installed covers & console. Changed Fuel Valve Po
Details

 03-04-2020
3.75
Tested For Brake Leaks & Reinstalled Seat Rails
Details

 01-08-2020
5.00
Install Left Door Seal
Details

 01-07-2020
4.25
Cut Mats, Installed Covers, "Experimental" Label I
Details

 01-06-2020
6.50
Installed Inside Access Covers
Details

 02-12-2019
6.00
Tunnel Access Panel, Control Panel Prep
Details
       

 02-11-2019
5.25
Tunnel Access Plate Install
Details

 02-08-2019
6.75
Tunnel Side Access Install
Details

 06-22-2017
4.50
Prep for Gluing Doors
Details

 06-21-2017
6.25
Secure Cabin Top at Door Openings
Details

 06-20-2017
7.25
Installing Cabin Top
Details

 06-15-2017
6.50
Final Prep for Cabin Top Attachment
Details

 06-14-2017
7.50
Firewall Riveting & Cowl Hinges
Details

 06-13-2017
4.00
Forward Fuselage Top Assembly
Details

 06-12-2017
7.50
Prep For Closing Fuselage
Details

 06-07-2017
1.50
Cleaned Up From Internal Painting
Details

 06-06-2017
2.00
Interior Painting
Details

 05-31-2017
1.50
Interior Painting
Details

 05-30-2017
5.50
Interior Painting
Details

 05-26-2017
0.75
Interior Painting
Details

 05-25-2017
1.50
Interior Painting
Details

 05-24-2017
1.00
Interior Painting
Details

 05-23-2017
2.00
Interior Painting
Details

 05-19-2017
1.25
Interior Painting
Details

 05-18-2017
2.00
Interior Painting
Details

 05-17-2017
2.00
Interior Painting
Details

 05-09-2017
1.25
Painting Canopy
Details

 05-08-2017
1.75
Painting Canopy Inside
Details

 05-01-2017
4.25
Painting Fiberglass Canopy Interior
Details
       

 04-27-2017
3.00
Cut Opening for USB Power Units & Painted the Pane
Details

 04-26-2017
1.50
Painting Interior Panels
Details

 04-25-2017
1.75
Painting Cover Panels
Details

 04-24-2017
1.50
Painting Cover Panels
Details

 04-21-2017
1.75
Painting Cover Panels
Details

 04-20-2017
2.50
Painted Interior Covers
Details

 04-19-2017
3.50
Interior Covers Painting
Details

 04-14-2017
3.25
Interior Painting Prep
Details

 04-13-2017
3.00
Primed Inside of Cabin Top
Details

 04-13-2017
3.50
Fabricated Right Side Wire Cover
Details

 03-18-2017
2.75
Riviting Hard To Reach Locations
Details

 03-16-2017
4.00
Continued Smoothing Cabin Top
Details

 03-14-2017
5.00
Smoothing Inside Cabin Top
Details

 03-01-2017
5.00
Cabin Top Finish & Avionics Planning
Details

 02-28-2017
4.00
Primed Inside Cabin Top
Details

 02-23-2017
7.00
Cabin Top Prep; Oil Cooler Box
Details

 02-22-2017
7.75
Primed Parts, Prepared for Wiring
Details

 02-20-2017
5.00
Prepared Cabin Top for Riveting
Details

 02-16-2017
8.00
Plexiglass Trimming; Cabin Top Drilling
Details

 02-10-2017
2.00
Practiced Plexiglass Cutting
Details

 02-10-2017
1.50
Cabin Top Vertical Support Post
Details

 02-09-2017
8.00
Drilling Cabin Top
Details
       

 02-07-2017
7.75
Prep for Electrical, A/C Prep
Details

 02-02-2017
6.25
Wiring Prep & Fiberglass Overhead Console
Details

 02-01-2017
5.25
Wiring for Tail Light
Details

 01-31-2017
7.00
Glued Overhead Console to Cabin Top
Details

 01-30-2017
5.75
Prepare Overhead Console
Details

 01-23-2017
7.30
Prepare Overhead Console for Gluing
Details

 01-17-2017
6.00
Cabin LIghts
Details

 01-16-2017
8.00
Antennas, Tail LIght, Bulkhead Repair
Details

 12-08-2016
3.50
Parking Brake Valve
Details
       

 11-29-2016
0.50
Installed the Fuel Flow Transmitter
Details

 11-27-2016
1.50
Rivet Fuel Flow Transmitter Bracket to Fuselage
Details

 11-09-2016
6.00
Cabin Overhead Lights
Details

 10-10-2016
5.00
FT-60 & Wing Walk
Details

 10-05-2016
7.00
Fabricated F1099 Wing Fairing Supports & Stiffener
Details

 10-04-2016
4.00
Began Fitting Overhead Console
Details

 10-03-2016
3.50
Fuel System
Details

 09-30-2016
3.00
Fitting Cabin Top
Details
       

 09-28-2016
8.00
Fitting Cabin Top
Details

 09-27-2016
5.50
Cabin Top Fitting
Details

 09-26-2016
6.00
Flap Actuator Assembly Install
Details
       

 09-23-2016
4.50
Elevator Control System Install
Details
       

 09-22-2016
7.00
Fuel Filter & Pump; Fiberglass Top Trim
Details
       

 09-21-2016
8.00
Fiberglass Top; Baggage Door
Details
       

 09-20-2016
8.75
Cutting Down Fiberglass Top; Installing Baggage Do
Details
       

 09-19-2016
8.25
Began Work on Fuselage Top
Details

 09-16-2016
6.25
Rear Seat Backs
Details
       

 09-15-2016
8.50
Flap Bushings; Cowl Attach Hinge Fabrication
Details

 09-14-2016
8.25
Flap System
Details

 09-12-2016
8.00
Control System
Details

 09-09-2016
7.00
Installed Rudder Pedals; Fabricated Elevator Push
Details
       

 09-08-2016
6.50
Static Port Tubing; Brake/Rudder Pedals
Details
       

 09-07-2016
8.50
Anti-Yaw Bracket and Static Air Tubing
Details

 09-06-2016
8.25
Fuel System
Details
       

 09-01-2016
8.25
Yaw Servo Mount, Brake Lines
Details
       

 08-31-2016
8.25
Baggage Door, Pitch Servo, Rear Seat Floor
Details

 08-29-2016
3.75
Baggage Corrugation Wear Blocks & Door
Details
     

 08-26-2016
5.50
Continued Baggage Area Work
Details

 08-25-2016
8.50
Baggage Area
Details

 08-24-2016
2.75
Install Steps & Prep For Floor Riveting
Details
       

 08-23-2016
6.50
Install Conduit in Fuselage
Details
       

 08-22-2016
6.25
Hinges and Floor for Baggage Area
Details

 08-19-2016
5.00
Rivet Fuselage to Tail Cone
Details
     

 08-18-2016
7.50
Disconnected Tail Cone and Prepared for Riveting
Details

 08-11-2016
8.00
Tail Cone Mating to Fuselage
Details

 08-10-2016
1.50
Initial Connection of Tail Cone to Fuselage
Details

 08-08-2016
8.00
Front Floor, Brake Lines, Wiring Holes
Details

 07-14-2016
7.00
Preparing for Priming
Details

 07-13-2016
7.00
Access Panels for Step Bolts
Details

 07-12-2016
8.00
Priming & Locating Access Hatch
Details

 07-11-2016
8.50
Continued QB Fuselage Work Against Plans
Details

 07-08-2016
6.00
Continued QB Fuselage Review Against Plans
Details

 07-07-2016
8.00
Began review of QB fuselage against plans
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.