KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  8-26-2016
Number of Hours:  5.50
Manual Reference:  Pages 33-9 & 10
Brief Description:  Continued Baggage Area Work

Removed baggage bulkhead corrugation and right baggage cover and deburred holes drilled yesterday.

Found that the nut plates had already been installed by the QB team in F-1034C - R. This would prevent riveting the nut plates to both the baggage cover and F-1034C-R together as called for in the plans. After considering just allowing the screws and nut plates to hole the forward end of the baggage cover, I decided that I would instead drill out all of the rivets holding the nut plates in so that the baggage cover could be installed per the drawings. Climbed into the baggage compartment and drilled them out.

Riveted the right baggage cover into place. Drilled for all the nut plates that hold the baggage corrugations, dimpled, and riveted them into place.

Began layout of the wear blocks and then quickly left the shop for home when heavy rains and thunder hit as the dogs are home alone and afraid of thunder.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.