KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  2-22-2017
Number of Hours:  7.75
Manual Reference:  
Brief Description:  Primed Parts, Prepared for Wiring

Prepared new aluminum parts received this week for primer, including forward wire cover, oil cooler support box, and a number of small brackets and guides for wiring. Sprayed them with primer.

Assembled the forward wire cover F-10110-L, drilled the holes for the cover and for electrical wiring as called out in OP37-5 & 6. Drilled one 3/4" hole in a similar location in F-1002-R on the right side.

Measured and sketched up what a forward wire cover would look like for the right side (e.g. F-10110-R if Van's made one). Will order material and fabricate one myself.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.