KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log

Builder:
David Macdonald
Location:
Sugar Land, TX - USA
Aircraft:
Vans Aircraft - RV-10
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - IO-540
Prop:
MT
Total Build Time:
3133 Hours

Welcome to my RV-10 experimental aircraft builders log.

I have started building my empennage with the help of the 8 day Empennage class at Synergy Air in Eugene, Oregon. This was an excellent way to get started, in order to be certain I am doing this right and to get the chance to try a variety of tools and techniques prior to ordering my tools.

I will be posting log pages and photos as I proceed with the build.

I am recently retired after a 41 year career as a Project Manager on major capital projects. Having retired, I now have the time to build the Van's RV-10 kit as a nearly full time job, allowing for completion in a reasonable amount of time.

Dave

Recent Activity
 Date Hours Work Log Summary Details
 03-20-2020
5.0
Removable Snorkle - Part 3
Details

 03-19-2020
3.0
Snorkle Removal Part 2
Details

 03-17-2020
3.3
Lower Cowl Snorkle Removal
Details

 03-13-2020
4.3
Installed Top Baggage Bulkhead. Fire Ext.
Details

 03-13-2020
2.0
Aircraft Review By Rich Jankowski
Details

 03-11-2020
6.0
Installed Front Seats & Lower Baggage Bulkhead
Details

 03-10-2020
5.0
Installed Fairings & Data Plate. Modified Seats
Details

 03-09-2020
5.3
Reinstalled Covers, Console, & Fuel Selector
Details

 03-05-2020
6.3
Installed Covers & Console. Changed Fuel Valve Po
Details

 03-04-2020
3.8
Tested For Brake Leaks & Reinstalled Seat Rails
Details










Copyright © 2001-2020 Matronics. All Rights Reserved.