KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log

Builder:
David Macdonald
Location:
Sugar Land, TX - USA
Aircraft:
Vans Aircraft - RV-10
Manufacturer:   
http://www.vansaircraft.com/
Engine:
Lycoming - IO-540
Prop:
MT
Total Build Time:
3005 Hours

Welcome to my RV-10 experimental aircraft builders log.

I have started building my empennage with the help of the 8 day Empennage class at Synergy Air in Eugene, Oregon. This was an excellent way to get started, in order to be certain I am doing this right and to get the chance to try a variety of tools and techniques prior to ordering my tools.

I will be posting log pages and photos as I proceed with the build.

I am recently retired after a 41 year career as a Project Manager on major capital projects. Having retired, I now have the time to build the Van's RV-10 kit as a nearly full time job, allowing for completion in a reasonable amount of time.

Dave

Recent Activity
 Date Hours Work Log Summary Details
 02-04-2020
4.0
Replaced Left Door Seal. Installed Wing Walk Tape
Details

 02-03-2020
3.0
Re-installed Rudder Trim. Removed Van's Left Door
Details

 01-30-2020
3.3
Weigh Airplane
Details

 01-29-2020
4.3
Preparing For Weighing
Details

 01-28-2020
4.5
Getting Ready To Weigh
Details

 01-16-2020
6.8
ELT Install, Cowl Support Bracket, Exhaust Pipes
Details

 01-15-2020
6.3
Mag Timing. Brake Bleeding
Details

 01-14-2020
8.0
Installed Wing Tips And Wing Lights
Details

 01-13-2020
8.3
Door Seals. Installed Flaps
Details

 01-10-2020
3.5
Installing Door Weather Seals
Details










Copyright © 2001-2020 Matronics. All Rights Reserved.