Dave's RV-10 Build Log
Work Logs Found: 603
Category Work Time: 3189 Hours
 Date
Hours
Work Log Summary

Details

 06-11-2020
2.00
Re-Install Cowl & Covers after A/C Charging
Details

 06-10-2020
1.00
Charge A/C System
Details

 06-09-2020
3.50
A/C Final Hookup (Continued)
Details

 06-08-2020
5.50
Final A/C Hook-up
Details

 05-26-2020
4.00
Oil Change & Service Bulletins
Details

 05-19-2020
1.50
Auto Pilot Ground Tests, Adjust Oil Press Alarm
Details

 05-13-2020
6.50
Installed Wheel Fairings
Details

 04-24-2020
3.00
Oil Door, Inspection Plate, Avionics Update
Details

 04-22-2020
5.25
Oil Door Latch
Details

 04-13-2020
4.50
Remedy Issues From First Flights
Details

 04-01-2020
6.00
First 3 Flights
Details

 03-30-2020
2.50
Revised Top Cowl Firewall Pin Clip
Details

 03-30-2020
2.50
Misc. Prep for First Flight
Details

 03-25-2020
3.75
Cowl Re-Fitting
Details

 03-23-2020
4.50
Modified Left Cooling Air Inlet Ramp
Details

 03-20-2020
5.00
Removable Snorkle - Part 3
Details

 03-19-2020
3.00
Snorkle Removal Part 2
Details

 03-17-2020
3.25
Lower Cowl Snorkle Removal
Details

 03-13-2020
4.25
Installed Top Baggage Bulkhead. Fire Ext.
Details

 03-13-2020
2.00
Aircraft Review by Rich Jankowski
Details

 03-11-2020
6.00
Installed Front Seats & Lower Baggage Bulkhead
Details

 03-10-2020
5.00
Installed Fairings & Data Plate. Modified Seats
Details

 03-09-2020
5.25
Reinstalled Covers, Console, & Fuel Selector
Details

 03-05-2020
6.25
Installed covers & console. Changed Fuel Valve Po
Details

 03-04-2020
3.75
Tested For Brake Leaks & Reinstalled Seat Rails
Details

 03-03-2020
4.00
Fixed Brake Fluid Leak. Adjusted Right Aileron
Details

 02-26-2020
4.00
Airworthiness Inspection Corrections
Details

 02-24-2020
4.00
DAR Inspection
Details

 02-23-2020
8.00
Final Prep for DAR Inspection
Details

 02-22-2020
7.75
Install Inlet Seals, Seat Belts; RTV Baffle Sealin
Details

 02-21-2020
6.75
Trouble Shoot & Calibrate. Seal Firewall
Details

 02-20-2020
4.25
Installed Labels, Entered Set Points and Ranges
Details

 02-19-2020
6.50
Engine Start, Calibrated AHARS & Magnetometer
Details

 02-18-2020
6.00
Engine Trouble Shooting
Details

 02-17-2020
6.00
Trouble Shooting Engine Start Problem
Details

 02-16-2020
4.00
Avionics Trouble Shooting
Details

 02-15-2020
3.25
Unsuccessful First Engine Start
Details

 02-14-2020
3.50
Purged Fuel Injectors
Details

 02-13-2020
4.00
Completed Fuel Flow Tests
Details

 02-12-2020
5.00
Configuring I/O Channels. Diagnosing Elev. Trim P
Details

 02-11-2020
4.25
Updated Avionics Software. Started Calibration.
Details

 02-10-2020
3.00
Removed Van's Weatherstripping from Right Door
Details

 02-04-2020
4.00
Replaced Left Door Seal. Installed Wing Walk Tape
Details

 02-03-2020
3.00
Re-installed Rudder Trim. Removed Van's Left Door
Details

 01-30-2020
3.25
Weigh Airplane
Details

 01-29-2020
4.25
Preparing for Weighing
Details

 01-28-2020
4.50
Getting Ready to Weigh
Details

 01-16-2020
6.75
ELT Install, Cowl Support Bracket, Exhaust Pipes
Details

 01-15-2020
6.25
Mag Timing. Brake Bleeding
Details

 01-14-2020
8.00
Installed Wing Tips and Wing Lights
Details

 01-13-2020
8.25
Door Seals. Installed Flaps
Details

 01-10-2020
3.50
Installing Door Weather Seals
Details

 01-10-2020
4.00
Cleaned oil screen, lower plugs, refilled engine o
Details

 01-09-2020
6.25
Rudder Trim, Door Seal, Preservative Oil Drain
Details

 01-08-2020
5.00
Install Left Door Seal
Details

 01-07-2020
4.25
Cut Mats, Installed Covers, "Experimental" Label I
Details

 01-06-2020
6.50
Installed Inside Access Covers
Details

 12-16-2019
5.50
Fuel Level Wiring, Fuel & Vent Lines, Lower Wing R
Details

 12-13-2019
7.25
Installed Pitot/AOA and Fuel Level Transmitters
Details

 12-12-2019
3.00
Modify Right Front Seat Adjuster
Details

 12-12-2019
3.25
Installed GTP 59 OAT. Begin fitting Pitot Tube
Details

 12-11-2019
7.25
Fixed Aileron Trim, Installed Seat Nutplates & Sea
Details

 12-10-2019
6.50
Install GMU 11 & Stick Grips
Details

 12-09-2019
5.50
Nameplate, Seat Floors, Aileron Trim Servo
Details

 11-26-2019
3.25
Updated Drawings to As Built
Details

 10-25-2019
6.50
Install Wing Root Fairing Supports
Details

 10-24-2019
7.00
Wing Fairing Nutplates, Tank Attach Bracket
Details

 10-23-2019
7.00
Cut Left Stick, Installed Antennas & Baggage Seal
Details

 10-22-2019
7.75
Fuel Caps, Heater Cable Safety Wire, Stick Cutting
Details

 10-18-2019
7.00
Upper Wing Root Fairing
Details

 10-17-2019
7.50
Wing Root Fairings
Details

 10-16-2019
7.00
Aileron Rigging, Attached Fuel Lines
Details

 10-15-2019
7.50
Installed Roll Servo and Wings
Details

 10-14-2019
6.75
Install Yaw Servo, F-1025 Rear Seat Side Covers
Details

 10-11-2019
5.50
Installed Pitch Servo for Autopilot
Details

 10-10-2019
6.50
Install Rudder Lower Fairing & Empennage Fairing
Details

 10-09-2019
7.00
Wing Root Fairings, Fuel Strainers
Details

 10-08-2019
6.50
Installed Rudder Cable Fairings. Wing Root Fairin
Details

 10-07-2019
7.50
Empennage Fairing
Details

 10-04-2019
6.75
Fairing Nutplates Installation
Details

 10-03-2019
7.75
Drill & Trim Stab Fairing, Drilling for Nutplates
Details

 10-02-2019
6.75
Re-attached & Adj. Trim Tabs, Fairing Fitting
Details

 10-01-2019
4.25
Cut Shelves and Cleaned Out Richmond Shop
Details

 09-30-2019
6.00
Re-Install Rudder & Elev. Trim Cables
Details

 09-26-2019
7.25
Reinstall Horiz & Vert. Stab, Elev., Nav Antenna
Details

 09-25-2019
5.25
Shop Unpacked; Reinstalled Gear Pants Brackets
Details

 09-24-2019
4.50
Moved Shelves to Airport
Details

 09-23-2019
8.50
Moved Shop to KARM Airport
Details

 09-20-2019
5.00
Packing Shop for Move to Airport
Details

 09-19-2019
2.00
Packing Shop for Move to Airport
Details

 09-17-2019
5.50
Packing Shop for Move to Airport
Details

 09-16-2019
3.50
Moved Fuselage to Wharton Airport KARM
Details

 09-13-2019
6.00
Right Seat Rails, Front Ovhd Lights, Heat Shld
Details

 09-12-2019
4.00
Front Seats
Details

 09-11-2019
7.75
Long SCAT for Heater, Installed Left Seat Rails.
Details

 09-10-2019
5.25
Left Heat Inlet, G5 Install, Vent Fan Trim Rings
Details

 09-09-2019
7.50
Reinstall Panels, Wired Sure Start, Install Heater
Details

 09-06-2019
6.50
Installed GTP 59 ; Installed Throttle Quadrant
Details

 09-05-2019
7.75
Install Right Wing Connector, Add Lighting Pot Gro
Details

 08-26-2019
7.75
Complete Brake & Alt Air Cables, Install Right Win
Details

 08-23-2019
4.00
Parking Break Cable & Paint Inside Lower Cowl
Details

 08-21-2019
7.00
Re-Installed Heater Controls Mount Sure Start
Details

 08-20-2019
6.75
Seat Belt Bolts, Side Console Labels
Details

 08-12-2019
5.00
Completed G5 Wiring, Epoxy Sealed Lower Cowl
Details

 08-09-2019
7.00
G5 Mounting & Wiring
Details

 08-08-2019
6.25
G5 Bracket Design, Glare Shield Cover
Details

 08-07-2019
5.25
GMU Mount & Connectors for GMU and GSA 28
Details

 08-06-2019
7.25
Fix Overhead Lights, Seat Heaters; Worked on G5 Mo
Details

 08-05-2019
8.00
Overhead Cabin Lights Wiring
Details

 08-02-2019
7.00
Instrument Lights, Overhead Lights
Details

 08-01-2019
3.50
Software Updates, Com Tests, Config Checks
Details

 07-19-2019
3.00
Installed Stick Switch Connectors
Details

 07-18-2019
6.00
Trouble Shoot Seat Heat & Switch Lights
Details

 07-17-2019
7.25
CAN Bus Trouble Shooting & Repair
Details

 07-16-2019
7.00
CAN Bus Trouble Shooting
Details

 07-15-2019
7.25
Reviewing Config. Requirements
Details

 07-11-2019
7.25
CAN Bus Trouble Shooting
Details

 07-10-2019
7.00
Installed GDUs & GTN. First Power to Panel
Details

 07-09-2019
7.25
Center Breakers, Close Center Panel, Replace Coax
Details

 07-08-2019
5.50
Closed Right Section Panel, Started Center Breaker
Details

 07-05-2019
7.75
Right Side Breakers & Avionics Tray
Details

 07-02-2019
7.50
Cut Right Avionics Tray, Removed heater cables, wi
Details

 07-01-2019
8.00
Coax Connections, Stick Grip Wires, Right Air Vent
Details

 06-28-2019
7.25
Transponder Antenna. Heater SCAT tubing Install
Details

 06-26-2019
7.00
Right Side Panel Wiring
Details

 06-25-2019
7.25
Right Panel: GAD 27 & GEA 24
Details

 06-24-2019
7.75
Left Side Completion, GAD 27 Connectors
Details

 06-21-2019
7.25
Left Panel Finalization
Details

 06-20-2019
7.25
ELT Wiring, Left Tray Modification
Details

 06-19-2019
7.00
ELT Install, Coax Connectors, Revised GTR 20 Locat
Details

 06-18-2019
7.75
Rudder Trim, Heater Cables
Details

 06-17-2019
7.75
Fitting Center Side Panels to Control Panel
Details

 06-14-2019
2.25
Control Panel Center Console Sides
Details

 06-13-2019
7.25
Continued Left Panel Wiring Work
Details

 06-12-2019
7.25
GMA 245 Wiring Completed, Alternator and Battery C
Details

 06-11-2019
7.25
Rear Headset Jacks, Audio Wiring Prep.
Details

 06-10-2019
4.25
Notched Sub-Panel for GTN 650
Details

 06-07-2019
7.50
Re-Installed LRU Cages and Installed Main Harness
Details

 06-06-2019
7.00
Mag Wiring & Seat Heaters
Details

 05-14-2019
5.50
Completed GEA 24 P243 Connector
Details

 05-13-2019
7.00
Began Panel Install, Completed P242 GEA 24
Details

 05-10-2019
2.00
Re-install Cabin Brace
Details

 05-10-2019
3.25
Alternator Connections, Static Connection
Details

 05-09-2019
4.75
Primary Alternator, Solidnoid Diodes, Avionics Fan
Details

 05-07-2019
4.75
Large AWG Wire Connections; Seat Heater Wiring
Details

 05-06-2019
1.00
Large AWG Crimper Test, Painted Cabin Brace
Details

 05-03-2019
6.50
Routed Engine Sensor Wires
Details

 05-02-2019
6.00
Engine Sensors
Details

 05-01-2019
7.00
Glare Shield Cover Sides, EGT/CHT Wiring
Details

 04-30-2019
5.00
Glare Shield Cover; EGT/CHT Wire
Details

 04-29-2019
4.50
Began Install of Glare Shield Cover; EGT/CHT Wire
Details

 04-26-2019
4.50
Completed G5 Case Frame
Details

 04-25-2019
7.50
Creating Case for G5 Mounting
Details

 04-24-2019
7.00
CAN Bus Connections, Ign Switch Wiring
Details

 04-23-2019
6.50
Switch & Breaker Wiring; CAN-Bus Wiring
Details

 04-22-2019
6.25
Power & Switch Wiring, Seat Heater Switches
Details

 04-19-2019
5.00
Wired Panel Lights; CO Detector and Switch LEDs
Details

 04-18-2019
5.00
Ground Blocks; Lighted PushButtons
Details

 04-17-2019
6.75
IBBS Connector; Breakers; Power Leads
Details

 04-16-2019
7.75
CO Det; IBBS
Details

 04-10-2019
6.25
GTR 20 and GTX 45R Wiring
Details

 04-09-2019
3.75
GAD 29; GSU 25 Wiring
Details

 04-08-2019
8.25
GAD 29; GEA 24 P241; GMC 305 Wiring
Details

 04-05-2019
7.25
GAD 27 - P271 Connector Wiring
Details

 04-04-2019
6.50
GMA 245 Wiring
Details

 04-03-2019
3.50
GMA 245 Wiring Started
Details

 04-02-2019
8.25
Completed Wiring for GTN 650
Details

 04-01-2019
7.50
GTN 650 Wiring
Details

 03-29-2019
4.75
MFD & PFD2 Wiring
Details

 03-28-2019
6.75
PFD-1 & MFD Wiring
Details

 03-27-2019
3.50
PFD-1 Wiring
Details

 03-26-2019
7.00
PFD-1 Wiring Harness Fabrication Begins
Details

 03-25-2019
4.25
Determine CAN Bus Order & Document
Details

 03-22-2019
6.00
Measure & Create Harness Layout Board
Details

 03-21-2019
4.50
Avionics Relay, Switches, Measured Sub-Panel
Details

 03-20-2019
1.50
Sketched Wire Bundle Routing Diagream with Distanc
Details

 03-20-2019
5.00
Installing Breakers & ELT Control Head
Details

 03-19-2019
2.50
Determininng Breakers Install & Req'd Crimp Connec
Details

 03-18-2019
1.50
Enlarging Panel Holes
Details

 03-15-2019
5.50
Preparing Panel for Wiring
Details

 03-14-2019
5.00
Completed Wiring Diagrams
Details

 03-13-2019
6.75
Added Wire Numbers to Wiring Diagrams
Details

 03-12-2019
7.00
Wiring Diagrams Refinement
Details

 03-11-2019
8.50
Wiring Diagrams Development/Refinement
Details

 03-09-2019
1.50
Rivet Firewall Penetrations
Details

 03-08-2019
5.25
Installed & Wired Shunts, Wired Voltage Reg.
Details

 03-07-2019
6.00
Installed Voltage Regulators
Details

 03-06-2019
3.00
Reviewed & Marked-up Wiring Diagrams
Details

 03-05-2019
8.50
Revised Wiring Diagrams, Added A/C and Seat Heater
Details

 03-04-2019
5.50
Mounted IBBS, Prepared Firewall Holes
Details

 02-28-2019
5.50
Revised Electrical Diagrams, Added IBBS Page
Details

 02-27-2019
6.50
Mounted LRUs to Panel Trays
Details

 02-26-2019
7.75
Mounting Voltage Regulators, GSU 25, CO Detector
Details

 02-25-2019
6.50
Determining LRU Mounting Locations
Details

 02-22-2019
6.50
Mounting GTX 45R Transponder Rack
Details

 02-20-2019
7.25
Mounting GTN650 Cage to Panel
Details

 02-18-2019
6.00
Preparing Avionics Cage Mounting
Details

 02-15-2019
8.00
Panel Installation
Details
       

 02-14-2019
6.75
Power Distribution Diagrams
Details

 02-13-2019
4.50
Oil Door, AC Bump-Out, Center Console
Details
     

 02-12-2019
6.00
Tunnel Access Panel, Control Panel Prep
Details
       

 02-11-2019
5.25
Tunnel Access Plate Install
Details

 02-08-2019
6.75
Tunnel Side Access Install
Details

 02-06-2019
3.75
FWF A/C Hoses Installation
Details
       

 02-06-2019
2.50
Begin Fitting GTN 650 & Audio Panel to Aircraft
Details
       

 02-05-2019
5.00
Avionics Inventory, Fuel Valve Extension
Details

 02-04-2019
5.00
Ground Straps, Throttle Quadrant, Fiberglass Bump-
Details

 02-01-2019
6.50
Fitting the Central Console
Details

 01-31-2019
3.75
Fitting the Center Console
Details

 01-30-2019
5.25
Review & Check Wiring Diagrams
Details

 01-29-2019
4.75
Developing Wiring Diagrams
Details

 01-28-2019
5.75
Wiring for Starter, Alternator, & Compressor
Details

 01-25-2019
5.75
Cushion Clamps for Engine Plug Wires, Grounding
Details

 01-24-2019
3.00
Seat Heater Wiring
Details

 01-23-2019
7.00
Avionics LRU Wiring Diagrams
Details

 01-22-2019
4.75
Propeller Install, Seat Heater Wires, Cowl Bumpout
Details

 01-21-2019
5.75
Cowl, Exhaust, Seat Heaters
Details

 01-18-2019
5.50
Oil Door, Cowl Bump-outs, A/C Hose
Details

 01-17-2019
5.00
Attaching Rear Seat Backs
Details
     

 01-16-2019
2.75
Lower Cowl Bump-Outs
Details
     

 01-15-2019
4.50
Wiring Diagrams
Details

 01-14-2019
4.75
Engine Cowl Fiberglass Work
Details
       

 01-11-2019
5.00
Cowl Modifications & Heated Seats
Details
     

 01-10-2019
2.00
Oil Door and Cowl Modification
Details

 01-09-2019
5.25
Oil Door Hinge and Latch
Details
     

 01-08-2019
3.25
Installed EGT Probes
Details
     

 01-07-2019
3.75
Installed Mufflers/Heat Muffs
Details
       

 10-28-2018
4.50
Avionics Wiring Diagrams
Details

 10-23-2018
7.00
Electrical Diagrams Creation
Details

 10-22-2018
5.00
Continued Development of Electrical Diagrams
Details

 10-03-2018
3.50
Avionics Wiring Diagrams
Details

 09-15-2018
3.00
Avionics Wiring Diagrams
Details

 09-14-2018
5.00
Avionics Wiring Diagrams
Details

 06-14-2018
5.50
Continued Development of Avionics Wiring Diagrams
Details

 06-13-2018
2.50
Avionics Wiring Diagrams
Details

 06-12-2018
4.00
Avionics Wiring Diagrams
Details

 06-11-2018
3.00
Avionics Wiring Diagrams
Details

 06-07-2018
2.00
Avionics Wiring Diagrams
Details

 06-06-2018
5.00
Avionics Wiring Diagrams Creation
Details

 05-31-2018
3.00
Develop Draft LRU Pages in PowerPoint
Details

 05-30-2018
2.00
Organize Previous Avionics Work in Preparation
Details

 03-25-2018
0.00
Fractured Foot - Work Will Be Delayed
Details

 03-23-2018
6.75
FAB Install & Exhaust Headers
Details
       

 03-22-2018
7.75
Filtered Air Box Baffling
Details

 03-21-2018
1.75
Air Box Inlet Work
Details

 03-20-2018
6.00
Engine Control Cables Installed
Details

 03-19-2018
1.75
Filtered Air Box Inlet Fiberglass Fab
Details

 03-06-2018
1.50
Cowl to Filtered Air Box Fab
Details

 03-05-2018
3.00
Cowl To Filtered Air Box
Details

 03-02-2018
4.75
Air Box to Cowl Connection Fab
Details

 03-01-2018
4.00
Filtered Air Box
Details

 02-28-2018
7.25
Filtered Air Box Creation
Details

 02-27-2018
7.00
Filtered Air Box
Details

 02-26-2018
4.00
Filtered Air Box
Details

 02-23-2018
7.00
Determing Control Cable Lengths & Routings
Details

 02-22-2018
7.50
Fitting Control Panel & Center Console
Details

 02-21-2018
7.25
Started Fitting Control Panel to Aircraft
Details

 02-20-2018
6.75
Throttle Body Install & Cowl Pin Cover Plates
Details

 02-19-2018
7.00
Cowl Pin Covers
Details

 02-16-2018
7.50
Rivet Baffle Seals; Installed Oil Cooler & CHT Pro
Details

 02-15-2018
7.25
Fabricating Baffle Seals
Details

 02-14-2018
6.00
Installing Baffle Seals
Details

 02-13-2018
8.00
Baffle Tension Rods & Spark Plug Top Wires
Details

 02-12-2018
7.25
Finished Trimming Baffles
Details

 02-09-2018
5.50
Trimming Baffles
Details

 02-08-2018
7.25
Baffle Trimming
Details

 02-07-2018
7.25
Front Inlet Ramp Baffles - Continued
Details

 02-06-2018
1.25
Unpacked & Inventoried Panel & Parts
Details

 02-06-2018
6.75
Left Inlet Ramp Baffles
Details

 02-05-2018
8.00
Left Inlet Ramp Fitting and Front Baffles
Details

 02-02-2018
7.00
Bottom Cowl & Baffles
Details

 02-01-2018
7.25
Bottom Cowl Louvers
Details

 01-31-2018
6.50
Cowls
Details

 01-30-2018
6.50
Top Cowl Side Hinges
Details

 01-29-2018
5.25
Bottom Cowl Side Hinges Riveted. Oil Door Cut
Details

 01-26-2018
2.00
Bottom Cowl Side Hinges
Details

 01-25-2018
7.00
Cowl Edges
Details

 01-23-2018
7.50
Cowl - Riveting Hinges
Details

 01-22-2018
7.25
Cowl Attachment - New Hinges
Details

 01-19-2018
2.50
Electrical Planning
Details

 01-16-2018
3.50
Updated Breaker List & Discussed with Aerotronics
Details

 01-15-2018
4.50
Confirming Electrical System Breaker Sizes
Details

 01-11-2018
7.00
Electrical Drawings Development
Details

 01-10-2018
2.50
Sanded Epoxy Filled Holes in Cowls
Details

 01-09-2018
5.75
Cowl Fitting - Hinge Drilling Mistake
Details

 01-08-2018
7.00
Fitting Cowl & Drilling for Hinge Riveting
Details

 01-05-2018
6.75
Cowl Fitting
Details

 01-04-2018
3.00
Fitting Cowl
Details

 01-03-2018
6.50
Fitting Bottom Cowl
Details

 01-03-2018
1.50
Final Review of Panel CAD Drawing
Details

 01-02-2018
5.50
Trim Top Cowl
Details

 12-12-2017
1.00
Panel Layout
Details

 12-12-2017
3.75
Left Intake Baffle Modification for Air Conditione
Details

 12-11-2017
3.75
Air box Alternate Air Door and Drain Tube
Details

 12-01-2017
6.00
Air Box Fabrication
Details

 11-30-2017
1.00
Compressor Final Fitting
Details

 11-30-2017
5.00
A/C Compressor Mounting
Details

 11-29-2017
3.50
Door Switch Wiring
Details

 11-29-2017
3.00
A/C Compressor Installation Started
Details

 11-28-2017
6.50
Engine Baffle Prep and Cowling Prep. Door Switch
Details

 11-22-2017
4.00
Baffles Install & Cowl Trim
Details

 11-21-2017
7.25
Baffles Fabrication & Installation
Details

 11-20-2017
2.00
Panel Design
Details

 11-20-2017
5.50
Engine Baffles
Details

 11-17-2017
7.25
Engine Baffles Fabrication
Details

 11-16-2017
7.25
Alternator Install & Baffles
Details

 11-15-2017
6.50
Engine Installation
Details

 11-13-2017
6.00
Prep Rear of Engine For Installation
Details

 11-09-2017
3.00
Panel Planning
Details

 11-08-2017
6.00
Install Backup Alternator onto Engine
Details

 11-07-2017
1.50
Lowered Onto Gear
Details

 11-07-2017
5.00
Began Preping Engine for Mounting
Details

 11-06-2017
5.50
Install Interface Fairings on Main Gear
Details

 11-01-2017
6.50
Nose Gear Fairing
Details

 10-31-2017
4.75
Nose Gear Fairing
Details

 10-30-2017
4.75
Gear Leg Fairings
Details

 10-20-2017
4.50
Main Gear Leg Fairings
Details

 10-19-2017
7.50
Nosewheel Fairing & Gear Leg Fairing
Details

 10-18-2017
5.50
Nose Wheel Fairing
Details

 10-17-2017
5.50
Wheel Fairings
Details

 10-16-2017
8.00
Wheel Fairings
Details

 10-13-2017
5.00
Wheel Fairings
Details

 10-12-2017
6.50
Wheel Fairings
Details

 10-11-2017
7.50
Wheel Fairings
Details

 10-10-2017
7.25
Wheel Fairings
Details

 10-09-2017
6.00
Wheel Fairings
Details

 10-06-2017
5.50
Wheels & Brakes
Details

 10-06-2017
2.00
Nose Gear Assembly
Details

 10-05-2017
1.50
Raised Fuselage Onto Work bench
Details

 10-05-2017
2.00
Installed Landing Gear Legs
Details

 10-04-2017
3.75
Finished Windscreen & Prepared for Fuselage Liftin
Details

 10-03-2017
4.50
Finished Windscreen Fairing
Details

 10-02-2017
4.75
Windscreen Fairing; Window Edge Filler
Details

 09-29-2017
2.50
Epoxy Finish Coat on Windscreen Fairing
Details

 09-28-2017
3.00
Windscreen Fairing Final Shape & Top Coat
Details

 09-27-2017
2.00
4th Thin Layer of Epoxy-Micro on Windscreen Fairin
Details

 09-26-2017
1.75
Added 3rd Layer of Epoxy-Micro to Windscreen Fairi
Details

 09-25-2017
3.00
Second Epoxy/Micro Finishing Layer
Details

 09-22-2017
1.50
First Epoxy Micro Finish Coat on Windscreen Fairin
Details

 09-21-2017
2.00
Filled Door Fab Rivets; Added Fiberglass to Windsc
Details

 09-20-2017
1.50
Added Fiberglass Layers to Windscreen Fairing
Details

 09-19-2017
4.50
Windscreen Fairing; Repair Right Door Strut Mount
Details

 09-15-2017
5.00
Fiberglass Layers on Windscreen & Touch up Paintin
Details

 09-14-2017
2.00
Second Fiberglass Layer on Windscreen
Details

 09-13-2017
4.50
First Fiberglass Layer on Windscreen
Details

 09-12-2017
5.00
Prepared for Windscreen Base Faring Fabrication
Details

 09-11-2017
4.00
Corrected Windscreen Gluing Error
Details

 09-08-2017
8.25
Finalized Left Door Latch Installation
Details

 09-07-2017
7.75
Left Door Mounting
Details

 09-06-2017
7.00
Mounting Right Door
Details

 09-05-2017
7.25
Door Latch Tips & Door Gas Struts
Details

 08-23-2017
3.50
Glued Plexiglass
Details

 08-22-2017
6.25
Preparing for Gluing Plexiglass
Details

 08-21-2017
8.25
Install Door Latches
Details

 08-19-2017
0.75
Paint Touch-up Around Doors
Details

 08-18-2017
2.50
Touch Up Painting Around Doors
Details

 08-17-2017
1.75
Painting Doors
Details

 08-16-2017
1.00
Painting Interior Doors
Details

 08-15-2017
5.00
Prep Doors & Interior for Painting
Details

 08-14-2017
7.25
Prep Doors for Interior Paint
Details

 08-11-2017
3.00
Primed Inside of Doors
Details

 08-10-2017
5.50
Prep Doors for Painting; Prep Windscreen for Gluin
Details

 08-09-2017
7.00
Door Latches
Details

 08-08-2017
6.50
Nose Gear Wheel, Prop Storage, Door Latch Covers
Details

 08-07-2017
5.50
Cabin Doors, Interior touch up, Nose Gear
Details

 08-02-2017
5.00
Planning & Ordering Avionics Equipment
Details

 07-31-2017
4.50
Planning for Panel Avionics Order
Details

 07-31-2017
2.50
Door Latches
Details

 07-12-2017
5.50
Door Latches
Details

 07-11-2017
7.50
Door Latches
Details

 07-10-2017
4.75
Door Latch
Details

 07-06-2017
2.75
Door Latches
Details

 07-05-2017
7.00
Door Latches
Details

 07-03-2017
7.75
Engine Mount Installation; Door Handles
Details

 06-30-2017
1.75
Right Door Window Fitting
Details

 06-29-2017
7.50
Hang Door & Trim Door Window Plexiglass
Details

 06-28-2017
7.25
Door Fitting
Details

 06-27-2017
7.00
Trimming Doors
Details

 06-26-2017
6.75
Trimmed Doors
Details

 06-23-2017
2.50
Bonded Doors Together
Details

 06-22-2017
4.50
Prep for Gluing Doors
Details

 06-21-2017
6.25
Secure Cabin Top at Door Openings
Details

 06-20-2017
7.25
Installing Cabin Top
Details

 06-15-2017
6.50
Final Prep for Cabin Top Attachment
Details

 06-14-2017
7.50
Firewall Riveting & Cowl Hinges
Details

 06-13-2017
4.00
Forward Fuselage Top Assembly
Details

 06-12-2017
7.50
Prep For Closing Fuselage
Details

 06-09-2017
7.75
Tail Cone Wiring Harness
Details

 06-08-2017
2.00
Wiring diagrams Development
Details

 06-07-2017
5.00
Preparation for Tail Cone and Wing Wiring
Details

 06-07-2017
1.50
Cleaned Up From Internal Painting
Details

 06-06-2017
2.00
Interior Painting
Details

 06-01-2017
7.00
Creating Avionics Wiring Diagrams
Details

 05-31-2017
1.50
Interior Painting
Details

 05-30-2017
5.50
Interior Painting
Details

 05-26-2017
0.75
Interior Painting
Details

 05-25-2017
1.50
Interior Painting
Details

 05-24-2017
1.00
Interior Painting
Details

 05-23-2017
2.00
Interior Painting
Details

 05-19-2017
1.25
Interior Painting
Details

 05-18-2017
5.00
Inventory
Details

 05-18-2017
2.00
Interior Painting
Details

 05-17-2017
2.00
Interior Painting
Details

 05-09-2017
1.25
Painting Canopy
Details

 05-08-2017
1.75
Painting Canopy Inside
Details

 05-01-2017
4.25
Painting Fiberglass Canopy Interior
Details
       

 04-27-2017
3.00
Cut Opening for USB Power Units & Painted the Pane
Details

 04-26-2017
1.50
Painting Interior Panels
Details

 04-25-2017
1.75
Painting Cover Panels
Details

 04-24-2017
1.50
Painting Cover Panels
Details

 04-21-2017
1.75
Painting Cover Panels
Details

 04-20-2017
2.50
Painted Interior Covers
Details

 04-20-2017
3.00
Installled Headset Jack Recess Panels
Details

 04-19-2017
3.50
Interior Covers Painting
Details

 04-14-2017
3.25
Interior Painting Prep
Details

 04-13-2017
3.00
Primed Inside of Cabin Top
Details

 04-13-2017
3.50
Fabricated Right Side Wire Cover
Details

 04-12-2017
5.50
Lighting Molex Connectors
Details

 04-10-2017
5.25
Molex Connectors Installation
Details

 04-05-2017
5.75
Installed Molex Connectors to Trim Servos
Details

 04-04-2017
5.00
Flap Position Transmitter
Details

 03-31-2017
1.50
Coax Labels
Details

 03-29-2017
6.25
Installed Coax Antenna Connectors, Rung Out Wires
Details

 03-28-2017
7.00
Fiberglass Added R. Wingtip; Installed R. Seat Flo
Details

 03-27-2017
7.50
Right Wing Tip; Re-installed Left Rear Seat Floor
Details

 03-24-2017
6.75
Right Wing Tip Smoothing & Right Main Gear Prep.
Details

 03-22-2017
8.25
Continued Wing Tip Smoothing & Prep for Floor Rein
Details

 03-21-2017
7.00
Left Main Gear Preparation & Left Wingtip Smoothin
Details

 03-20-2017
1.00
Smooth Wing Tip Insert with Epoxy-Micro
Details

 03-20-2017
7.00
Fabricated Bracket for Flap Position Sensor & Pull
Details

 03-18-2017
2.75
Riviting Hard To Reach Locations
Details

 03-16-2017
4.00
Continued Smoothing Cabin Top
Details

 03-14-2017
5.00
Smoothing Inside Cabin Top
Details

 03-13-2017
7.75
Avionics Wiring In Fuselage
Details

 03-10-2017
7.00
Labeling Wires and Terminating
Details

 03-09-2017
5.00
Prepare Wire Labels
Details

 03-09-2017
4.00
Developed Listing of Avionics Wires To Be Installe
Details

 03-07-2017
5.50
Terminated Mid-Fuselage Electrical Wires
Details

 03-07-2017
2.00
Fit Left Wing Tip Rib
Details

 03-06-2017
3.00
Power Wires Run To Mid Fuselage
Details

 03-06-2017
5.50
Left Wing Tip Mounting
Details

 03-03-2017
6.00
Completed Right Wing Tip, Started Left Wing Tip
Details

 03-02-2017
7.00
Right Wing Tip Fitting & Mounting
Details

 03-01-2017
5.00
Cabin Top Finish & Avionics Planning
Details

 02-28-2017
4.00
Primed Inside Cabin Top
Details

 02-28-2017
2.50
Installed Power Wiring - Tailcone to Rear Seats
Details

 02-28-2017
1.00
A/C Hose Completion in fuselage
Details

 02-27-2017
4.00
Wiring Installation - Power Wire To Tailcone
Details

 02-27-2017
3.25
A/C Hose Supports; Condenser Penetration Doublers
Details

 02-23-2017
7.00
Cabin Top Prep; Oil Cooler Box
Details

 02-22-2017
7.75
Primed Parts, Prepared for Wiring
Details

 02-20-2017
5.00
Prepared Cabin Top for Riveting
Details

 02-20-2017
2.00
Crimp A/C Hose Ends
Details

 02-19-2017
1.00
A/C Hose Guides & Drain Fitting
Details

 02-17-2017
7.75
A/C Hose Runs
Details

 02-16-2017
8.00
Plexiglass Trimming; Cabin Top Drilling
Details

 02-15-2017
3.00
Inventoried Parts & Developed Wiring Reqmts
Details

 02-14-2017
3.00
Determined Wiring Required to Back
Details

 02-13-2017
7.75
Wingtip Light Covers & Rear Window
Details

 02-10-2017
2.50
Prepare Wing Tip Light Covers
Details

 02-10-2017
2.00
Practiced Plexiglass Cutting
Details

 02-10-2017
1.50
Cabin Top Vertical Support Post
Details

 02-09-2017
8.00
Drilling Cabin Top
Details
       

 02-07-2017
7.75
Prep for Electrical, A/C Prep
Details

 02-06-2017
8.50
Evap Shelf & Glass Overhead Console
Details

 02-02-2017
6.25
Wiring Prep & Fiberglass Overhead Console
Details

 02-01-2017
5.25
Wiring for Tail Light
Details

 01-31-2017
7.00
Glued Overhead Console to Cabin Top
Details

 01-30-2017
5.75
Prepare Overhead Console
Details

 01-24-2017
4.50
Install Coax to Tail Cone
Details

 01-23-2017
7.30
Prepare Overhead Console for Gluing
Details

 01-20-2017
6.50
Installed Lights in Left Wing Tip
Details

 01-19-2017
6.00
Wing Tip Lights
Details

 01-17-2017
6.00
Cabin LIghts
Details

 01-16-2017
8.00
Antennas, Tail LIght, Bulkhead Repair
Details

 12-16-2016
1.00
Wing Tips Modifications
Details

 12-16-2016
5.00
Install A/C Condenser
Details
       

 12-14-2016
4.00
Installed Gas Strut Attach Doublers
Details
       

 12-13-2016
6.00
Fitting Doors
Details
     

 12-12-2016
5.50
GPS Antenna Installation
Details
       

 12-12-2016
2.50
Clecoed Doors to Fuselage
Details

 12-08-2016
3.50
Parking Brake Valve
Details
       

 12-08-2016
2.50
Installed Engine Mount
Details
     

 12-07-2016
6.00
Install Antennas
Details

 12-05-2016
7.50
Door Trimming
Details

 12-02-2016
7.50
Trimmed Outer Door Skins
Details

 11-29-2016
1.50
Seat Floor Access Hatch Fabrication (continued)
Details

 11-29-2016
0.50
Installed the Fuel Flow Transmitter
Details

 11-29-2016
4.25
Complete Finishing Kit Inventor
Details

 11-28-2016
7.50
Unpack and Inventory
Details

 11-27-2016
1.50
Rivet Fuel Flow Transmitter Bracket to Fuselage
Details

 11-23-2016
1.00
Received Finishing Kit
Details

 11-21-2016
8.00
Created Access Hatch in Rear Seat Floor
Details

 11-14-2016
7.00
Wing Tips Modified for Landing Lights
Details

 11-11-2016
6.75
Installed A/C Scoop RivNuts
Details

 11-09-2016
6.00
Cabin Overhead Lights
Details

 11-07-2016
5.50
Located A/C Scoop On Fuselage Bottom
Details

 11-03-2016
9.00
Researching Avionics/Electrical Requirements
Details

 10-31-2016
6.50
Installed Vent Fans In Panel Top
Details
       

 10-27-2016
7.50
Overhead Console Fitting
Details

 10-24-2016
7.25
Removed Seat Covers; Cut Evap Shelf and Installed
Details

 10-20-2016
5.00
Inventory and Study Documents
Details

 10-19-2016
7.50
Aileron Linkages & Trim Servo
Details
       

 10-18-2016
6.50
FT-60 Connection; Aileron Control Linkages
Details
       

 10-12-2016
6.25
Installed Nav Antenna Into Vertical Stabilizer
Details
       

 10-10-2016
5.00
FT-60 & Wing Walk
Details

 10-05-2016
7.00
Fabricated F1099 Wing Fairing Supports & Stiffener
Details

 10-04-2016
4.00
Began Fitting Overhead Console
Details

 10-03-2016
3.50
Fuel System
Details

 09-30-2016
3.00
Fitting Cabin Top
Details
       

 09-28-2016
8.00
Fitting Cabin Top
Details

 09-27-2016
5.50
Cabin Top Fitting
Details

 09-26-2016
6.00
Flap Actuator Assembly Install
Details
       

 09-23-2016
4.50
Elevator Control System Install
Details
       

 09-22-2016
7.00
Fuel Filter & Pump; Fiberglass Top Trim
Details
       

 09-21-2016
8.00
Fiberglass Top; Baggage Door
Details
       

 09-20-2016
8.75
Cutting Down Fiberglass Top; Installing Baggage Do
Details
       

 09-19-2016
8.25
Began Work on Fuselage Top
Details

 09-16-2016
6.25
Rear Seat Backs
Details
       

 09-15-2016
8.50
Flap Bushings; Cowl Attach Hinge Fabrication
Details

 09-14-2016
8.25
Flap System
Details

 09-12-2016
8.00
Control System
Details

 09-09-2016
7.00
Installed Rudder Pedals; Fabricated Elevator Push
Details
       

 09-08-2016
6.50
Static Port Tubing; Brake/Rudder Pedals
Details
       

 09-07-2016
8.50
Anti-Yaw Bracket and Static Air Tubing
Details

 09-06-2016
8.25
Fuel System
Details
       

 09-01-2016
8.25
Yaw Servo Mount, Brake Lines
Details
       

 08-31-2016
8.25
Baggage Door, Pitch Servo, Rear Seat Floor
Details

 08-29-2016
3.75
Baggage Corrugation Wear Blocks & Door
Details
     

 08-26-2016
5.50
Continued Baggage Area Work
Details

 08-25-2016
8.50
Baggage Area
Details

 08-24-2016
2.75
Install Steps & Prep For Floor Riveting
Details
       

 08-23-2016
6.50
Install Conduit in Fuselage
Details
       

 08-22-2016
6.25
Hinges and Floor for Baggage Area
Details

 08-19-2016
5.00
Rivet Fuselage to Tail Cone
Details
     

 08-18-2016
7.50
Disconnected Tail Cone and Prepared for Riveting
Details

 08-11-2016
8.00
Tail Cone Mating to Fuselage
Details

 08-10-2016
7.00
Riveted Right Wing
Details
       

 08-10-2016
1.50
Initial Connection of Tail Cone to Fuselage
Details

 08-09-2016
8.50
Riveted Bottom Skin on Left Wing
Details

 08-08-2016
8.00
Front Floor, Brake Lines, Wiring Holes
Details

 08-05-2016
8.00
Wing Wiring & Prep for Closure
Details

 08-04-2016
6.00
Installed Roll Servo Mount & Wing Wiring
Details

 08-03-2016
8.00
Wing & Fuselage Conduit, Aileron Trim Servo
Details

 08-02-2016
7.50
Installed Wing Conduit & Fuselage Floor Insulation
Details

 08-01-2016
7.50
Pitot Mast
Details
     

 07-21-2016
7.50
Aileron Actuation, Brake Lines
Details

 07-20-2016
8.00
Aileron Actuation
Details

 07-19-2016
8.00
Flap & Aileron Gap Fairings; J-Stiffener Drilling
Details

 07-18-2016
8.00
Filled Leading Edge Guide Holes
Details

 07-15-2016
7.50
Primed Parts; Installed AHRS Bracket in Tail Cone
Details

 07-14-2016
7.00
Preparing for Priming
Details

 07-13-2016
7.00
Access Panels for Step Bolts
Details

 07-12-2016
8.00
Priming & Locating Access Hatch
Details

 07-11-2016
8.50
Continued QB Fuselage Work Against Plans
Details

 07-08-2016
6.00
Continued QB Fuselage Review Against Plans
Details

 07-07-2016
8.00
Began review of QB fuselage against plans
Details

 07-06-2016
7.50
Continued Comparison of QB Wings with Plans
Details

 07-05-2016
7.80
Began fiberglass work on empennage fairings
Details

 07-01-2016
6.00
Began Review of QB Wings for Unfinished Work
Details

 06-30-2016
7.75
Fit Empennage Fairings
Details

 06-29-2016
8.75
Fitting Fiberglass Fairings to Horizontal Stabiliz
Details

 06-28-2016
5.50
Elevator Trim Install
Details

 06-27-2016
8.25
Elevator Trim Servo Install
Details

 06-25-2016
6.50
Elevator Push Rod & Rudder Install
Details

 06-24-2016
6.50
Attached Horiz. & Vert. Stab. to Tail Cone
Details
       

 06-23-2016
8.00
Mounted Horiz. Stabilizer to Tail Cone
Details
       

 06-22-2016
7.50
Completed Tail Cone
Details

 06-21-2016
7.00
Rivet Tail Cone Top Skin

 06-20-2016
7.25
Riveting Tail Cone
Details

 06-18-2016
3.50
Continue Tail Cone Riveting
Details

 06-17-2016
4.00
Riveting Tail Cone Right Side
Details

 06-16-2016
8.00
Tail Cone Riveting Started
Details

 06-15-2016
7.50
Dimple & Countersink Tailcone Components
Details

 06-14-2016
6.75
De-bur Tailcone Components
Details

 06-13-2016
8.00
Complete Tail Cone Drilling & Disassemble
Details

 06-10-2016
7.00
Install & Drill Tail Cone Angle, Install Top
Details
       

 06-08-2016
5.00
Reassembling Tail Cone
Details
       

 06-08-2016
2.00
Built DRDT Platform
Details

 06-07-2016
3.00
Resumed Work On Tail Cone
Details

 06-07-2016
2.50
Inventory Tools
Details

 06-06-2016
7.50
Inventory Quick Build Kits
Details
       

 05-30-2016
3.00
Quick Build Kits Delivered
Details
       

 03-25-2016
2.00
Cut Workbench Lumber
Details

 03-24-2016
4.25
Cut Workbench Legs
Details

 03-23-2016
3.25
Workbench Research & Design
Details

 03-09-2016
8.00
Tailcone Initial Fit-up
Details
       

 03-08-2016
1.00
Roll Elevator Leading Edges
Details

 03-08-2016
4.00
Finish Horizontal Stabilizer Construction
Details
       

 03-08-2016
3.00
Begin Tail Cone Structure
Details
     

 03-07-2016
1.00
Rudder Completion
Details
     

 03-07-2016
3.83
Horizontal Stabilizer Build
Details
       

 03-07-2016
3.00
Elevators Trailing Edge
Details
     

 03-06-2016
2.75
Completed Tailcone Primer Preparation
Details

 03-05-2016
7.70
Tailcone Prep for Primer
Details

 03-04-2016
4.33
Horizontal Stabilizer Skeleton
Details
       

 03-04-2016
4.00
Complete Vertical Stabilizer
Details
       

 03-03-2016
3.20
Vertical Stabilizer Structure Fab
Details
       

 03-03-2016
3.00
Rudder Trailing Edge
Details
       

 03-03-2016
2.00
Horizontal Stabilizer Build
Details
       

 03-02-2016
8.25
Elevator
Details
       

 03-01-2016
8.17
Elevator - Day 1
Details
       

 02-29-2016
8.00
Rudder Construction
Details
       