KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
Work Logs Found: 137
Category Work Time: 757 Hours
 Date
Hours
Work Log Summary

Details

 05-19-2020
1.50
Auto Pilot Ground Tests, Adjust Oil Press Alarm
Details

 02-21-2020
6.75
Trouble Shoot & Calibrate. Seal Firewall
Details

 02-20-2020
4.25
Installed Labels, Entered Set Points and Ranges
Details

 02-16-2020
4.00
Avionics Trouble Shooting
Details

 02-12-2020
5.00
Configuring I/O Channels. Diagnosing Elev. Trim P
Details

 02-11-2020
4.25
Updated Avionics Software. Started Calibration.
Details

 12-13-2019
7.25
Installed Pitot/AOA and Fuel Level Transmitters
Details

 12-12-2019
3.25
Installed GTP 59 OAT. Begin fitting Pitot Tube
Details

 12-10-2019
6.50
Install GMU 11 & Stick Grips
Details

 11-26-2019
3.25
Updated Drawings to As Built
Details

 10-14-2019
6.75
Install Yaw Servo, F-1025 Rear Seat Side Covers
Details

 10-11-2019
5.50
Installed Pitch Servo for Autopilot
Details

 09-05-2019
7.75
Install Right Wing Connector, Add Lighting Pot Gro
Details

 08-12-2019
5.00
Completed G5 Wiring, Epoxy Sealed Lower Cowl
Details

 08-09-2019
7.00
G5 Mounting & Wiring
Details

 08-08-2019
6.25
G5 Bracket Design, Glare Shield Cover
Details

 08-07-2019
5.25
GMU Mount & Connectors for GMU and GSA 28
Details

 08-06-2019
7.25
Fix Overhead Lights, Seat Heaters; Worked on G5 Mo
Details

 08-02-2019
7.00
Instrument Lights, Overhead Lights
Details

 08-01-2019
3.50
Software Updates, Com Tests, Config Checks
Details

 07-19-2019
3.00
Installed Stick Switch Connectors
Details

 07-18-2019
6.00
Trouble Shoot Seat Heat & Switch Lights
Details

 07-17-2019
7.25
CAN Bus Trouble Shooting & Repair
Details

 07-16-2019
7.00
CAN Bus Trouble Shooting
Details

 07-15-2019
7.25
Reviewing Config. Requirements
Details

 07-11-2019
7.25
CAN Bus Trouble Shooting
Details

 07-10-2019
7.00
Installed GDUs & GTN. First Power to Panel
Details

 07-09-2019
7.25
Center Breakers, Close Center Panel, Replace Coax
Details

 07-08-2019
5.50
Closed Right Section Panel, Started Center Breaker
Details

 07-05-2019
7.75
Right Side Breakers & Avionics Tray
Details

 07-02-2019
7.50
Cut Right Avionics Tray, Removed heater cables, wi
Details

 07-01-2019
8.00
Coax Connections, Stick Grip Wires, Right Air Vent
Details

 06-28-2019
7.25
Transponder Antenna. Heater SCAT tubing Install
Details

 06-26-2019
7.00
Right Side Panel Wiring
Details

 06-25-2019
7.25
Right Panel: GAD 27 & GEA 24
Details

 06-24-2019
7.75
Left Side Completion, GAD 27 Connectors
Details

 06-21-2019
7.25
Left Panel Finalization
Details

 06-20-2019
7.25
ELT Wiring, Left Tray Modification
Details

 06-19-2019
7.00
ELT Install, Coax Connectors, Revised GTR 20 Locat
Details

 06-18-2019
7.75
Rudder Trim, Heater Cables
Details

 06-17-2019
7.75
Fitting Center Side Panels to Control Panel
Details

 06-14-2019
2.25
Control Panel Center Console Sides
Details

 06-13-2019
7.25
Continued Left Panel Wiring Work
Details

 06-12-2019
7.25
GMA 245 Wiring Completed, Alternator and Battery C
Details

 06-11-2019
7.25
Rear Headset Jacks, Audio Wiring Prep.
Details

 06-10-2019
4.25
Notched Sub-Panel for GTN 650
Details

 06-07-2019
7.50
Re-Installed LRU Cages and Installed Main Harness
Details

 05-14-2019
5.50
Completed GEA 24 P243 Connector
Details

 05-13-2019
7.00
Began Panel Install, Completed P242 GEA 24
Details

 05-03-2019
6.50
Routed Engine Sensor Wires
Details

 05-02-2019
6.00
Engine Sensors
Details

 04-26-2019
4.50
Completed G5 Case Frame
Details

 04-25-2019
7.50
Creating Case for G5 Mounting
Details

 04-24-2019
7.00
CAN Bus Connections, Ign Switch Wiring
Details

 04-23-2019
6.50
Switch & Breaker Wiring; CAN-Bus Wiring
Details

 04-22-2019
6.25
Power & Switch Wiring, Seat Heater Switches
Details

 04-19-2019
5.00
Wired Panel Lights; CO Detector and Switch LEDs
Details

 04-18-2019
5.00
Ground Blocks; Lighted PushButtons
Details

 04-17-2019
6.75
IBBS Connector; Breakers; Power Leads
Details

 04-16-2019
7.75
CO Det; IBBS
Details

 04-10-2019
6.25
GTR 20 and GTX 45R Wiring
Details

 04-09-2019
3.75
GAD 29; GSU 25 Wiring
Details

 04-08-2019
8.25
GAD 29; GEA 24 P241; GMC 305 Wiring
Details

 04-05-2019
7.25
GAD 27 - P271 Connector Wiring
Details

 04-04-2019
6.50
GMA 245 Wiring
Details

 04-03-2019
3.50
GMA 245 Wiring Started
Details

 04-02-2019
8.25
Completed Wiring for GTN 650
Details

 04-01-2019
7.50
GTN 650 Wiring
Details

 03-29-2019
4.75
MFD & PFD2 Wiring
Details

 03-28-2019
6.75
PFD-1 & MFD Wiring
Details

 03-27-2019
3.50
PFD-1 Wiring
Details

 03-26-2019
7.00
PFD-1 Wiring Harness Fabrication Begins
Details

 03-25-2019
4.25
Determine CAN Bus Order & Document
Details

 03-22-2019
6.00
Measure & Create Harness Layout Board
Details

 03-21-2019
4.50
Avionics Relay, Switches, Measured Sub-Panel
Details

 03-20-2019
1.50
Sketched Wire Bundle Routing Diagream with Distanc
Details

 03-20-2019
5.00
Installing Breakers & ELT Control Head
Details

 03-19-2019
2.50
Determininng Breakers Install & Req'd Crimp Connec
Details

 03-18-2019
1.50
Enlarging Panel Holes
Details

 03-15-2019
5.50
Preparing Panel for Wiring
Details

 03-14-2019
5.00
Completed Wiring Diagrams
Details

 03-13-2019
6.75
Added Wire Numbers to Wiring Diagrams
Details

 03-12-2019
7.00
Wiring Diagrams Refinement
Details

 03-11-2019
8.50
Wiring Diagrams Development/Refinement
Details

 03-09-2019
1.50
Rivet Firewall Penetrations
Details

 03-06-2019
3.00
Reviewed & Marked-up Wiring Diagrams
Details

 03-05-2019
8.50
Revised Wiring Diagrams, Added A/C and Seat Heater
Details

 02-27-2019
6.50
Mounted LRUs to Panel Trays
Details

 02-26-2019
7.75
Mounting Voltage Regulators, GSU 25, CO Detector
Details

 02-25-2019
6.50
Determining LRU Mounting Locations
Details

 02-22-2019
6.50
Mounting GTX 45R Transponder Rack
Details

 02-20-2019
7.25
Mounting GTN650 Cage to Panel
Details

 02-18-2019
6.00
Preparing Avionics Cage Mounting
Details

 02-15-2019
8.00
Panel Installation
Details
       

 02-06-2019
2.50
Begin Fitting GTN 650 & Audio Panel to Aircraft
Details
       

 02-05-2019
5.00
Avionics Inventory, Fuel Valve Extension
Details

 01-29-2019
4.75
Developing Wiring Diagrams
Details

 01-23-2019
7.00
Avionics LRU Wiring Diagrams
Details

 01-15-2019
4.50
Wiring Diagrams
Details

 10-28-2018
4.50
Avionics Wiring Diagrams
Details

 10-03-2018
3.50
Avionics Wiring Diagrams
Details

 09-15-2018
3.00
Avionics Wiring Diagrams
Details

 09-14-2018
5.00
Avionics Wiring Diagrams
Details

 06-14-2018
5.50
Continued Development of Avionics Wiring Diagrams
Details

 06-13-2018
2.50
Avionics Wiring Diagrams
Details

 06-12-2018
4.00
Avionics Wiring Diagrams
Details

 06-11-2018
3.00
Avionics Wiring Diagrams
Details

 06-07-2018
2.00
Avionics Wiring Diagrams
Details

 06-06-2018
5.00
Avionics Wiring Diagrams Creation
Details

 05-31-2018
3.00
Develop Draft LRU Pages in PowerPoint
Details

 05-30-2018
2.00
Organize Previous Avionics Work in Preparation
Details

 02-22-2018
7.50
Fitting Control Panel & Center Console
Details

 02-21-2018
7.25
Started Fitting Control Panel to Aircraft
Details

 02-06-2018
1.25
Unpacked & Inventoried Panel & Parts
Details

 01-03-2018
1.50
Final Review of Panel CAD Drawing
Details

 12-12-2017
1.00
Panel Layout
Details

 11-20-2017
2.00
Panel Design
Details

 11-09-2017
3.00
Panel Planning
Details

 08-02-2017
5.00
Planning & Ordering Avionics Equipment
Details

 07-31-2017
4.50
Planning for Panel Avionics Order
Details

 06-09-2017
7.75
Tail Cone Wiring Harness
Details

 06-08-2017
2.00
Wiring diagrams Development
Details

 06-07-2017
5.00
Preparation for Tail Cone and Wing Wiring
Details

 06-01-2017
7.00
Creating Avionics Wiring Diagrams
Details

 04-20-2017
3.00
Installled Headset Jack Recess Panels
Details

 04-05-2017
5.75
Installed Molex Connectors to Trim Servos
Details

 04-04-2017
5.00
Flap Position Transmitter
Details

 03-31-2017
1.50
Coax Labels
Details

 03-29-2017
6.25
Installed Coax Antenna Connectors, Rung Out Wires
Details

 03-20-2017
7.00
Fabricated Bracket for Flap Position Sensor & Pull
Details

 03-13-2017
7.75
Avionics Wiring In Fuselage
Details

 03-09-2017
4.00
Developed Listing of Avionics Wires To Be Installe
Details

 01-24-2017
4.50
Install Coax to Tail Cone
Details

 12-12-2016
5.50
GPS Antenna Installation
Details
       

 12-07-2016
6.00
Install Antennas
Details

 11-03-2016
9.00
Researching Avionics/Electrical Requirements
Details

 10-31-2016
6.50
Installed Vent Fans In Panel Top
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.