KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  3-21-2019
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Avionics Relay, Switches, Measured Sub-Panel

Determined location for the Avionics Power Relay below the center circuit breakers. Drilled a mounting hole in the panel for this relay.

Measured the wire routes from the main bundle to each of the devices mounted on the sub-panel and sketched up a wire routing diagram for these.

Installed the switches in the panel.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.