KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  9-5-2019
Number of Hours:  7.75
Manual Reference:  
Brief Description:  Install Right Wing Connector, Add Lighting Pot Gro

Installed the mating CPCC connector to the wires in the right wing at the wing root.

Added a ground to each of the 3 lighting level potentiometers in the panel. Required removing the left side of the left hand tray behind the PFD, then removing the pots from the panel. Soldered a common ground wire to the previously open/floating terminals on the 3 pots.

Added nuts to the DB-9 connector that makes the connections for the pots so that the 2 halfs can now screw together rather than being held together by tie-wraps.

Reassembled and tested/calibrated the lighting level controls through the G3X PFD.

Removed all the antennas from the fuselage and packed them up for the upcoming move to the airport.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.