Brief Description: Install Right Wing Connector, Add Lighting Pot Gro
Installed the mating CPCC connector to the wires in the right wing at the wing root.
Added a ground to each of the 3 lighting level potentiometers in the panel. Required removing the left side of the left hand tray behind the PFD, then removing the pots from the panel. Soldered a common ground wire to the previously open/floating terminals on the 3 pots.
Added nuts to the DB-9 connector that makes the connections for the pots so that the 2 halfs can now screw together rather than being held together by tie-wraps.
Reassembled and tested/calibrated the lighting level controls through the G3X PFD.
Removed all the antennas from the fuselage and packed them up for the upcoming move to the airport.