KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
Work Logs Found: 115
Category Work Time: 568 Hours
 Date
Hours
Work Log Summary

Details

 05-13-2020
6.50
Installed Wheel Fairings
Details

 02-10-2020
3.00
Removed Van's Weatherstripping from Right Door
Details

 01-10-2020
3.50
Installing Door Weather Seals
Details

 12-12-2019
3.00
Modify Right Front Seat Adjuster
Details

 12-11-2019
7.25
Fixed Aileron Trim, Installed Seat Nutplates & Sea
Details

 09-12-2019
4.00
Front Seats
Details

 09-11-2019
7.75
Long SCAT for Heater, Installed Left Seat Rails.
Details

 08-20-2019
6.75
Seat Belt Bolts, Side Console Labels
Details

 05-10-2019
2.00
Re-install Cabin Brace
Details

 05-01-2019
7.00
Glare Shield Cover Sides, EGT/CHT Wiring
Details

 04-30-2019
5.00
Glare Shield Cover; EGT/CHT Wire
Details

 04-29-2019
4.50
Began Install of Glare Shield Cover; EGT/CHT Wire
Details

 02-13-2019
4.50
Oil Door, AC Bump-Out, Center Console
Details
     

 02-01-2019
6.50
Fitting the Central Console
Details

 01-31-2019
3.75
Fitting the Center Console
Details

 01-21-2019
5.75
Cowl, Exhaust, Seat Heaters
Details

 01-18-2019
5.50
Oil Door, Cowl Bump-outs, A/C Hose
Details

 01-17-2019
5.00
Attaching Rear Seat Backs
Details
     

 01-16-2019
2.75
Lower Cowl Bump-Outs
Details
     

 01-14-2019
4.75
Engine Cowl Fiberglass Work
Details
       

 01-11-2019
5.00
Cowl Modifications & Heated Seats
Details
     

 01-10-2019
2.00
Oil Door and Cowl Modification
Details

 01-09-2019
5.25
Oil Door Hinge and Latch
Details
     

 02-19-2018
7.00
Cowl Pin Covers
Details

 02-02-2018
7.00
Bottom Cowl & Baffles
Details

 02-01-2018
7.25
Bottom Cowl Louvers
Details

 01-31-2018
6.50
Cowls
Details

 01-30-2018
6.50
Top Cowl Side Hinges
Details

 01-29-2018
5.25
Bottom Cowl Side Hinges Riveted. Oil Door Cut
Details

 01-26-2018
2.00
Bottom Cowl Side Hinges
Details

 01-25-2018
7.00
Cowl Edges
Details

 01-23-2018
7.50
Cowl - Riveting Hinges
Details

 01-22-2018
7.25
Cowl Attachment - New Hinges
Details

 01-10-2018
2.50
Sanded Epoxy Filled Holes in Cowls
Details

 01-09-2018
5.75
Cowl Fitting - Hinge Drilling Mistake
Details

 01-08-2018
7.00
Fitting Cowl & Drilling for Hinge Riveting
Details

 01-05-2018
6.75
Cowl Fitting
Details

 01-04-2018
3.00
Fitting Cowl
Details

 01-03-2018
6.50
Fitting Bottom Cowl
Details

 01-02-2018
5.50
Trim Top Cowl
Details

 11-07-2017
1.50
Lowered Onto Gear
Details

 11-06-2017
5.50
Install Interface Fairings on Main Gear
Details

 11-01-2017
6.50
Nose Gear Fairing
Details

 10-31-2017
4.75
Nose Gear Fairing
Details

 10-30-2017
4.75
Gear Leg Fairings
Details

 10-20-2017
4.50
Main Gear Leg Fairings
Details

 10-19-2017
7.50
Nosewheel Fairing & Gear Leg Fairing
Details

 10-18-2017
5.50
Nose Wheel Fairing
Details

 10-17-2017
5.50
Wheel Fairings
Details

 10-16-2017
8.00
Wheel Fairings
Details

 10-13-2017
5.00
Wheel Fairings
Details

 10-12-2017
6.50
Wheel Fairings
Details

 10-11-2017
7.50
Wheel Fairings
Details

 10-10-2017
7.25
Wheel Fairings
Details

 10-09-2017
6.00
Wheel Fairings
Details

 10-06-2017
5.50
Wheels & Brakes
Details

 10-06-2017
2.00
Nose Gear Assembly
Details

 10-05-2017
1.50
Raised Fuselage Onto Work bench
Details

 10-05-2017
2.00
Installed Landing Gear Legs
Details

 10-04-2017
3.75
Finished Windscreen & Prepared for Fuselage Liftin
Details

 10-03-2017
4.50
Finished Windscreen Fairing
Details

 10-02-2017
4.75
Windscreen Fairing; Window Edge Filler
Details

 09-29-2017
2.50
Epoxy Finish Coat on Windscreen Fairing
Details

 09-28-2017
3.00
Windscreen Fairing Final Shape & Top Coat
Details

 09-27-2017
2.00
4th Thin Layer of Epoxy-Micro on Windscreen Fairin
Details

 09-26-2017
1.75
Added 3rd Layer of Epoxy-Micro to Windscreen Fairi
Details

 09-25-2017
3.00
Second Epoxy/Micro Finishing Layer
Details

 09-22-2017
1.50
First Epoxy Micro Finish Coat on Windscreen Fairin
Details

 09-21-2017
2.00
Filled Door Fab Rivets; Added Fiberglass to Windsc
Details

 09-20-2017
1.50
Added Fiberglass Layers to Windscreen Fairing
Details

 09-19-2017
4.50
Windscreen Fairing; Repair Right Door Strut Mount
Details

 09-15-2017
5.00
Fiberglass Layers on Windscreen & Touch up Paintin
Details

 09-14-2017
2.00
Second Fiberglass Layer on Windscreen
Details

 09-13-2017
4.50
First Fiberglass Layer on Windscreen
Details

 09-12-2017
5.00
Prepared for Windscreen Base Faring Fabrication
Details

 09-11-2017
4.00
Corrected Windscreen Gluing Error
Details

 09-08-2017
8.25
Finalized Left Door Latch Installation
Details

 09-07-2017
7.75
Left Door Mounting
Details

 09-06-2017
7.00
Mounting Right Door
Details

 09-05-2017
7.25
Door Latch Tips & Door Gas Struts
Details

 08-23-2017
3.50
Glued Plexiglass
Details

 08-22-2017
6.25
Preparing for Gluing Plexiglass
Details

 08-21-2017
8.25
Install Door Latches
Details

 08-19-2017
0.75
Paint Touch-up Around Doors
Details

 08-18-2017
2.50
Touch Up Painting Around Doors
Details

 08-17-2017
1.75
Painting Doors
Details

 08-16-2017
1.00
Painting Interior Doors
Details

 08-15-2017
5.00
Prep Doors & Interior for Painting
Details

 08-14-2017
7.25
Prep Doors for Interior Paint
Details

 08-11-2017
3.00
Primed Inside of Doors
Details

 08-10-2017
5.50
Prep Doors for Painting; Prep Windscreen for Gluin
Details

 08-09-2017
7.00
Door Latches
Details

 08-08-2017
6.50
Nose Gear Wheel, Prop Storage, Door Latch Covers
Details

 08-07-2017
5.50
Cabin Doors, Interior touch up, Nose Gear
Details

 07-31-2017
2.50
Door Latches
Details

 07-12-2017
5.50
Door Latches
Details

 07-11-2017
7.50
Door Latches
Details

 07-10-2017
4.75
Door Latch
Details

 07-06-2017
2.75
Door Latches
Details

 07-05-2017
7.00
Door Latches
Details

 07-03-2017
7.75
Engine Mount Installation; Door Handles
Details

 06-30-2017
1.75
Right Door Window Fitting
Details

 06-29-2017
7.50
Hang Door & Trim Door Window Plexiglass
Details

 06-28-2017
7.25
Door Fitting
Details

 06-27-2017
7.00
Trimming Doors
Details

 06-26-2017
6.75
Trimmed Doors
Details

 06-23-2017
2.50
Bonded Doors Together
Details

 12-14-2016
4.00
Installed Gas Strut Attach Doublers
Details
       

 12-13-2016
6.00
Fitting Doors
Details
     

 12-12-2016
2.50
Clecoed Doors to Fuselage
Details

 12-05-2016
7.50
Door Trimming
Details

 12-02-2016
7.50
Trimmed Outer Door Skins
Details

 11-29-2016
4.25
Complete Finishing Kit Inventor
Details

 11-28-2016
7.50
Unpack and Inventory
Details

 11-23-2016
1.00
Received Finishing Kit
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.