KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  9-26-2017
Number of Hours:  1.75
Manual Reference:  
Brief Description:  Added 3rd Layer of Epoxy-Micro to Windscreen Fairi

Sanded down the prior layer of epoxy-micro using 60 grit sandpaper wrapped around a 5" long piece of pool noodle. Sanded the top down to the electrical tape so the tape and it's lower edge were clearly visible. Sanded the curve and the lower edge feathered to the aluminum skin.

Mixed up 5 pumps of epoxy and added micro-balloons (no dye) to a putty thickness. Applied with a plastic "squeegy" held curved in the center and allowed to go flat at the ends of the fairing.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.