KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
Work Logs Found: 51
Category Work Time: 273 Hours
 Date
Hours
Work Log Summary

Details

 04-22-2020
5.25
Oil Door Latch
Details

 03-30-2020
2.50
Revised Top Cowl Firewall Pin Clip
Details

 03-25-2020
3.75
Cowl Re-Fitting
Details

 03-23-2020
4.50
Modified Left Cooling Air Inlet Ramp
Details

 03-20-2020
5.00
Removable Snorkle - Part 3
Details

 03-19-2020
3.00
Snorkle Removal Part 2
Details

 03-17-2020
3.25
Lower Cowl Snorkle Removal
Details

 08-21-2019
7.00
Re-Installed Heater Controls Mount Sure Start
Details

 02-04-2019
5.00
Ground Straps, Throttle Quadrant, Fiberglass Bump-
Details

 01-28-2019
5.75
Wiring for Starter, Alternator, & Compressor
Details

 01-22-2019
4.75
Propeller Install, Seat Heater Wires, Cowl Bumpout
Details

 01-07-2019
3.75
Installed Mufflers/Heat Muffs
Details
       

 03-25-2018
0.00
Fractured Foot - Work Will Be Delayed
Details

 03-23-2018
6.75
FAB Install & Exhaust Headers
Details
       

 03-22-2018
7.75
Filtered Air Box Baffling
Details

 03-21-2018
1.75
Air Box Inlet Work
Details

 03-20-2018
6.00
Engine Control Cables Installed
Details

 03-19-2018
1.75
Filtered Air Box Inlet Fiberglass Fab
Details

 03-06-2018
1.50
Cowl to Filtered Air Box Fab
Details

 03-05-2018
3.00
Cowl To Filtered Air Box
Details

 03-02-2018
4.75
Air Box to Cowl Connection Fab
Details

 03-01-2018
4.00
Filtered Air Box
Details

 02-28-2018
7.25
Filtered Air Box Creation
Details

 02-27-2018
7.00
Filtered Air Box
Details

 02-26-2018
4.00
Filtered Air Box
Details

 02-23-2018
7.00
Determing Control Cable Lengths & Routings
Details

 02-20-2018
6.75
Throttle Body Install & Cowl Pin Cover Plates
Details

 02-16-2018
7.50
Rivet Baffle Seals; Installed Oil Cooler & CHT Pro
Details

 02-15-2018
7.25
Fabricating Baffle Seals
Details

 02-14-2018
6.00
Installing Baffle Seals
Details

 02-13-2018
8.00
Baffle Tension Rods & Spark Plug Top Wires
Details

 02-12-2018
7.25
Finished Trimming Baffles
Details

 02-09-2018
5.50
Trimming Baffles
Details

 02-08-2018
7.25
Baffle Trimming
Details

 02-07-2018
7.25
Front Inlet Ramp Baffles - Continued
Details

 02-06-2018
6.75
Left Inlet Ramp Baffles
Details

 02-05-2018
8.00
Left Inlet Ramp Fitting and Front Baffles
Details

 12-12-2017
3.75
Left Intake Baffle Modification for Air Conditione
Details

 12-11-2017
3.75
Air box Alternate Air Door and Drain Tube
Details

 12-01-2017
6.00
Air Box Fabrication
Details

 11-28-2017
6.50
Engine Baffle Prep and Cowling Prep. Door Switch
Details

 11-22-2017
4.00
Baffles Install & Cowl Trim
Details

 11-21-2017
7.25
Baffles Fabrication & Installation
Details

 11-20-2017
5.50
Engine Baffles
Details

 11-17-2017
7.25
Engine Baffles Fabrication
Details

 11-16-2017
7.25
Alternator Install & Baffles
Details

 11-15-2017
6.50
Engine Installation
Details

 11-13-2017
6.00
Prep Rear of Engine For Installation
Details

 11-08-2017
6.00
Install Backup Alternator onto Engine
Details

 11-07-2017
5.00
Began Preping Engine for Mounting
Details

 05-18-2017
5.00
Inventory
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.