Continued fabrication and installation of engine baffles. Did not install Prop Govenor Cable Bracket as it will need to be moved due to the A/C compressor, but did remove the side openings. Installed both inlet ramps to the engine.
Reached step step 4 on FF2-13 and realized that it was now time to begin preparation of the cowl. Did the initial trim of the cowl fronts per pg. 47-4. At the last step on this page, I determined that I needed to trim a bit more in order for the 2 halves to fit together properly.