KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
Work Logs Found: 38
Category Work Time: 192 Hours
 Date
Hours
Work Log Summary

Details

 04-24-2020
3.00
Oil Door, Inspection Plate, Avionics Update
Details

 03-30-2020
2.50
Misc. Prep for First Flight
Details

 03-13-2020
2.00
Aircraft Review by Rich Jankowski
Details

 03-10-2020
5.00
Installed Fairings & Data Plate. Modified Seats
Details

 02-26-2020
4.00
Airworthiness Inspection Corrections
Details

 02-24-2020
4.00
DAR Inspection
Details

 02-23-2020
8.00
Final Prep for DAR Inspection
Details

 02-22-2020
7.75
Install Inlet Seals, Seat Belts; RTV Baffle Sealin
Details

 02-19-2020
6.50
Engine Start, Calibrated AHARS & Magnetometer
Details

 02-04-2020
4.00
Replaced Left Door Seal. Installed Wing Walk Tape
Details

 02-03-2020
3.00
Re-installed Rudder Trim. Removed Van's Left Door
Details

 01-30-2020
3.25
Weigh Airplane
Details

 01-29-2020
4.25
Preparing for Weighing
Details

 01-28-2020
4.50
Getting Ready to Weigh
Details

 01-16-2020
6.75
ELT Install, Cowl Support Bracket, Exhaust Pipes
Details

 01-15-2020
6.25
Mag Timing. Brake Bleeding
Details

 01-09-2020
6.25
Rudder Trim, Door Seal, Preservative Oil Drain
Details

 12-09-2019
5.50
Nameplate, Seat Floors, Aileron Trim Servo
Details

 10-23-2019
7.00
Cut Left Stick, Installed Antennas & Baggage Seal
Details

 10-22-2019
7.75
Fuel Caps, Heater Cable Safety Wire, Stick Cutting
Details

 10-01-2019
4.25
Cut Shelves and Cleaned Out Richmond Shop
Details

 09-25-2019
5.25
Shop Unpacked; Reinstalled Gear Pants Brackets
Details

 09-24-2019
4.50
Moved Shelves to Airport
Details

 09-23-2019
8.50
Moved Shop to KARM Airport
Details

 09-20-2019
5.00
Packing Shop for Move to Airport
Details

 09-19-2019
2.00
Packing Shop for Move to Airport
Details

 09-17-2019
5.50
Packing Shop for Move to Airport
Details

 09-16-2019
3.50
Moved Fuselage to Wharton Airport KARM
Details

 09-13-2019
6.00
Right Seat Rails, Front Ovhd Lights, Heat Shld
Details

 09-10-2019
5.25
Left Heat Inlet, G5 Install, Vent Fan Trim Rings
Details

 09-09-2019
7.50
Reinstall Panels, Wired Sure Start, Install Heater
Details

 09-06-2019
6.50
Installed GTP 59 ; Installed Throttle Quadrant
Details

 08-26-2019
7.75
Complete Brake & Alt Air Cables, Install Right Win
Details

 08-23-2019
4.00
Parking Break Cable & Paint Inside Lower Cowl
Details

 06-08-2016
2.00
Built DRDT Platform
Details

 06-07-2016
2.50
Inventory Tools
Details

 06-06-2016
7.50
Inventory Quick Build Kits
Details
       

 05-30-2016
3.00
Quick Build Kits Delivered
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.