KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  9-24-2019
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Moved Shelves to Airport

Disassembled the 2 shelving units and moved them to the airport in my car. Didn't have room for 3 of the shelf boards, so will move those tomorrow.

Swept up and cleaned up a portion of the shop. Loaded a few of the small things we left behind into the car and moved those to the airport.

Reassembled the shelving units at KARM and slid them into the back corner along the back wall.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.