KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
< Previous Log Entry          Next Log Entry >
' style=
Date:  5-30-2016
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Quick Build Kits Delivered

Quick Build wings and fuselage finally delivered today, along with my empennage from Synergy Air that came in the same shipment. Used Partain Trucking to deliver it all in order to avoid crating and the requirement for a fork lift to get it off the truck and into my shop.

Spent about 3 hours moving all the parts from the truck into the shop, placing the wings in the wings cradle I built an the fuselage onto the dolly I built for it. The truck couldn't get down the driveway to the shop due to the tight turn and low tree branches, so the driver parked up on the road and we carried it all down to the shop from there.
' style=

Truck Delivering QB

Truck Delivering QB

' style=

Inside of Delivery Truck

Inside of Delivery Truck

' style=

QB Wings In Shop

QB Wings In Shop

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.