KitLog pro

Powered By Kitlog Pro v2.0

Dave's RV-10 Build Log
' style=
Date:  2-23-2020
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Final Prep for DAR Inspection

Removed nut plates from inside of seats. Installed nut plates on the outside of the seat adjusters lower bolt holes. Need to purchase compact nut plates for the upper bolt holes. Will use bolts with nuts for the upper holes and bolts with the nut plates for the lower holes for first flight, with the bolts inserted from inside the seats by removing the bottom seat cushion.

Removed top wing root fairings for inspection. Needed to remove one screw on each side by use of an easy out due to screw head stripping out.

Used a multi-turn potentiometer to calibrate the right fuel tank levels, by setting the pot to get the voltage recorded at each calibration point and entering it into the system.

Updated all G3X data bases with data from subscription downloaded last night.

Installed the side covers, which were difficult to get into place as they needed to slide behind other covers as some points, but on top at other points.

N76KL is now ready for inspection tomorrow!!!
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.